| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-AOC | ₹10 L | L1 | Accepted-AOC APPROVED IN TENDER COMMITTEE |
| Sl No | Description | Qty | Unit | Shanmuga engineering works L1 |
|---|---|---|---|---|
| 1.00 | Normal Ground - Excavation of Pole Pit (1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) | 1 | Each | 400 ₹400 |
| 2.00 | Normal Ground - Erection of 8m PSC Pole (200Kg) | 1 | Each | 450 ₹450 |
| 3.00 | Rocky Ground / Medium - Excavation of Pole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) | 1 | Each | 500 ₹500 |
| 4.00 | Rocky Ground / Medium - Erection of 8m PSC Pole (200Kg) | 1 | Each | 300 ₹300 |
| 5.00 | Hard Rocky Ground - Excavation of Pole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) | 1 | Each | 800 ₹800 |
| 6.00 | Hard Rocky Ground - Erection of 8m PSC Pole (200Kg) | 1 | Each | 300 ₹300 |
| 7.00 | Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 1.83m) for 9m PSC Pole | 1 | Each | 500 ₹500 |
| 8.00 | Normal Ground - Erection of 9m PSC Pole | 1 | Each | 600 ₹600 |
| 9.00 | Rocky Ground / Medium - Excavation of Pole pit(1.25m x 0.6m x 1.83m) for 9m PSC Pole | 1 | Each | 500 ₹500 |
| 10.00 | Rocky Ground / Medium - Erection of 9m PSC Pole | 1 | Each | 400 ₹400 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
1 Dec 2025, 2:00 pmClosed
SUPERINTENDING ENGINEER/TEDC/TUTICORIN
131, 132, ETTAYAPURAM ROAD, TUTICORIN
RATE RUNNING WORKS CONTRACT TO TIRUCHENDUR SUB DIVISION OF TIRUCHENDUR DIVISION
2025_EB_623967_1
SE/TEDC/TTN/MM/WC.011/25-26 DT.15.11.25
Open Tender
Electrical and Maintenance Works
365 days
TUTICORIN
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹10,000
Yes
12 Feb 2026
17 Nov 2025
2 Dec 2025
17 Nov 2025
1 Dec 2025
17 Nov 2025
17 Nov 2025 - 1 Dec 2025
Amount
Normal Ground - Excavation of Pole Pit (1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg)
Normal Ground - Erection of 8m PSC Pole (200Kg)
Rocky Ground / Medium - Excavation of Pole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg)
Rocky Ground / Medium - Erection of 8m PSC Pole (200Kg)
Hard Rocky Ground - Excavation of Pole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg)
Hard Rocky Ground - Erection of 8m PSC Pole (200Kg)
Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 1.83m) for 9m PSC Pole
Normal Ground - Erection of 9m PSC Pole
Rocky Ground / Medium - Excavation of Pole pit(1.25m x 0.6m x 1.83m) for 9m PSC Pole
Rocky Ground / Medium - Erection of 9m PSC Pole
Hard Rocky Ground - Excavation of Pole pit(1.25m x 0.6m x 1.83m) for 9m PSC Pole
Hard Rocky Ground - Erection of 9m PSC Pole
Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36' length/Rail pole
Normal Ground - Erection of Pit (1.25m x 0.6m x 2.19m) for above 9.14 poles / Steel Joists 36' length/Rail pole
Rocky Ground / Medium - Excavation of Pole pit (1.25m x 0.6m x 2.19m) for above 9.14 poles/ Steel Joists 36' length/Rail pole
Rocky Ground / Medium - Erection of Pit (1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36' length/Rail pole
Hard Rocky Ground - Excavation of Pole pit(1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36' length/Rail pole
Hard Rocky Ground - Erection of above 9.14 poles Steel Joists 36' length/Rail pole
Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42' length
Normal Ground - Erection of Steel Joists 42' length
Rocky Ground/Medium - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42' length
Rocky Ground/Medium - Erection of Steel Joists 42' length
Hard Rocky ground - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42' length
Hard Rocky ground - Erection of Steel Joists 42' length
Transporting of 42' twin RSJ pole from road side to pole pit
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
Excavation & Erection of Twin 42'2' fabricated RSJ pole
Concreting of 42' twin RSJ pole
Loading & Unloading of 42' Twin RSJ pole
Transporting of Pole from road side to pole pit - 7.5m, 8m RCC/PSC Pole
Transporting of Pole from road side to pole pit - 9m, 9.14m RCC/PSC Pole
Transporting of Pole from road side to pole pit - 36' RSJ Pole
Transporting of Pole from road side to pole pit - 42' RSJ Pole
Loading & Unloading of pole - 7.5m, 8m RCC/PSC Pole
Loading & Unloading of pole - 9m, 9.14m RCC/PSC Pole
Loading & Unloading of pole - RS Joists, Tubular & Rail Pole above 9.14m
Mass Concreting of Poles as per Board Standards(2' x 2' x 5' ) The material such as sand, jelly, etc have to be supplied by the contractor including cement(cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges for placing, transport of sand, jelly, form box and water curing for 14 days etc complete) without coping.
Sleeve Concreting for poles on the line (All the materials including 20mm jelly, cement with 1:2:4 Ratio ( 0.5m x 0.45mx0.9m ) 0.202 cu.m
Coping of poles with form work (0.6mx0.6mx0.35m) including materials 20mm jelly and cement etc., Ratio 1:2:4
Earthing of poles with GI Wires 4 or 6 SWG by coil earthing
Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length
Normal ground-Excavation of stay pit (1.00m X 0.5m X 1.5m)
Normal ground - Erection of Stay set
Medium ground-Excavation of stay pit (1.00m X 0.5m X 1.5m)
Medium ground - Erection of Stay set
Hard Rocky ground - Excavation of stay pit (1.00m X 0.5m X 1.5m)
Hard Rocky ground - Erection of Stay set
Concreting of stay (0.3m x 0.3m x 1.5m) including materials and cement. 1:4:8 Ratio/ 40mm Jelly
Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.
Fixing of Tapping Channel Cross Arm including transport of materials from road side to site
Fixing of Guarding Cross Arm including transport of materials from road side to site
Fixing of V Cross arm/Channel cross arm 3.5' including transport of materials from road side to site
Fixing of V Cross arm/Channel cross arm 4.5' including transport of materials from road side to site
Fixing of V Cross arm/Channel cross arm 5' including transport of materials from road side to site
Fixing of LT 3 Phase cross arm including transport of materials from road side to site
Fixing of LT Single Phase cross arm including transport of materials from road side to site
Fixing of HT/LT TI Fitting including transport of materials from road side to site
Erection of HT side arm with stud
Erection of LT side arm with stud
Fixing of HT Pin Insulators with pin for 11KV, 22KV & 33KV
Fixing of HT Strain Disc with metal parts for 11KV, 22KV & 33KV
Fixing of LT PIN Insulator/Shackles
Fixing of Aluminium knob
Fixing of HT LAS (3 Nos)
Fixing of LT LAS (3 Nos)
Removing Insulators
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with outLC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (without LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (without LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For Dog conductor (with LC @ 50%)
HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For Dog conductor (without LC @ 50%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with out LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with out LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (without LC @ 30%)
LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For PVC cables (with out LC @ 30%)
HT Line re-sagging - For 7/2.59 ACSR / AAAC 7/2.50
HT Line re-sagging - For 7/3.35 ACSR / AAAC 7/3.15
HT Line re-sagging - For 7/4.09 ACSR
HT Line re-sagging - For Dog conductor
LT Line re-sagging - For 7/2.59 ACSR / AAAC 7/2.50
LT Line re-sagging - For 7/3.35 ACSR / AAAC 7/3.15
LT Line re-sagging - For 7/4.09 ACSR
Loading of Conductor/Per Drum
Unloading of Conductor/Per Drum
For HT - Conversion of Pin point to cut point
For LT - Conversion of Pin point to cut point
Flat Guarding (2 wires) (Split neutral guarding)
Flat Guarding (4 wires)
Cradle Guarding (6 Wires) (Fixing of 'X' arm lacing)
Fixing of earthing device with Stud
For Double Pole Transformer Structure: This work involves the erection and concreting of poles provision of three earth pits and stays, Lighting arrestors, AB Switch, HG. Fuse Seating channel etc., together with earthing as per TNEB Standards (ie. All the works except erection of Transformer feeder cables with 5 bags cement supplied by contractor)
Erection of Poles and Stay Sets
Loading and Unloading of Poles from road side to Pole pit (2 Nos.)
Transporting of Poles from road side to Pole pit (2 Nos.)
Excavation of structure pole pits (2 No's)
Erection of structure poles (2 No's)
Excavation of stay pits (4 No's)
Erection of stay set (4 Nos)
Concreting of structure poles including materials Mass Concrete with Copping (2 poles)
Concreting of stays (4 Nos) including all material
Erection of Structure materials
Top channel
Transformer seating channel and belting angle
AB switch (complete)
HG Fuse (complete)
Jumpering
HT LAS (3 Nos.)
LT LAS (3 Nos.)
Transformer LT cable wiring / LT Bus Bar
Fabrication & Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending , fabrication etc.,
Earthing system
Excavation and erection of 3 Nos. earth pits in complete shape (Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, LAS etc., including neutral connection)
Mason works for earth pits including Materials
Painting of transformer structure 2 coats including paint Cost
Painting with Distember paint on poles including paint Cost
Spreading yard jelly and cut stone and bricks including material
Writing of name board and target board including paint Cost in the DT Str.
Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole from sectio/Store to location
Fixing Of Danger Board supplied by Board
For Tapping Structure: Erection of Tapping Structure as per Boards standard including stay erection, earthing work with AB Switch fixing work
Erection of Poles and Stay Sets
Loading and Unloading of Poles fro road side to Pole pit (2 Nos.)
Transporting of Poles from road side to Pole pit (2 Nos.)
Excavation of structure pole pits (2 No's)
Erection of structure poles (2 No's)
Excavation of stay pits (4 No's)
Erection of stay set (4 Nos)
Concreting of structure poles including materials Mass Concrete with Copping (2 poles)
Concreting of stays (4 Nos) including all material
Erection of Structure materials
Top channel
AB switch (complete)
Fixing of cross bracing
Earthing system
Excavation and erection of 1 No. earth pits (Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.)
Mason works for earth pit (including material)
Colour coating on poles with iron materials including paint and distember.
Fixing Of Danger Board
Fixing of Double Pole AB Switch only
SINGLE POLE TRANSFORMER STRUCTURE ERECTION
Erection of Poles and Stay Sets
Loading and Unloading of Poles from road side to Pole pit
Transportation of pole from road side to pole pit by using JCB or Manual
Excavation of structure pole pit 3’ x 6’ by using JCB or Manual
Erection of poles by using JCB or Manual
Excavation of stay pit by JCB or Manual (2 Nos.)
Erection of stay set complete (2 Nos.)
Mass concreting for structure
Stay Concrete (2 Nos.)
Erection of Structure materials
Erection of Tapping channel
Erection of Transformer Bed Stucture
Erection of AB switch
Erection of H.G. Fuse
Structure earthing complete with 2 pits and earth loops
Fixing of MCD Box with Meter
HT-LAS fixing (3 Nos.)
LT-LAS fixing (3 Nos.)
HT jumpering complete
Painting of all clamps and other iron materials and painting of structure pole
Fabrication & Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending, fabrication etc.,
Fixing of Danger board
Writing of name board and target board including paint Cost in the DT Str.
Erection of Centre support with out concreting
Erection / Dismantling of Transformer - Upto 25 KVA Distribution Transformer
Erection / Dismantling of Transformer - Above 25 KVA to 100KVA
Erection / Dismantling of Transformer - Above 100 KVA to 250KVA
Erection / Dismantling of Transformer - 500KVA and above
Erection of Open type unit with feeder cable per feeder
Erection of Open Type unit - For each additional feeder
For DT structure Bus bar arrangement
Transporting of Distribution Transformer / Metering Set up to 15 Kms.
Loading / Unloading of Metering Set
Erection / Dismantling of Metering Set
Loading and Unloading of Distribution Transformer - Upto 25 KVA Distribution Transformer
Loading and Unloading of Distribution Transformer - Upto 25KVA to 100KVA
Loading and Unloading of Distribution Transformer - Upto 100KVA to 250KVA
Loading and Unloading of Distribution Transformer - Upto 500KVA and above
Plinth work for 500KVA DT
For Painting of transformer structure 2 coats including paint Cost
For Pole colour washing
For Painting of Transformer only
For Numbering of poles
For Numbering of poles with paint
For Metal Poles with HT Guarding cross arm
For Metal Poles with LT cross arms
Manufacturing of clamps - With 50 x 8 mm Flat
Manufacturing of clamps - With 65 x 10 mm Flat
Manufacturing of clamps - HT Tension Clamp
Alteration of Clamp
Welding of corroded Pole with 4 Pieces of steel angle/Channel including concreting of pole with coping (form work) with 1:2:4 Ratio ( 0.5m x 0.45mx0.9m ) 0.202cu.m (Steel piece alone will be supplied by the Board)
Welding Joint for the new RSJ Pole at Work shop per foot run of welding.
Drilling - Less than 25mm holes
Slotted holes
Cutting of Channel
Cutting of Flat
Cutting of Angle
Cutting of RSJ Pole
Cutting of Tubular pole
Cutting of Rail pole cutting
Service Connection Wires temporarily dismantling and re-erection: Single Phase Service connection
Service Connection Wires temporarily dismantling and re-erection: Three Phase Service Connection
Service Connection Wires temporarily dismantling and re-erection: Three Phase Service Connection above 50 HP
Grill seperation from deteriorated poles including transport to section (with concrete)
Grill seperation from deteriorated poles including transport to section (with out concrete)
Dismantling of 7.5m /8m pole with out damage
Dismantling of 9.14m pole/ RSJ with out damage
Dismantling of 7.5m /8m pole with damage
Dismantling of 9.14m pole/ RSJ with damage
Dismantling of stay set complete
Replacement of detoriated stay rod
Manufacturing of HG Fuse stool per set including materials
Tree Cutting - For ordinary Tree clearance
Tree Cutting - For Coconut trees
Tree Cutting - For Palmrah trees
Rectification of Leaning Pole - 7.5/8Mts. RCC, PSC Poles
Rectification of Leaning Pole - 9.14mts RCC/RSJ & Tubular pole
Transporting of Materials from Section office/ Store to road side of work spot by Cart
Fixing of Phase Seperator- Two Nos. per Span (4 Wire and 5 Wire)
Fixing of Phase Seperator- Two Nos. per Span (2 Wire )
Renewal of deteriorated Earth Pipes
Loading / Unloading of line materials
Provision of Danger Board including materials and painting as per Board Norms
Erection of concrete earth tub to DT Earth pipe
Dismantling of detoriated cables of various sizes (95, 120, 185 sq.mm) from DT LT bushing to LT open type clamp and erection of suitable lug at both ends
Distmantling and erection of LT Open Type fuse unit aluminium clamp
Fencing of DT Structure fabrication and erection with Standard specification (with 7 Nos. Cement Pillers of height 6" + wire mesh fenching 2" * 2" square sized and gate)
Provision of DT Name board including Materials
Erection of new 10' earth pipe by replacing the corroded earth pipe and renewal of earthing including burying, looping and binding
Dismantling of stay set complete including stay rod
Dismantling of stay set complete with out stay rod
Dismantling of HT OR LT Conductor (7/2.59 ACSR / AAAC 7/2.50) including transporting the conductors to the nearest road side and stocking in coils.
Dismantling of HT OR LT Conductor (7/3.35 ACSR / AAAC 7/3.15) including transporting the conductors to the nearest road side and stocking in coils.
Dismantling of HT OR LT Conductor (7/4.09 ACSR) including transporting the conductors to the nearest road side and stocking in coils.
Dismantling of HT Conductor (Dog conductor) including transporting the conductors to the nearest road side and stocking in coils.
Dismantling and Re-erection of Conductors - For HT OR LT - (7/2.59 ACSR / AAAC 7/2.50)
Dismantling and Re-erection of Conductors - For HT OR LT - (7/3.35 ACSR / AAAC 7/3.15)
Dismantling and Re-erection of Conductors - For HT OR LT - (7/4.09 ACSR)
Dismantling and Re-erection of Conductors - For HT - (Dog conductor)
Dismantling of Transformer Structure materials complete set and transporting the same from the location to the road side
Dismantling of Tapping Channel Cross Arm including transport of materials from road side to site
Dismantling of Guarding Cross Arm including transport of materials from road side to site
Dismantling of V Cross arm/Channel cross arm 3.5' including transport of materials from road side to site
Dismantling of V Cross arm/Channel cross arm 4.5' including transport of materials from road side to site
Dismantling of V Cross arm/Channel cross arm 5' including transport of materials from road side to site
Dismantling of LT 3 Phase cross arm including transport of materials from road side to site
Dismantling of LT Single Phase cross arm including transport of materials from road side to site
Dismantling of HT/LT TI Fitting including transport of materials from road side to site
Dismantling of HT side arm with stud
Dismantling of LT side arm with stud
Dismantling of HT Pin Insulators with pin for 11KV, 22KV & 33KV
Dismantling of HT Strain Disc with metal parts for 11KV, 22KV & 33KV
Dismantling of LT PIN Insulator/Shackles
Dismantling of Aluminium knob
Dismantling of HT LAS (3 Nos)
Dismantling of LT LAS (3 Nos)
Hiring of JCB per 1 Hour
Hiring of JCB for exceeding 1 hour for every hour
Hiring of Crane per Hour
Hiring of Crane for exceeding 1 hour for every hour
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_746062.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid