| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹45.9 L (22.0%)Admitted-Finance | ₹2.5 Cr+₹45.9 L (22.0%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹59.2 L (28.4%)Admitted-Finance | ₹2.7 Cr+₹59.2 L (28.4%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹77.0 L (36.9%)Admitted-Finance PLOT 1 SECTOR B POCKET 1 LOCAL SHOPPING COMPLEX VASANT KUNJ NEW DELHI 110070 | ₹2.9 Cr+₹77.0 L (36.9%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SREEKRISHNACONSTRUCTIONS L3 | DALAVAI INFRASTRUCTURE L1 | RMS CONSTRUCTION PVT. LTD. L4 | PMR CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00SUB HEAD - I : RESURFACING OF EXISTING ROAD | |||||||
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil. | 250 | SQM | 27 ₹6,750 Lowest | 180 ₹45,000 | 100 ₹25,000 | 197 ₹49,250 |
| 1.00 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. bituminous portion | 200 | CUM | 450 ₹90,000 Lowest | 2,250 ₹4,50,000 | 2,200 ₹4,40,000 | 1,692 ₹3,38,400 |
| 1.00 | Supplying and stacking at site Good Earth | 100 | CUM | 450 ₹45,000 Lowest | 630 ₹63,000 | 650 ₹65,000 | 1,269 ₹1,26,900 |
| 1.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. | 100 | CUM | 45 ₹4,500 Lowest | 126 ₹12,600 | 115 ₹11,500 | 1,198 ₹1,19,800 |
| 1.00 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm | 68,615 | SQM | 27 ₹18,52,605 | 33.3 ₹22,84,879.5 | 80 ₹54,89,200 | 26 ₹17,83,990 Lowest |
| 1.01Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler,transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. | |||||||
| 1.01 | a) 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity | 68,615 | SQM | 360 ₹2,47,01,400 | 261 ₹1,79,08,515 Lowest | 325 ₹2,22,99,875 | 329 ₹2,25,74,335 |
| 1.01 | Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete.
New work (Two or more coats) | 380 | SQM | 207 ₹78,660 Lowest | 252 ₹95,760 | 600 ₹2,28,000 | 1,191 ₹4,52,580 |
Tender Value
Refer Docs
EMD Value
₹4.6 L
Closing Date
28 Nov 2022, 2:00 pmClosed
GDG Prasad Raju, Sc F, CCE
CCE (RnD) Estates South Chandrayangutta Hyderabad - 05
Resurfacing and Repairs of Roads at Site-K, Kolar
2022_DRDO_721952_1
CCEESTS/ENQ/KOLAR/ROADS/ 58/2022-23
Limited
Miscellaneous Works
Item Rate
180 days
Kolar
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
CCE (RnD) Estates South
₹4.6 L
Yes
7 Dec 2022
5 Nov 2022
29 Nov 2022
5 Nov 2022
28 Nov 2022
5 Nov 2022
Amount
SUB HEAD - I : RESURFACING OF EXISTING ROAD
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil.
Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. bituminous portion
Supplying and stacking at site Good Earth
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler,transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
a) 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete. New work (Two or more coats)
PMR CONSTRUCTIONS
SREEKRISHNACONSTRUCTIONS
RMS CONSTRUCTION PVT. LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .