Tender Value
₹10.0 L
EMD Value
₹12,500
Closing Date
28 Aug 2026, 3:00 pm5d left
Staff Officer (C) Barka Sayal Area
GM (BS) UNIT BARKA SAYAL AREA
Strengthening of public Infrastructure and improving facilities at Buccha Band,Patratu under CSR scheme of Barka-Sayal Area
2026_CCL_363891_1
GM(BS)/Civil/Tender/26-27/308
Open Tender
Civil Works - Others
Percentage
30 days
GM Unit
Please refer Tender documents.
3 documents required · 3 mandatory
₹12,500
17 Aug 2026
17 Aug 2026
29 Aug 2026
18 Aug 2026
28 Aug 2026
18 Aug 2026
18 Aug 2026 - 21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 9 | cum | 205.8 | ₹1,852.2 |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 3 | cum | 118.65 | ₹355.59 |
| 1.04 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 0.45 | cum | 1,438.15 | ₹647.17 |
| 1.05 | Providing and laying cement concrete of specified grade excluding the cost of centering and shuttering in all works up to plinth level : 1:4:8 (1cement : 4 fine sand : 8graded stone aggregates 40 mm nominal size). | 0.9 | cum | 6,072.4 | ₹5,465.16 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.94 | cum | 8,343.45 | ₹41,250.02 |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 9.41 | cum | 9,829.55 | ₹92,456.75 |
| 1.08 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.53 | cum | 9,466 | ₹23,948.98 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars | 1,509 | Kg | 105.6 | ₹1,59,350.4 |
| 1.1 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc. for mass concrete | 22.5 | sqm | 277.9 | ₹6,252.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.46 MB
BOQ_376804.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].