Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 L+₹3,859.85 (1.82%)Rejected-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | ₹2.2 L+₹3,859.85 (1.82%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 5 | Rejected-Technical KERALA KL | IDUKKI | KERALA | 685501 | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | JAYAN NAIR L2 | Sreekrishna Constructions L3 | MOHAMMED ISMAIL A L5 | SEENA P S L1 | Suresh Kumar G L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00ROAD RENOVATION | ||||||||
| 1.00 | OD97668/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. (Modified DAR Item No.60.7.3) | 1.86 | cum | 588.81 ₹1,095.19 | 806 ₹1,499.16 | 657.5 ₹1,222.95 | 577 ₹1,073.22 Lowest | 700 ₹1,302 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 14.6 | cum | 329.41 ₹4,809.39 | 451 ₹6,584.6 | 367.8 ₹5,369.88 | 323 ₹4,715.8 Lowest | 400 ₹5,840 |
| 1.00 | OD98112/2026-2027:DRY RUBBLE MASONRY with hard stone for foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. (MORD 75.7.1 modified) | 42.31 | cum | 4,613.22 ₹1,95,194.56 | 4,600 ₹1,94,635.2 | 5,151 ₹2,17,949.11 | 4,531 ₹1,91,715.67 Lowest | 4,790 ₹2,02,674.48 |
| 1.00 | OD98113/2026-2027:DRY RUBBLE MASONRY WITH DEPARTMENTAL RUBBLE with hard stone for foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. (MORD 75.7.1 modified) | 1.49 | cum | 2,927.19 ₹4,355.66 | 4,010 ₹5,966.88 | 3,268 ₹4,862.78 | 2,875 ₹4,278 Lowest | 3,800 ₹5,654.4 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1.46 | cum | 7,128.59 ₹10,407.74 | 7,000 ₹10,220 Lowest | 7,960 ₹11,621.6 | 7,000 ₹10,220 Lowest | 7,600 ₹11,096 |
Tender Value
₹3.0 L
EMD Value
₹7,394
Closing Date
24 Jul 2026, 6:00 pmClosed
Assistant Engineer
O/o the Assistant Engineer,LSGD Section,Nellanad G.P, Venjaramoodu P.O, Thiruvananthapuram (dist) Pin 695607
Annual Plan-Nellanad GP 45/26-27 Ullas Nagar Gurunagappan kavu Chira Road Renovation in ward 2
2026_LSGD_861153_1
45/2027
Open Tender
Civil Works - Roads
Item Rate
180 days
venjaramoodu
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,394
Yes
8 Sept 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD RENOVATION | |||||
| 1.001 | OD97668/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. (Modified DAR Item No.60.7.3) | - | cum | - | - |
| 1.002 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 1 | cum | - | - |
| 1.003 | OD98112/2026-2027:DRY RUBBLE MASONRY with hard stone for foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. (MORD 75.7.1 modified) | 1 | cum | - | - |
| 1.004 | OD98113/2026-2027:DRY RUBBLE MASONRY WITH DEPARTMENTAL RUBBLE with hard stone for foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. (MORD 75.7.1 modified) | - | cum | - | - |
| 1.005 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1456341.xls
BOQ • 0.30 MB
04IpactandAffidavit.pdf
Tender Documents • 0.35 MB
45SBD.pdf
Tender Documents • 1.87 MB
03Agt.pdf
Tender Documents • 0.05 MB
05FORM.pdf
Tender Documents • 0.01 MB
06Epaymentform.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .