Loading…
Loading…
Tender Value
₹23.1 L
EMD Value
₹46,164
Closing Date
18 May 2026, 3:00 pmClosed
O/O the Executive Engineer, Div-III, AMC
Executive Engineer, Div-III, AMC
Construction of Community hall cum shelter house near Apanjan Club
2026_SAMC_72787_1
06/EE/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
AMC
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹46,164
Yes
12 May 2026
12 May 2026
19 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in foundation frenches or drains not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead of 50 m All kind of soi | - | cum | 1 | - |
| 2 | Supplying and filling in plinth under floor foundation etc with snd fine from local quarry with all lift includingspreading in horizontal layer watering gradng to required slop ramming consolidating and compacting each layer by usingplate compactor or by any suitable method complete. | 1 | cum | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete of specified grde excluding the cost of centering and shuttering All work upto plinth level 1:3:6( 1cement:3 fine sand:6 geded well burnt brick aggregate 20 mm niminal size) | - | sqm | - | - |
| 4 | Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass
concrete with timber plank | - | sqm | 1 | - |
| 5 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with
wooden plank | - | sqm | - | - |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for: )Lintels, beams, plinth beams, girders, bressumers and
cantilevers with wooden plank | 1 | sqm | - | - |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access
platform with timber planks | 0.2 | sqm | - | - |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for: Stairs (excluding landings) except spiral-staircases with
wooden plank | - | sqm | - | - |
| 9 | Reinforcement for RCC work including straightening cuting bending placing in position and binding complete upto plinth level thermo-Mechanically Treated bars grade Fe 500D or more | 0.4 | kg | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level:1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
DNIT.pdf
Tender Documents • 4.05 MB
BOQ_74072.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .