Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹18.6 Cr Construction of 17 Nos. Forward BOPs (14 Nos. Company level and 3 Nos. BOPs Platoon level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: C/o 2 Nos. Company Level BOP at Hariamuni Para and Bajrangi Including internal Electrification, Installation i/c Compound lights & Service connection to buildings. (Package-III)(Re-call). | Construction of 17 Nos. Forward BOPs (14 Nos. Company level and 3 Nos. BOPs Platoon level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: C/o 2 Nos. Company Level BOP at Hariamuni Para and Bajrangi Including internal Electrification, Installation i/c Compound lights & Service connection to buildings. (Package-III)(Re-call). | L1 | |
| 2 | L2₹20.5 Cr+₹1.9 Cr (10.3%) Construction of 17 Nos. Forward BOPs (14 Nos. Company level and 3 Nos. BOPs Platoon level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: C/o 2 Nos. Company Level BOP at Hariamuni Para and Bajrangi Including internal Electrification, Installation i/c Compound lights & Service connection to buildings. (Package-III)(Re-call). | Construction of 17 Nos. Forward BOPs (14 Nos. Company level and 3 Nos. BOPs Platoon level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: C/o 2 Nos. Company Level BOP at Hariamuni Para and Bajrangi Including internal Electrification, Installation i/c Compound lights & Service connection to buildings. (Package-III)(Re-call). | L2 |
| Sl No | Description | Qty | Unit | Dipak Nag L2 | DEBASIS BHATTACHARYYA L1 |
|---|---|---|---|---|---|
| 1 | As Per Total Schedule of Quantity(Civil Component) | - | - | 8.5 ₹18,51,19,347.35 | -1.65 ₹16,78,01,730.99 Lowest |
| 2 | As Per Total Schedule of Quantity(Electrical Component) | - | - | 8.5 ₹1,95,53,003.09 | -1.65 ₹1,77,23,851.18 Lowest |
Tender Value
₹18.9 Cr
EMD Value
₹28.9 L
Closing Date
22 Sept 2022, 3:00 pmClosed
AE(C)-3
Om Prakash Agrawal
O/O THE EXECUTIVE ENGINEER, BORDER FENCING DIVISION-III
Construction of 17 Nos. Forward BOPs (14 Nos. Company level and 3 Nos. BOPs Platoon level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: C/o 2 Nos. Company Level BOP at Hariamuni Para and Bajrangi Including internal Electrification, Installation i/c Compound lights & Service connection to buildings. (Package-III)(Re-call). Subwork/Packages: C/o of 2 Nos Company Level BOP at Hariamuni Para and Bajrangi including internal Electrification, installation i/c compound lights & service connection to Buildings. (Package-III)(Re-Call)
18223
05/NIT/CE/SE/EE/BFD-III/AGT/2022-23
OPEN
Civil Works - Buildings
NCB
540 days
West Tripura, Tripura
7 documents required · 7 mandatory
₹28.9 L
Not Applicable
22 Sept 2022
6 Sept 2022
22 Sept 2022
22 Sept 2022
22 Sept 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT05PACKAGE03recall.pdf
document • 19.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .