Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L2₹4.2 L+₹36,508.31 (9.45%)Admitted-Finance | L2 | Admitted-Finance | ||
| 5 | L3₹4.4 L+₹51,492.68 (13.3%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,300
Closing Date
1 Jul 2026, 6:00 pmClosed
XEN
Nowshera
Repair of protection work of Dugwell Jambo Chaid under WSS Upper Bhajwal-B damaged due to flash flood under SASCI.
2026_PHE_312813_12
e-NIT No. 06 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
XEN
₹10,300
Yes
8 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in tranches for foundation, drains, pipes, cables etc. (Not exceeding 1.5m in width) and for shafts, wells, cess pits and the like not exceeding 10 Sqm on plan, depth upto 1.5m, including disposal of excavated earth upto 1 mtr from cutting edge, disposal earth is to be levelled and neatly dressed in
All kinds of soils | 22.4 | cum | 479.3 | ₹10,736.32 |
| 2 | Providing and laying in position cement conc. Of sepcified grade excluding cost of Centering & Shuttering all work up to plinth level 1:4:8 (1 Cement: 4 Coarse sand: 8 graded crused stone aggregate 40mm nominal size. | 3.05 | cum | 5,202.9 | ₹15,868.84 |
| 3 | providing and laying in position cement conc. Of sepcified grade excluding cost of Centering & Shuttering all work up to plinth level 1:3:6 (1 Cement: 3 Coarse sand: 6 graded crused stone aggregate 20mm nominal size. | 55.14 | cum | 5,733.6 | ₹3,16,150.7 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:-
a) Foundations, footings, bases of columns etc. for mass concrete. | 21.9 | Sqm | 286.35 | ₹6,271.07 |
| 5 | b) Walls (any thickness) including attached pilasters, butterness, plinth and string courses etc. | 105.3 | Sqm | 628.95 | ₹66,228.44 |
| 6 | 12mm cement plaster mix: 1:4 (1 Cement: 4 Coarse sand) | 60.15 | Sqm | 283.8 | ₹17,070.57 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 17.92 | Cum | 218.4 | ₹3,913.73 |
| 8 | Providing and fixing of 80mm dia PVC pipe for Weep hole in Protection work. | 60 | Nos | 50 | ₹3,000 |
| 9 | Carriage of materials from nearest source to site of work including loading/unloading and stacking complete in all terrains:
a) Sand 60Km from nearest source to road side of work by M.T. & 100m from road side to site of work by H.L. | 28.42 | cum | 1,095.9 | ₹31,145.48 |
| 10 | b) Stone agg. below 40mm nominal size 30Km from nearest source to road side of work by M.T. & 100m from road side to site of work by H.L. | 51.78 | cum | 764.7 | ₹39,596.17 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1012483.xls
BOQ • 0.28 MB
Corrigendum01.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .