Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹42.4 L
EMD Value
₹43,000
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Shedhi Irrigation Division Nadiad
Construction of a new RCC Canal syphon in place of the existing brick masonry Canal syphon at Ch.90 mt & Ch.5490 mt on the Mahisa Distributary.
364113
10 of 2026-27
Open
Civil Works - Canal
Works
Nadiad
13 documents required · 10 mandatory · 3 optional
₹1,500
Executive Engineer Shedhi Irrigation Division Nadiad
₹43,000
6 Nov 2026
6 Nov 2026
6 Nov 2026
25 Nov 2026
6 Nov 2026
120 days
Name of Work :- masonry Canal syphon at ch. 90 m & ch. 5490 m on the Mahisa
Estimated Qty Estimated Rate Amount as per
may be more or Discription of item Per Estimated
In figur In words
Dismantling the existing brick masonry
including sorting out and stacking the useful Rs. Seven Hundred
1 78.00 material and removing the debris and making 750.90 Fifty & Ninety Paise Cum
good the damages etc. complete as directed. Only
In Cement Mortar
Dismantling the existing R.C.C. Pipes
including sorting out and stacking of the useful
materials of the following diameters including Rs. One Thousand
2 30.00 refilling the trenches etc. complete as 1270.70 Two Hundred Seventy meter
directed. & Seventy Paise Only
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including Rs. One Hundred
3 862.00 depositing the excavated stuff in uniform 107.80 Seven & Eighty Paise Cum
layers in banks or as and where directed etc. Only
complete for lead up to 500m and all lift. (BY
MACHINERY) Including dewatering.
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement, sand
and crushed aggregate by mass and machine
mix for C.C./R.C.C work incl. necessary
formworks centering, scaffolding, compaction Rs. Three Thousand
4 124.00 by vibrator, curing as directed with all lead & 3346.00 Three Hundred Forty Cum
lift etc complete Without Dewatering and Six Only
excluding cost of steel reinforcement.
(A) For Foundation concrete / General
(a) C. C. Nominal Mix, M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and
crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc Rs. Four Thousand
5 428.00 complete without dewatering and excluding 4190.00 One Hundred Ninety Cum
the cost of steel reinforcement. Only
(A) For Footing of column / Abutment / Pier /
Bottom slab of barrel / Plinth course / Coping /
Approach Slab etc.
(a) Concrete grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and
crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator,
Rs. Five Thousand Six
curing as directed with all lead & lift etc
6 141.00 5642.00 Hundred Forty Two Cum
complete without dewatering and excluding
the cost of steel reinforcement. Only
(E) For Column / Beam / Solid Slab of Road
Bridge / Barrel / Cutoff wall etc.
(q) Concrete grade M-25 and MSA-20 mm
Providing and fixing in position ( different
diameter ) I.S.,NP-3 class reinforced pipe with
caulking the joints with cement mortar 1:1 Rs. Five Thousand
proportion,using jute string soaked in cement Nine Hundred Fifty
slurry, finishing joints and laying pipes to the Five & Thirty Paise
designed grade and levels, curing etc. Only
complete for all leads and lifts.
NP-3 class 1200 mm dia pipe.
Providing & Placing in position reinforcement
Rs. Seven Thousand
bars inclu. cutting, bending, welding joints
8 120.00 7194.00 One Hundred Ninety Qtl
where necessary, hooking etc. complete as
per drawing for all lead and lifts. TMT Four Only
Construction of a new RCC Canal syphon in place of the existing brick
Name of Work :- masonry Canal syphon at ch. 90 m & ch. 5490 m on the Mahisa
Estimated Qty Estimated Rate Amount as per
may be more or Discription of item Per Estimated
In figur In words
Back filling the foundation trenches around the
structures etc with selected excavated stuff Rs. Thirty Six &
including watering, ramming, compacting etc. Ninety Paise Only
complete. (By Machinery)
Rs. Forty Two Lac Forty Thousand Twenty Three Only
I/we am /are willing to carry out the work at ……... % above/below percent (should be written in figures and words) of the
estimated rates mentioned above . Amount of my/our tender works-out as under
Estimated amount Estimated amount
put to tender Rs : ______________ put to tender Rs : __________
Add % above Rs : ______________ Deduct %below Rs : __________
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
1 for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed by
supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in inkand total of
entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good for work
under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-24)
Signature of agency
Tender Clerk Deputy Executive Engineer
Shedhi Irrigation Division Dakor irrigation Sub Divition
Executive Engineer Divisional Accoutant
Shedhi irrigation Division Shedhi Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Final SBD_90_5490.pdf
02. Sch-B_90_5490.pdf
03. Item Wise Techanical Specification_90_5490.pdf
04. General and Technical specification_90_5490.pdf
05. CSY 90 - drg.pdf
06. CSY 5490 - drg.pdf
Tender Notice No.10 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .