Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | ₹1.2 L | L1 | Accepted-AOC 1No Bidder only |
| Sl No | Description | Qty | Unit | KUTSUN ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Loading & unloading of 9 Mt. PSC Pole | 5 | Each | 395 ₹1,975 |
| 2.00 | Transporting of 9 Mt. PSC Pole from road side | 5 | Each | 445 ₹2,225 |
| 3.00 | Excavation and erection of 9 Mt. PSC Pole | 5 | Each | 1,085 ₹5,425 |
| 4.00 | Earthing of pole | 2 | Loc | 139 ₹278 |
| 5.00 | Concreting of pole | 2 | Loc | 1,585 ₹3,170 |
| 6.00 | Loading & unloading of 8 Mt. PSC Pole | 8 | Each | 298 ₹2,384 |
| 7.00 | Transporting of 8 Mt. PSC Pole from road side | 8 | Each | 347 ₹2,776 |
| 8.00 | Excavation and erection of 8 Mt. PSC Pole | 8 | Each | 845 ₹6,760 |
| 9.00 | Erection of V Cross Arm | 3 | Each | 223 ₹669 |
| 10.00 | Erection of HT TI Fitting | 3 | Each | 74 ₹222 |
Tender Value
Refer Docs
EMD Value
₹1,052
Closing Date
10 Dec 2025, 2:00 pmClosed
Executive Engineer/Distribution/Urban/TTN
131, 132 Ettayapuram Road Tuticorin - 2
Imp Deviation LT 3ph 4W and 5W line and EOS to 1 No supply to ESI Hosp in Sipcot Section
2025_EB_626688_1
EE/D/U/TTN/ OT.WC No-023/25-26/Dt.26.11.2025
Open Tender
Electrical Works
180 days
Tuticorin
Refer in Tender Document
2 documents required · 2 mandatory
₹0
₹1,052
Yes
29 Dec 2025
26 Nov 2025
11 Dec 2025
26 Nov 2025
10 Dec 2025
26 Nov 2025
26 Nov 2025 - 10 Dec 2025
Amount
Loading & unloading of 9 Mt. PSC Pole
Transporting of 9 Mt. PSC Pole from road side
Excavation and erection of 9 Mt. PSC Pole
Earthing of pole
Concreting of pole
Loading & unloading of 8 Mt. PSC Pole
Transporting of 8 Mt. PSC Pole from road side
Excavation and erection of 8 Mt. PSC Pole
Erection of V Cross Arm
Erection of HT TI Fitting
Erection of Tapping Channel
Erection of Guarding Cross Arm
Erection of Guarding arrangement
Erection of 3 Phase Cross Arm
Erection of S Phase X Arm
Erection of LT side arm
Excavation and Erection of stay set
Loading and Unloading of 22 KV Metering Set
Transporting of 22 KV Metering Set
Erection of 22 KV Metering Set
Erection of 22 KV Metering Set Structure
Fixing of HT Polymer Insulators
Fixing of Polymer Disc
Fixing of Insulator, Shackle and Alu. Knob
Erection of HT line with AAAC 7/2.50 with 50 % LC
Erection of LT line with AAAC 7/2.50
Conversion of LT Pin point in to Cut point
Alteration of clamps
Reerection of LT line with ACSR 7/2.59,2.50
Refixing of Insulator, Shackle and Alu. Knob
Reerection of 3 Phase Cross Arm
Reerection of 3 Phase SC Wire
Reerection of LT TI Fitting
Reerection of SL Switch Box
Reerection of SL Fitting
Reerection of S Phase SC Wire
Releasing of Insulator, Shackle and Alu. Knob
Dismantling of LT line with ACSR 7/2.59, 2.50
Dismantling of 8 Mt. PSC Pole
Dismantling of 3 Phase Cross Arm
Dismantling of 3 Phase SC Wire
Dismantling of LT TI Fitting
Dismantling of SL Switch Box
Dismantling of SL Fitting
Dismantling of S Phase SC Wire
Dismantling of RSJ Pole
Dismatnling of 7.5 Mt. RCC Pole
Dismatnling of 7.5 Mt. PSC Pole
Grill separation
Dismantling of Stay
Transporting charges
G.S.T @18% should be entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_749350.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid