| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.9 Laccepted-finance | ₹8.9 L | accepted-finance |
Tender Value
₹1.8 Cr
EMD Value
₹2.7 L
Closing Date
17 Feb 2026, 10:30 pmClosed
Karnataka Power Transmission Corporation Limited
N Roopa Jain
Providing 70 Nos of Security Personals required to various Stations & Offices coming under the jurisdictions of Transmission(Operations) Zone, KPTCL, Mysuru
KPTCL/2025-26/SE2336
KPTCL/2025-26/SE2336
Open
Two Tender Document System(Two Cover)
KPTCL CEE Transmission Zone Office Mysuru
₹4,470
₹2.7 L
17 Feb 2026
19 Jan 2026
19 Feb 2026
4 Feb 2026
3 Feb 2026
Details of Security Guards to be provided
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards required without arms Remarks Additional Security services spare No's
1 220kV Kadakola R/s III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required & Also requested for on additional hand for night hours due to large area of patrolling Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 2
2 220kV Kushalnagar R/s III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required. Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 1
3 Thamadahalli 220kV R/s Hunsur III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work
4 220kV KIADB Adakanahalli R/s I 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 1
5 220kV Hootagally R/s I 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work
6 220kV Vajamangala R/s III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 1
7 Kalamandira 66kV GIS I 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 70
8 Hootagally division I 2 0 1 3 --- 1 spare for Hootagalli TL&SS Division In Hootagalli Div, there 02 mens are working in two batchs 14:00hrs to 22:00hrs & 22:00hrs to 07:00am .Each person should work for 26days with 4 weekly off. Hence total working days by 2mens is 52 days with 08days weekly off. The 08 days of weekly off will be carried out by spare person. Balance working days is 18days. In TLM S/d Mysuru, 02 mens are working in two batchs 14:00hrs to 22:00hrs & 22:00hrs to 07:00am .Each person should work for 26days with 4 weekly off. Hence total working days by 2mens is 52 days with 08days weekly off. The weekly off of 08days will be carried by the spare person provided to Hootagalli Division, and remaining 10days to be worked along night shift security guards in balance with security persons provided for Hootagalli Divsion & TLM S/d Mysuru. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 1
9 TLM S/d Shivaji road, Mysuru I 2 0 2 ---
10 RT Division Mandya II 2 0 1 3 Existing 02nos of security guards are working in alternate days without availing any weekly off, Hence 01 no of additional security guard is required at RT Div Mandya In RT Div, Mandya, there 02 mens are working in two batchs 14:00hrs to 22:00hrs & 22:00hrs to 07:00am .Each person should work for 26days with 4 weekly off. Hence total working days by 2mens is 52 days with 08days weekly off. The 08 days of weekly off will be carried out by spare person. Balance working days is 18days to be worked with night shift security guards for balancing the working days. 1
11 220kV Tubinakere R/s III 3 0 1 4 The 220kV R/s yards are vast in area and existing 03nos of security guards are working in 3shifts without any weekly off. Hence 03nos of additional security guards are required for 03nos of 220kV R/s Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. 1
12 220kV Huygonahally R/s III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also.
13 220kV Nagamangala R/s III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. 1
14 220kV Hebbani R/s III 3 0 1 4 Required 01 no of additional security guard Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also.
15 220kV Chamarjanagar R/s II 3 0 1 4 Since the 220kV R/s have vast yard area and it is very much essential to provide additional 01 no of security personnel along with the existing 03nos of security personnel in each 220kV R/s and hence requested to provide 4No's of security personnels for each 220kV Receiving stations totalling to 12No's of Security personnels for 3No's of 220kV Receiving stations coming under Chamarajanagara operations division. Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. 1
16 220kV Madhuvanhalli R/s III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. TRUE 56+13
17 220kV Begur R/s III 3 0 1 4 Additional One Spare person for Weekly off, 3men in 3 shifts 26+26+26 working days, with (04 x3 )=12 days of weekly off to be carried by the additional spare hand and remaining 14 days to be worked with night shift security guard. Weekly off includes one day CL also. 1
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards Remarks
18 Zonal office, Mysuru I 2 0 1 2 1 spare for Zonal & Main gate. In main gate section, there are Three Shifts, each person should work for 26 days & 4 days of weekly off, total working day by 3men is 78 days. Remain weekly off by 3men is 12 days, which has to worked by one spare person. One spare person should work for 12 days of weekly off & remaining 14 working days to be worked as a substitue for 08 days of weekly off with security mens of Zonal Office. And remaining 07 days to be clubbed with night shift seucrity mens who are on duty. Weekly off includes one day CL also. No additional claims for Leave with wages i.es 1 day leave for every 20days of work 1
19 Main Gate of Prasarna Bhavana building I 3 0 4
Sl no Zone Present working guards without arms Additional no of guards without arms Total no of guards
1 Zone-I 18 5 23
2 Zone-II 5 2 7
3 Zone-III 30 10 40
4 Total 53 17 70
Sl no Name of the station No of Guards with arms No of Guards without arms Additional no of guards without arms Total no of guards required without arms Remarks
1 220kV Kadakola R/s 0 3 2 5 As the requipement yard is vast in 220kV Station, during night shid minimum 2 No's of Security guards required.
2 220kV Kushalnagar R/s 0 3 1 4 As the equipment yard is vast in 220kV Station.
3 220kV Vajamangala R/s 0 3 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No's of Security gaurds required.
4 220kV Hootagally R/s 0 3 2 5 Existing 3 security guard's working for three shift for giving them weekly off additional 2 No's of Security gaurds required for Thammadahally and 220 kv hootagally
5 220kV KIADB Adakanahalli R/s 0 3 2 5 As the equipment yard is vast in 220kV Station, during night shift minimum 2 No's of Security gaurds required.
6 Hootagally division 0 2 0 2 -
7 Kalamandira 66kV GIS 0 3 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No's of Security gaurds required for Thammadahally and 220 kv hootagally.
8 TLM S/d Shivaji road 0 2 0 2 -
9 Thamadahalli 220kV R/s Hunsur 0 3 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No's of Security gaurds required for Thammadahally and 220 kv hootagally.
Total 0 25 10 35
Sl no Name of the station No of Guards with arms No of Guards without arms Additional no of guards without arms Total no of guards Remarks
1 RT Division Mandya 0 2 0 2
Sl no Name of the station No of Guards with arms No of Guards without arms Additional no of guards without arms Total no of guards Remarks
1 220kV Tubinakere R/s 0 3 0 3
2 220kV Huygonahally R/s 0 3 0 3
3 220kV Hebbani R/s 0 3 0 3
4 220kV Nagamangala R/s 0 3 0 3
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards required without arms Remarks Additional Security services spare
1 220kV Kadakola R/s III 3 0 1 5 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required & Also requested for on additional hand for night hours due to large area of patrolling 2 Spares are required Existing 3 mens in 3 shifts with total 3mens of 75 working days. 15 days of weekly off 3 mens will be carries by 1 spare & remaining 10 working days are left over 1 additional spare for night shift patrolling. 2
2 220kV Kushalnagar R/s III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required. 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
3 220kV KIADB Adakanahalli R/s III 3 0 1 4
4 220kV Hootagally R/s I 3 0 1 4 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
5 220kV Vajamangala R/s I 3 0 1 4
6 Hootagally division I 2 0 0 2 --- 1 spare for Hootagalli & TLM Mysore Division. In Hootagalli Division, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Also for In TLM, Mysuru Division, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Hence total working days by 1 spare person is 10days+10days=20 days Carry over of 05 days to be worked by Spare person will be covered up in Sl no.1(RT Mandya) 1
7 TLM S/d Shivaji road I 2 0 0 2 ---
8 Kalamandira 66kV GIS I 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required. 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
9 Thamadahalli 220kV R/s Hunsur III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No's of Security gaurds required for Thammadahally and 220 kv hootagally.
Total 25 0 7 33
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards Remarks
1 RT Division Mandya II 2 0 1 3 Existing 02nos of security guards are working in alternate days without availing any weekly off, Hence 01 no of additional security guard is required at RT Div Mandya Also for In RT Division, Mandya, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Hence total working days by 1 spare person is 5days +5days=10days. 05days(carry over from Hootagalli Div) will be managed. Carry over of 05 days to be worked by another Spare person NIL
2 220kV Tubinakere R/s III 3 0 1 4 The 220kV R/s yards are vast in area and existing 03nos of security guards are working in 3shifts without any weekly off. Hence 03nos of additional security guards are required for 03nos of 220kV R/s 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
3 220kV Huygonahally R/s III 3 0 1 4
4 220kV Nagamangala R/s III 3 0 1 4 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
5 220kV Hebbani R/s III 3 0 1 4 Required 01 no of additional security guard
6 220kV Chamarjanagar R/s II 3 0 1 4 Since the 220kV R/s have vast yard area and it is very much essential to provide additional 01 no of security personnel along with the existing 03nos of security personnel in each 220kV R/s and hence requested to provide 4No's of security personnels for each 220kV Receiving stations totalling to 12No's of Security personnels for 3No's of 220kV Receiving stations coming under Chamarajanagara operations division. 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
7 220kV Madhuvanhalli R/s III 3 0 1 4
8 220kV Begur R/s III 3 0 1 4 1 spare for 220kV Begur R/s. 3mens working in 75 working days. With weekly off 15 days for 3mens. Hence 1 spare hand will carry the work of 15days with additional 10 days taken from (05 days from Sl.6 &7 ie's from 220kV Ch.Nagara R/s & Madhuvanahalli R/s). Remaining 05 days to be worked by the spare hand for total to be 25 days. The carry over of 05 days from Sl no.4 & 5 of Nagamangala R/s & Hebbani R/s to be executed by 1 spare hand. 1
II By taking 1no,. Of additional spare hand, the carry over of 05 working days from 1)Kushalnagara R/s & Vajamangala R/s-- 05days 2)Hootagalli R/s & Adakanahally R/s--- 05days 3)Kalamandira Stn & Hunsur Stn-- 05days 4)Tubinkere R/s & Huygonahalli R/s--- 05 days 5)RT Mandya -- 05 days will be carried by 1 spare person. Total working days will be 25 days. 1
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards Remarks
1 Zonal office, Mysuru I 2 0 0 2 1 spare for Zonal & Main gate. In main gate section, Three Shifts, each person should work for 25 days & 5 days weekly off, total working day by 3men is 75 days. Remain weekly off by 3men is 15 days, which has to worked by one spare person. Also for Zonal Office section Two shifts with 2 persons. Each person should work for 25days & 5 days weekly off. Hence total weekly off by 2men is 10days, the work of weekly off has to be carried by spare person. Hence total working days by 1 spare person is 15days+10days=25 days 1
2 Main Gate of Prasarna Bhavana building I 3 0 0 3
Sl no Zone Present working guards without arms Additional no of guards without arms Total no of guards
1 Zone-I 18 4 22
2 Zone-II 5 2 7
3 Zone-III 30 6 36
4 Total 53 12 65
Security Guards 2025
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards required without arms Remarks Additional Security services spare No's
1 220kV Kadakola R/s III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required & Also requested for on additional hand for night hours due to large area of patrolling 2 Spares are required Existing 3 mens in 3 shifts with total 3mens of 75 working days. 15 days of weekly off 3 mens will be carries by 1 spare & remaining 10 working days are left over 1 additional spare for night shift patrolling. 2
2 220kV Kushalnagar R/s III 3 0 1 4 Existing 3 security guard's working for three shift for giving them weekly off additional 1 No of Security gaurds required. 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
3 Thamadahalli 220kV R/s Hunsur III 3 0 1 4
4 220kV KIADB Adakanahalli R/s I 3 0 1 4 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
5 220kV Hootagally R/s I 3 0 1 4
6 220kV Vajamangala R/s III 3 0 1 4 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
7 Kalamandira 66kV GIS I 3 0 1 4
8 Hootagally division I 2 0 0 2 --- 1 spare for Hootagalli & TLM Mysore Division. In Hootagalli Division, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Also for In TLM, Mysuru Division, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Hence total working days by 1 spare person is 10days+10days=20 days Carry over of 05 days to be worked by Spare person will be covered up in Sl no.1(RT Mandya) 1
9 TLM S/d Shivaji road, Mysuru I 2 0 0 2 ---
Total 25 0 7 32
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards Remarks
1 RT Division Mandya II 2 0 1 3 Existing 02nos of security guards are working in alternate days without availing any weekly off, Hence 01 no of additional security guard is required at RT Div Mandya Also for In RT Division, Mandya, Two Shifts are there 14:00 to 22:00hrs & 22:00hrs to 7am. Each person should work for 25 days & 5 days weekly off, total working day by 2men is 50 days. Remain weekly off by 2men is 10 days, which has to worked by one spare person. Hence total working days by 1 spare person is 5days +5days=10days. 05days(carry over from Hootagalli Div) will be managed. Carry over of 05 days to be worked by another Spare person NIL
2 220kV Tubinakere R/s III 3 0 1 4 The 220kV R/s yards are vast in area and existing 03nos of security guards are working in 3shifts without any weekly off. Hence 03nos of additional security guards are required for 03nos of 220kV R/s 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
3 220kV Huygonahally R/s III 3 0 1 4
4 220kV Nagamangala R/s III 3 0 1 4 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
5 220kV Hebbani R/s III 3 0 1 4 Required 01 no of additional security guard
6 220kV Chamarjanagar R/s II 3 0 1 4 Since the 220kV R/s have vast yard area and it is very much essential to provide additional 01 no of security personnel along with the existing 03nos of security personnel in each 220kV R/s and hence requested to provide 4No's of security personnels for each 220kV Receiving stations totalling to 12No's of Security personnels for 3No's of 220kV Receiving stations coming under Chamarajanagara operations division. 1 spare hand for two no's of 220kV Stations. Three shifts each 220kV Station. Hence each men should work for 25 days. Hence 3mens should work for 75 days with 05 days of weekly off for each men. Hence total weekly off for each 220kV Station is 15 days. For 2nd 220kV Station, 3men is working for 75 days with weekly off for 3mens is 15 days. By taking 1 spare person, total working days is 25 days, with carry over of 5days to be worked by another spare person. 1
7 220kV Madhuvanhalli R/s III 3 0 1 4
8 220kV Begur R/s III 3 0 1 4 1 spare for 220kV Begur R/s. 3mens working in 75 working days. With weekly off 15 days for 3mens. Hence 1 spare hand will carry the work of 15days with additional 10 days taken from (05 days from Sl.6 &7 ie's from 220kV Ch.Nagara R/s & Madhuvanahalli R/s). Remaining 05 days to be worked by the spare hand for total to be 25 days. The carry over of 05 days from Sl no.4 & 5 of Nagamangala R/s & Hebbani R/s to be executed by 1 spare hand. 1
II By taking 1no,. Of additional spare hand, the carry over of 05 working days from 1)Kushalnagara R/s & Vajamangala R/s-- 05days 2)Hootagalli R/s & Adakanahally R/s--- 05days 3)Kalamandira Stn & Hunsur Stn-- 05days 4)Tubinkere R/s & Huygonahalli R/s--- 05 days 5)RT Mandya -- 05 days will be carried by 1 spare person. Total working days will be 25 days. 1
Sl no Name of the station Zone Present working guards without arms No of Guards with arms Additional no of guards without arms Total no of guards Remarks
1 Zonal office, Mysuru I 2 0 0 2 1 spare for Zonal & Main gate. In main gate section, Three Shifts, each person should work for 25 days & 5 days weekly off, total working day by 3men is 75 days. Remain weekly off by 3men is 15 days, which has to worked by one spare person. Also for Zonal Office section Two shifts with 2 persons. Each person should work for 25days & 5 days weekly off. Hence total weekly off by 2men is 10days, the work of weekly off has to be carried by spare person. Hence total working days by 1 spare person is 15days+10days=25 days 1
2 Main Gate of Prasarna Bhavana building I 3 0 0 3
Sl no Zone Present working guards without arms Additional no of guards without arms Total no of guards
1 Zone-I 18 4 22
2 Zone-II 5 2 7
3 Zone-III 30 6 36
4 Total 53 12 65
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Providing Security 23 no's of Security Personals to the various stations & Offices coming under jurisdiction of Hootagalli Operations, Mysuru Zone.
Break Up Calculations to make payment for Service providers per month per Guard as per Corporate Office Circular vide KPTCL/B-14/526/2019-20 Dated 09.07.2025
Sl. No Description Percentage Security Guards Zone 1
1 Basic Wages (BW) Plus(+) Variable Dearness Allowance (VDA) 18561.00
2 Employess State Insurance (ESI) 3.25% of Basic plus VDA 603.23
3 Employess Provident Fund (EPF) 13.00% of Basic plus VDA(Employer's Contribution) subjected to minimum basic plus VDA of Rs 15000/- 1950.00
4 Wages for National/Festival Holidays(10 days) per day wages =(Basic/26 working daysx10)/12 For Govt Holidays 26th January, 15th August, 2nd October & other holidays shall be seven including 1st May & 1st day of Novemeber total of 10days in a year as per Karnataka Industrial Establishments National & Festival Holidays rules, 1964 594.90
5 Uniform Oufit Allowance As per KMWA-2022 Page No. 208 Note 208.33
6 Uniform Washing Allowance As per KMWA-2022 Page No. 208 Note 300.00
A Total Sum of (1) to (06) 22,217.47
7 Total Cost Per Head 22217.47 24509.6
B Sum Total 22217.47 24509.6
service charge between 5 % to 10%, if not bid will be rejected
8 Total wages per guard/Month 22217.47
9 Total Wages for 23 guards/Month 511001.80 7597574.8
10 Total Wages for one year without GST 6,132,021.63
11 For Quoting Purpose 6,132,021.63
Sl. No. Zone-I Wages per month #REF!
1 220 KV R/s Hootagalli R/s 22,217.47
2 220 KV R/s Adakanahally R/s
3 TL&SS Hootagalli Division Office #REF!
4 66/11kV Kalamandir S/s
5 TLM Sub-Division Office, Mysuru 17,848,037.31
6 Zonal Office, Mysuru
7 Main Gate or Prasarana Bhavana Building 17,848,037.31 17848037.3076923 254971.961538462
Superintending Engineer (Elecl), Controller of Accounts
Tr.Zone, Operations Mysuru Tr.Zone, Operations Mysuru 3212646.71538461
Tr.Zone, Operations Mysuru
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Providing 07 no's of Security Personals to the various Stations and Offices coming under the jurisdiction of Operations, Transmission Zone, KPTCL Mysuru
Break Up Calculations to make payment for Service providers per month per Guard as per Corporate Office Circular vide KPTCL/B-14/526/2019-20 Dated 09.07.2025
Sl. No Description Percentage Security Guards Zone II
1 Basic Wages (BW) Plus(+) Variable Dearness Allowance (VDA) 17811.00
2 Employess State Insurance (ESI) 3.25% of Basic plus VDA 578.86
3 Employess Provident Fund (EPF) 13.00% of Basic plus VDA(Employer's Contribution) subjected to minimum basic plus VDA of Rs 15000/- 1950.00
4 Uniform Oufit Allowance As per KMWA-2022 Page No. 208 Note 208.33
5 Uniform Washing Allowance As per KMWA-2022 Page No. 208 Note 300.00
6 Wages for National/Festival Holidays(10 days) per day wages =(Basic/26 working daysx10)/12 For Govt Holidays 26th January, 15th August, 2nd October & other holidays shall be seven including 1st May & 1st day of Novemeber total of 10days in a year as per Karnataka Industrial Establishments National & Festival Holidays rules, 1964 570.87
A Total Sum of (1) to (06) 21,419.06
7 Total Cost Per Head 21419.06
B Sum Total 21419.06
service charge between 5 % to 10%, if not bid will be rejected 0.00
8 Total wages per guard/Month 21419.06
9 Total Wages for 07 guards/Month 149933.39
10 Total Wages for one year without GST 1,799,200.72
11 For Quoting Purpose 1,799,200.72
Sl. No. Zone-II Wages
1 220kV R/s Chamarajanagara 21,419.06
2 RT Division Mandya
Superintending Engineer (Elecl), Controller of Accounts
Tr.Zone, Operations Mysuru Tr.Zone, Operations Mysuru
Tr.Zone, Operations Mysuru
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Providing 40no's of Security Personals to the various Stations and Offices coming under the jurisdiction of Operations, Transmission Zone, KPTCL Mysuru
Break Up Calculations to make payment for Service providers per month per Guard as per Corporate Office Circular vide KPTCL/B-14/526/2019-20 Dated 09.07.2025
Sl. No Description Percentage Security Guards Zone III
1 Basic Wages (BW) Plus(+) Variable Dearness Allowance (VDA) 17098.00
2 Employess State Insurance (ESI) 3.25% of Basic plus VDA 555.68
3 Employess Provident Fund (EPF) 13.00% of Basic plus VDA(Employer's Contribution) subjected to minimum basic plus VDA of Rs 15000/- 1950.00
4 Uniform Oufit Allowance As per KMWA-2022 Page No. 208 Note 208.33
5 Uniform Washing Allowance As per KMWA-2022 Page No. 208 Note 300.00
6 Wages for National/Festival Holidays(10 days) per day wages =(Basic/26 working daysx10)/12 For Govt Holidays 26th January, 15th August, 2nd October & other holidays shall be seven including 1st May & 1st day of Novemeber total of 10days in a year as per Karnataka Industrial Establishments National & Festival Holidays rules, 1964 548.01
A Total Sum of (1) to (06) 20,660.03
service charge between 5 % to 10%, if not bid will be rejected
7 Total Cost Per Head 20660.03
B Sum Total 20660.03
8 Total wages per guard/Month 20660.03
9 Total Wages for 40 guards/Month 826401.25
10 Total Wages for one year without GST 9,916,814.95 10145665.86
11 For Quoting Purpose 9,916,814.95
Sl. No. Zone-III Wages
1 220kV R/s Kadakola 20,660.03
2 220kV Kushal Nagara
3 220kV Vajamangala
4 220kV Hunsur R/s
5 220kV Tubinkere R/s
6 220kV Huygonahalli R/s
7 220kV Hebbani R/s
8 220kV Nagamangala R/s
9 220kV Madhuvinahalli R/s
10 220kV Begur R/s
Superintending Engineer (Elecl), Controller of Accounts
Tr.Zone, Operations Mysuru Tr.Zone, Operations Mysuru
Tr.Zone, Operations Mysuru
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Security details total-2025.xlsx
Others - Details for providing Security services • 0.04 MB
Credit facility.doc
Others - Credit facility format • 0.06 MB
To upload for quoting purpose.xlsx
Others - APT • 0.02 MB
NIT 2025.docx
Others - NIT Document • 0.10 MB
Insurance Surety Bond Formats.docx
Others - Insurance Bonds format • 0.03 MB
bid document zonal.docx
Others - Tender document • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .