Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC 1st lowest bidder | |
| 2 | L2₹6.9 L+₹602.43 (0.09%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest bidder | |
| 3 | L3₹6.9 L+₹1,004.49 (0.14%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest bidder |
| Sl No | Description | Qty | Unit | Sreekumar C K L2 | M KAJHA HUSSAIN L1 | GOPALAN.M L3 |
|---|---|---|---|---|---|---|
| 1.00CADA | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 202 | sqm | 6.4 ₹1,292.8 | 6.38 ₹1,288.76 Lowest | 6.39 ₹1,290.78 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 3.69 | cum | 522 ₹1,923.57 | 521.18 ₹1,920.55 Lowest | 521.93 ₹1,923.31 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 27.97 | cum | 177 ₹4,950.34 Lowest | 177.25 ₹4,957.33 | 177.51 ₹4,964.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 32.78 | cum | 5,465 ₹1,79,159.1 | 5,457.83 ₹1,78,924.04 Lowest | 5,465.76 ₹1,79,184.01 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 436.74 | sqm | 266 ₹1,16,171.78 | 265.68 ₹1,16,032.02 Lowest | 266.06 ₹1,16,197.98 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 44.44 | cum | 5,904 ₹2,62,373.76 | 5,895.57 ₹2,61,999.13 Lowest | 5,904.14 ₹2,62,379.98 |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.71 | cum | 1,182 ₹3,209.13 | 1,180.53 ₹3,205.14 Lowest | 1,182.24 ₹3,209.78 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.01 | cum | 6,363 ₹31,897.72 | 6,354.35 ₹31,854.36 Lowest | 6,363.58 ₹31,900.63 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 90.62 | kilogram | 77 ₹6,977.59 Lowest | 77.35 ₹7,009.3 | 77.46 ₹7,019.27 |
Tender Value
₹10.1 L
EMD Value
₹25,208
Closing Date
23 Aug 2025, 4:00 pmClosed
Assistant Executive Engineer
O/O The Assistant Executive Engineer, Irrigation Sub Division, Nemmara
The work is for the renovation and modernisation works to the field bothie starting from sluice no.1 of Vithanassery branch canal of RBMC.
2025_Irrig_786665_1
IRR/PI/TR/3143/2025_5_1_1/1 NMA
Open Tender
Civil Works - Canal
Item Rate
300 days
Nemmara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹25,208
Yes
18 Oct 2025
14 Aug 2025
26 Aug 2025
14 Aug 2025
23 Aug 2025
14 Aug 2025
14 Aug 2025 - 19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .