| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical A 104 SYMPHONY FLOT NO 9 NEAR SAHJANAND CHOWK HARMU HOUSING COLONY HARMU RANCHI JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834002 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical P 26 CITY CENTER SECTOR 4 BOKARO | Admitted-Fee/PreQual/Technical |
Tender Value
₹30.3 Cr
EMD Value
₹30.4 L
Closing Date
17 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer R.C.D. Road Division Chaibasa
Office of the Executive Engineer R.C.D. Road Division Chaibasa West Singhbhum Jharkhand
Widening/Strengthening and Re-construction of Road from HATA-CHAIBASA (NH-220) RAILWAY CROSSING TO BARACHIRU AND POWER GRID LINK ROAD (Total Length 11.110 KM) under Road Division Chaibasa for the year 2025-26.
2025_CECOM_107026_1
RCD/CHAIBASA/2025-26/11
Open Tender
Civil Works
Item Rate
365 days
WEST SIINGHBHUM
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹30.4 L
Chief Engineer Comm., RCD, Jharkhand Ranchi
21 Jan 2026
26 Nov 2025
18 Dec 2025
26 Nov 2025
17 Dec 2025
26 Nov 2025
4 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300mm to 600mm | 95 | No | 612.7 | ₹58,206.5 |
| 2 | Cutting of trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600mm to 900mm | 63 | No | 925.6 | ₹58,312.8 |
| 3 | Cutting of trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900mm to 1800mm | 132 | No | 1,434.8 | ₹1,89,393.6 |
| 4 | Cutting of trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceble material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth above 1800mm | 141 | No | 2,543.7 | ₹3,58,661.7 |
| 5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. | 15.55 | Hect | 88,499.5 | ₹13,76,167.23 |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. Deck Slab | 112.5 | m3 | 887 | ₹99,787.5 |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. Brick Masonary | 1,436.4 | m3 | 286.3 | ₹4,11,241.32 |
| 8 | Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately | 236 | No | 185.1 | ₹43,683.6 |
| 9 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 24,559.35 | m3 | 62.4 | ₹15,32,503.44 |
| 10 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty@Rs 27.48/cum | 22,630.21 | m3 | 61.48 | ₹13,91,305.31 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
sbd11.pdf
Tender Documents • 0.72 MB
BOQ_144466.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .