Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹1.8 Cr+₹12.4 L (7.49%)Rejected-AOC | ₹1.8 Cr+₹12.4 L (7.49%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | the saharan majra co.op l c society ltd L1 | MANGAT CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Filling of boulder stone into wire crates hand packed including Rehandling of boulder stone from stackyard to site of work lead 0.5 km-1km including loading and unloading as per specifications and instruction of Engineer in Charge | 5,837 | cum | 449 ₹26,20,813 Lowest | 490 ₹28,60,130 |
| 2.00 | Tipping wire crates including equipment | 4,783 | cum | 138 ₹6,60,054 Lowest | 160 ₹7,65,280 |
| 3.00 | Weaving wire netting for wire crates including supply of M.S. Annealed wire 4mm dia confirming to I.S. specification with latest amendment if any binding sides and partitions to make crates of 15cmx15cm mesh size complete in all respect. | 25,997 | sqm | 205 ₹53,29,385 Lowest | 230 ₹59,79,310 |
| 4.00 | Stone pitching 1.0' thick on slopes of guide banks and protection works | 40 | cum | 825 ₹33,000 Lowest | 900 ₹36,000 |
| 5.00 | Filling 0.50' thick spall beneath stone pitching on side slopes behind pitching i/c supply of spall (22.4-53mm) from cheapest quarry to site of work complete in all respect as per PWD specifications and Engineer-incharge. | 20 | cum | 1,415 ₹28,300 Lowest | 1,500 ₹30,000 |
| 6.00 | Grouting stone pitching with bajri or shingle i/c supply of spall/bajri (22.4-53 mm) from cheapest quarry to site of work complete in all respect as per PWD specifications and Engineer-in-charge. | 130 | sqm | 120 ₹15,600 Lowest | 160 ₹20,800 |
| 7.00 | Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge. | 5,837 | cum | 1,730 ₹1,00,98,010 Lowest | 1,800 ₹1,05,06,600 |
| 8.00 | Any Other Item | 1 | CSR + SP | 7 ₹7 Lowest | 11 ₹11 |
Tender Value
₹2 Cr
EMD Value
₹4 L
Closing Date
5 Jan 2026, 10:00 amClosed
XEN LUDHIANA DRAINAGE CUM MINING DIVISION
XEN LUDHIANA DRAINAGE CUM MINING DIVISION
Estimate To protect Dhussi Bandh by construction of wire crates Gabion 4 no Studs and Repair of A spurs at RD 204500, 205700 of 3L bandh along River Sutlej ( Jamalpur Laily Complex)
2025_WR_155458_1
10333/6A TENDER
Open Tender
Civil Works
Item Rate
60 days
LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4 L
Yes
XEN LUDHIANA DRAINAGE CUM MINING DIVISION
13 Mar 2026
12 Dec 2025
5 Jan 2026
12 Dec 2025
5 Jan 2026
12 Dec 2025
24 Dec 2025
Filling of boulder stone into wire crates hand packed including Rehandling of boulder stone from stackyard to site of work lead 0.5 km-1km including loading and unloading as per specifications and instruction of Engineer in Charge
Tipping wire crates including equipment
Weaving wire netting for wire crates including supply of M.S. Annealed wire 4mm dia confirming to I.S. specification with latest amendment if any binding sides and partitions to make crates of 15cmx15cm mesh size complete in all respect.
Stone pitching 1.0' thick on slopes of guide banks and protection works
Filling 0.50' thick spall beneath stone pitching on side slopes behind pitching i/c supply of spall (22.4-53mm) from cheapest quarry to site of work complete in all respect as per PWD specifications and Engineer-incharge.
Grouting stone pitching with bajri or shingle i/c supply of spall/bajri (22.4-53 mm) from cheapest quarry to site of work complete in all respect as per PWD specifications and Engineer-in-charge.
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder stone 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading and stacking complete in all respect as per PWD specifications and Engineer-incharge.
Any Other Item
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_315576.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .