Tender Value
₹79.9 L
EMD Value
₹1.6 L
Closing Date
18 Aug 2026, 3:00 pm
Provision for track machine siding at Mannanur for a length of 130 Tmtr.
PGT-Works-2026-N16-11
PGT-Works-2026-N16-11
Open
Works - General
10 Months
Palakkad, Kerala
₹0
₹1.6 L
24 Jul 2026
24 Jul 2026
4 Aug 2026
Vol-I & Vol- II ) except reinforcement steel
Item- 1 Pro Rail level PF at MNUR
S No. Item No Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Mechanical Transport including
loading, unloading and stacking
1 Beyond 5 km upto 10 km per km
2 Beyond 10 km upto 20 km per km
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical
means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 sqm
on plan) including getting out and
disposal of excavated earth lead upto 50
m and for all lift, as directed by Engineer-
2.25A Excavating, supplying and filling of local cum 182 700.5 127491
earth (including royalty) by mechanical
transport upto a lead of 5km also
5 including ramming and watering of the
earth in layers not exceeding 20 cm in
trenches, plinth, sides of foundation etc.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work
up to plinth level :
derived from natural sources : 6 graded
stone aggregate 40 mm nominal size
derived from natural sources)
11.0 FLOORING
11.16S TILE FLOORING
Chequered precast cement concrete tiles
22 mm thick in footpath & courtyard,
jointed with neat cement slurry mixed
11.20 with pigment to match the shade of tiles,
including rubbing and cleaning etc.
complete, on 20 mm thick bed of cement
mortar 1:4 (1 cement: 4 coarse sand).
11.20.3 Dark shade pigment using ordinary Sqm 480 1119.5 537360
13.0 FINISHING
13.44S EXTERIOR FINISHING
Finishing walls with Premium Acrylic
13.47 Smooth exterior paint with Silicone
additives of required shade:
13.47.1 New work (Two or more coats applied @ Sqm 752 171.1 128667.2
1.43 ltr/10 sqm over and including
priming coat of exterior primer applied @
0.90 litre/10 sqm)
16.0 ROAD WORK
16.42S CONCRETE PAVEMENTS
16.45 Providing and fixing pre-moulded joint per cm 4000 5.3 21200
filler in expansion joints of RCC roads / CC depth
pavements after making the joints dust per cm
free with high pressure air jet cleaners, all width
complete as per direction of the Engineer- per
in-Charge. (Pre-moulded joint fillers shall metre
be made of bitumen hot sealing length
compound impregnated fibre board
having impregnation more than 35%,
conforming to IS:1838 for fibre board and
IS: 1834 for hot sealing bitumen
compound grade A.)
16.49S MISCELLANEOUS
16.62 Providing and applying 2.5 mm thick road Sqm 80 747.8 59824
marking strips (retro- reflective) of
specified shade/ colour using hot
thermoplastic material by fully/ semi
automatic thermoplastic paint applicator
machine fitted with profile shoe, glass
beads dispenser, propane tank heater and
profile shoe heater, driven by experienced
operator on road surface including cost of
material, labour, T&P, cleaning the road
surface of all dirt, seals, oil, grease and
foreign material etc. complete as per
direction of Engineer-in-charge and
accordance with applicable specifications.
16.75 Providing and laying C.C. pavement of mix cum 120 9823.8 1178856
M-25 with ready mixed concrete from
batching plant. The ready mixed concrete
shall be laid and finished with screed
board vibrator , vacuum dewatering
process and finally finished by floating,
brooming with wire brush etc. complete
as per specifications and directions of
Engineer-in-charge. (The panel shuttering
work shall be paid for separately).
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
16.76 Deduct for using of M-20 grade concrete cum 120 -203.8 -24456
12 instead of M-25 grade concrete in C.C.
Item- 2 Pro High level PF at MNUR
S No. Item No Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Mechanical Transport including
loading, unloading and stacking
1 Beyond 5 km upto 10 km per km
2 Beyond 10 km upto 20 km per km
3 Beyond 20 km per addl. km
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical
means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 sqm
on plan) including getting out and
disposal of excavated earth lead upto 50
m and for all lift, as directed by Engineer-
2.25A Excavating, supplying and filling of local cum 650 700.5 455325
earth (including royalty) by mechanical
transport upto a lead of 5km also
5 including ramming and watering of the
earth in layers not exceeding 20 cm in
trenches, plinth, sides of foundation etc.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work
up to plinth level :
derived from natural sources : 6 graded
stone aggregate 40 mm nominal size
derived from natural sources)
6.0 MASONRY WORK
6.1S General
Brick work with common burnt clay
6.2 modular bricks of class designation 7.5 in
foundation and plinth in:
7.0 STONE WORK
7.1S RANDOM RUBBLE MASONRY
Random rubble masonry with hard stone
in foundation and plinth including levelling
up with cement concrete 1:6:12 (1
cement : 6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) upto
plinth level with :
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Random rubble masonry with hard stone
in superstructure above plinth level and
upto floor five level, including levelling up
7.2 with cement concrete 1:6:12 (1 cement :
6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) at
window sills, ceiling level and the like.
10.0 STEEL WORK
10.1S General
10.1 Structural steel work in single section, Kg 150 117.35 17602.5
fixed with or without connecting plate,
10 including cutting, hoisting, fixing in
position and applying a priming coat of
approved steel primer all complete.
11.0 FLOORING
11.16S TILE FLOORING
Chequered precast cement concrete tiles
22 mm thick in footpath & courtyard,
jointed with neat cement slurry mixed
11.20 with pigment to match the shade of tiles,
including rubbing and cleaning etc.
complete, on 20 mm thick bed of cement
mortar 1:4 (1 cement: 4 coarse sand).
11.20.3 Dark shade pigment using ordinary Sqm 30 1119.5 33585
13.0 FINISHING
13.1S CEMENT PLASTER (IN FINE SAND)
13.1 12 mm cement plaster of mix :
13.33S POINTING ON STONE WORK
Pointing on stone work with cement
mortar 1:3 (1 cement : 3 fine sand) :
13.44S EXTERIOR FINISHING
Finishing walls with Premium Acrylic
13.47 Smooth exterior paint with Silicone
additives of required shade:
13.47.1 New work (Two or more coats applied @ Sqm 47 171.1 8041.7
1.43 ltr/10 sqm over and including
priming coat of exterior primer applied @
0.90 litre/10 sqm)
Painting with synthetic enamel paint of
13.61 approved brand and manufacture to give
an even shade :
16.0 ROAD WORK
16.42S CONCRETE PAVEMENTS
16.45 Providing and fixing pre-moulded joint per cm 500 5.3 2650
filler in expansion joints of RCC roads / CC depth
pavements after making the joints dust per cm
free with high pressure air jet cleaners, all width
complete as per direction of the Engineer- per
in-Charge. (Pre-moulded joint fillers shall metre
be made of bitumen hot sealing length
compound impregnated fibre board
having impregnation more than 35%,
conforming to IS:1838 for fibre board and
IS: 1834 for hot sealing bitumen
compound grade A.)
16.49S MISCELLANEOUS
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
16.62 Providing and applying 2.5 mm thick road Sqm 5 747.8 3739
marking strips (retro- reflective) of
specified shade/ colour using hot
thermoplastic material by fully/ semi
automatic thermoplastic paint applicator
machine fitted with profile shoe, glass
beads dispenser, propane tank heater and
profile shoe heater, driven by experienced
operator on road surface including cost of
material, labour, T&P, cleaning the road
surface of all dirt, seals, oil, grease and
foreign material etc. complete as per
direction of Engineer-in-charge and
accordance with applicable specifications.
16.75 Providing and laying C.C. pavement of mix cum 15 9823.8 147357
M-25 with ready mixed concrete from
batching plant. The ready mixed concrete
shall be laid and finished with screed
board vibrator , vacuum dewatering
process and finally finished by floating,
brooming with wire brush etc. complete
as per specifications and directions of
Engineer-in-charge. (The panel shuttering
work shall be paid for separately).
16.76 Deduct for using of M-20 grade concrete cum 15 -203.8 -3057
19 instead of M-25 grade concrete in C.C.
18.0 WATER SUPPLY
18.7S C.P.V.C. PIPES
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply, and
all CPVC plain & brass threaded fittings,
including fixing the pipe with clamps at
1.00 m spacing. This includes jointing of
pipes & fittings with one step CPVC
solvent cement and testing of joints
complete as per direction of Engineer in
Charge. ( Internal work - Exposed on wall )
Pro.extension of Br.no.733 Up ( Exg 1 x 2.74 m RCC slab ) as RCC Box at Km.572/200-300 ( Balance
S No. Item No Description of Item Unit Qty Rate Amount
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying cement concrete in
retaining walls, return walls, walls (any
thickness) including attached pilasters,
columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing
courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets,
sunken floor etc., up to floor five level,
excluding the cost of centering, shuttering
derived from natural sources : 4 graded
stone aggregate 20 mm nominal size
derived from natural sources)
Schedule C-List of Items of Works covered by the SRUSSOR - 2021 for TVC & PGT Division except
Schedule Cement & Reinforcement steel for which tenderer has to quote percentage rate over, below or at
par to the SRUSSOR 2021 rate.
Item- 1 Track works in relation to provision of siding.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
S No. Item No Description of Item Unit Qty Rate Amount
1 071030 Dismantling the existing BG Buffer-stop Set 1.00 6872.23 6872.23
laid with rails & wooden/ST sleepers
including leading the dismantled Buffer
stop materials to nominated places within
station yard limits and stacking as
material-wise and classification-wise duly
releasing all fittings carefully without
causing any damage with all contractor's
labour, tools, with all lead and lifts,
crossing of tracks if any, etc., complete as
directed by the Engineer-in-charge.
2 092030 25mm gap 'in-situ' welding during traffic Each 62.00 1997.27 123830.74
block using Railway's welding portion &
Welder and finishing of weld to meet the
prescribed tolerances and pass all
stipulated tests with all required labour,
materials, consumables, tools,
equipments etc. to complete the work in
all respect as per IR's "Manual for Fusion
Welding of Rails by Alumino - Thermic
Process" with latest correction slips,
including marking of welded joint,
painting weld collar with anticorrosive
paint, restoration of track near weld joint
to original position and fixing of joggled
fish plate at new weld, to be removed
after passing of weld in USFD test as
directed by Engineer in charge. Note: 1.
Only welding portion and related
accessories as per Annexure - I and
Welder shall be supplied by Railways. 2.
Hydraulic Weld trimmer shall be used for
chipping and profile Grinder for finishing.
3. Required nos. of Joggled fish plates
shall be supplied by Railway at nearest P.
Way Stores and the same shall be
returned at nearest P. Way Store or at
other location as per direction of
Engineer-in-Charge after release from
Linking of BG track (except at LC, Bridges
and SEJs) with any type of rail section and
sleeper of specified density, on ballast
bed spread and compacted with suitable
roller, over prepared formation including
leading free rails/welded panels available
along the alignment on to formation,
leading and spreading all fittings and
fastenings, spreading of sleepers at
specified spacing, squaring, placing of
rails over sleepers and fixing rails to
sleepers with all types of fittings and
fastenings to correct gauge & alignment,
lubrication of fittings and fastenings with
contractor's grease as per IRPWM
standards with contractors labour, tools,
consumables, with all lead, lifts etc.
complete and raising, levelling and initial
packing of track to make it fit for 30 kmph
and meet other prerequisites prescribed
in Indian Railway Track Machine Manual
for deployment of Tamping Machine.
Note: 1.Rail cutting and Hole drilling shall
be paid separately. 2.Spreading of ballast
and compaction shall be paid separately
under relevant item.
3 123042 For sleeper density of 1540 sleepers per TRM 200.00 368.43 73686.00
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Shifting / Slewing the existing or newly
assembled track of any rail section with
any type of sleepers and any density
under line block to correct locations &
alignment and attending to one round
kutcha packing to run safely at 20KMPH
speed with all contractors tools and
consumables complete and as directed by
Engineer in-charge.
4 123092 Maximum Shifting / Slewing for more than TRM 50.00 294.91 14745.50
1 metre & up to 2 metres
First or Second Through Packing of track
of all sleeper density including giving a
general lift, as desired to eliminate sag
after Deep Screening work, lifting of track,
lowering of track and major realignment
of curves and formation rehabilitation as
per procedure prescribed in latest edition
of IRPWM. Note: General lift is normally 25
mm and isolated lift may be up to 50 mm.
Density of 1540
Anti-corrosive painting of rail on running
track of any sleeper density on web, foot
etc. including liner contact area
(excluding bottom of foot) and fishing
plane as per requirement with two coats
o f thickness of 100 microns each by
bituminous black paint confirms to IS-
9862 of reputed make including painting
of liners, ERCs and including surface
preparation, as a complete job as per
procedure prescribed in latest edition of
IRPWM Note: 60% of payment shall be
made if painting on only gauge face side
Quick cutting with abrasive rail cutter of
all types of rail sections including wear
resistant, head hardened rails up to 110
UTS, with contractors tools & plants,
equipment, consumable with all lead & lift
etc. complete as directed by Engineer in-
charge. Abrasive Rail Cutter will be as per
RDSO Specification No. TM/SM/1 (Rev. 01
of 2012) with latest status of RDSO; Rail
Cutting Wheel Abrasive Disc will be as per
RDSO Specification No.TM/SM/2 (Rev. 01
Drilling holes of 16 mm to 32 mm dia.
with Rail Drilling machine including
chamfering with appropriate chamfering
tools in all types of rail section with
contractor's tools & plants, equipment,
consumable with all lead & lift etc.
complete, as directed by Engineer in-
charge. Rail Drilling Machine will be as per
RDSO Specification No. TM/SM/3, dated
9 161050 Drilling holes of specified size for bond Each 40.00 57.90 2316.00
holes with 7.2mm dia drill twist to correct
spacing and location on 60kg/52kg rails
on cess or under traffic block with
contractor's tools and plant, equipment,
consumable, labour etc complete as
directed by the Engineer in charge at site.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Loading of rails of any section and length
up to 13 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up
10 171014 I n Wagon where mechanical handling is MT 21.00 161.08 3382.68
possible a n d traffic block is not required
or in Truck/trailer.
Loading, leading and unloading of 52Kg /
60Kg rail up to 13 metre length by
Railway's Rail Dolly / Dip Lorry to the
nominated location under traffic with line
protection in case road carriage is not
possible with different lead with a lift up to
5 metre during block period.
1 Km for every subsequent Km or part
thereof and up to 10 Km
Unloading of rails of any section and
length up to 13 metre, in neat manner for
Railway usage from departmental
material train (DMT) or contractor's /
Railway's Truck/trailer including lead up to
50 metre, lift up to 5 metre and stacking
in prescribed manner.
14 171051 From wagons during period of traffic block MT 21.00 208.73 4383.33
where handling by mechanical means is
Loading of 52kg / 60kg PSC line and
special sleepers beyond 2.75 metre
length including existing fittings and
fastenings in Depot / Station / Mid-section
between stations in a neat manner to
departmental material train (DMT) or
contractor's / Railway's Truck/trailer with
crane or any other means including
crossing of one track with free lead up to
250 metre and lift up to 5 metre, if
required with contractor's labour, tools &
plants, machinery, consumables etc.
Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
15 172024 In Wagon/Truck / trailer where mechanical MT 88.00 157.58 13867.04
handling is possible and traffic block is not
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
1 Km for every subsequent Km or part
thereof and up to 10 Km
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Loading, leading and unloading of all
types of P.Way fittings and all other
miscellaneous m a t e r i a l except Rails,
sleepers, switches, crossings, SEJs and
Glued Joints by road vehicles for different
leads. Note: Lead shall be the shortest
motorable road length between the points
of loading and unloading.
Km over item no. 172047
Transportation of Rails, sleepers,
switches, crossings, SEJs and Glued Joints
by road vehicles for different leads. Note:
1 . Lead shall be the shortest motorable
road length between the points of loading
and unloading. 2. Loading and unloading
shall be paid extra under relevant items.
Unloading of 52kg / 60kg PSC line and
special sleepers up to 2.75 metre length
in Depot / Station / Mid-section between
stations in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/Trailer with
crane or any other means including
crossing of one track and lead up to 250
metre & lift up to 5 metre with
contractor's labour, tools & plants,
machinery, consumables etc. Note: In
case of any damage to sleeper during
loading, penalty @ 50% of the all inclusive
cost of sleeper shall be levied.
Spreading of New / SH , normal or wider
base PSC sleepers from stack along track
on either side for different leads with all
lifts by any means.
Hiring of machinery for minor
miscellaneous works for short duration
including operator/driver, fuel, lubricants
and consumable. The contractor shall
arrange all statutory permits as required
by rules and regulations prevailing in the
area of work. Payment shall be made for
actual working hours at site.
27 211201 JCB Backhoe Loaders 3DX Plus or similar Hour 400.00 975.39 390156.00
with minimum 1.10 cum bucket capacity
28 211250 Manufacturing and fixing buffer stop with Each 1.00 19006.47 19006.47
Railway supplied rails, cutting, including
bending of rails as per plan ,with all
contractor's labour, materials, tools,
plants etc. and all lead and lift including
crossing of track where necessary and as
directed by Engineer in charge at site.
Note: Excavation, fixing rails in cement
concrete, drilling of holes will be paid
Pro.extension of Br.no.733 Up ( Exg 1 x 2.74 m RCC slab ) as RCC Box at Km.572/200-300 ( Balance
S No. Item No Description of Item Unit Qty Rate Amount
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual
Means for foundations and floors of the
bridges, retaining walls etc. including
setting out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation of
the layers by ramming and watering etc.
including all lift, disposal of surplus soil up
to a lead of 300m, all types of shoring and
strutting with all labour and material
complete as per drawing and technical
specification as directed by Engineer in
charge. Note: This item will be used for
excavation work in connection with other
miscellaneous works also like side drains,
foundation for OHE masts and other
miscellaneous structures in connection
with Gauge Conversion, Doubling, New
Providing and laying in position Plain
cement concrete of specified Nominal Mix
f o r miscellaneous works like side drains,
foundation for OHE masts and other
miscellaneous structures excluding the
cost of Cement, centering and shuttering -
All work up to plinth level :
4 graded stone aggregate 20 mm nominal
3 024010 Providing and casting machine batched, cum 30.61 5494.49 168186.34
machine mixed and machine vibrated
Cement Concrete of specified grade as
per approved Design Mix, mixed in Mobile
Concrete Batching/Mixing Plant at site or
RMC from approved plants, (Cast in-
Situ/Pre-cast) in bottom/top slab, side
walls, toe wall and sumps haunch filling
head walls, thrust bed or any other
component using 20mm graded crushed
stone aggregate and coarse sand of
approved quality of RCC box of any size
including finishing, Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength
and durability, complete as per drawings
and technical specifications as directed by
Engineer in charge. Note: 1. Payment for
cement, reinforcement and shuttering
shall be made extra under relevant item.
2. Plasticiser shall invariably be used in
approved proportion to increase
workability with minimum possible
quantity of cement for all grade of Design
Mix Concrete unless it is specifically
approved citing reasons at the stage of
Mix Design and in that case deduction
shall be made as per relevant item.
Centering and shuttering including
strutting, propping etc. and removal of
4 025031 All types of bridge sub-structures, e.g. Sqm 116.62 853.04 99481.52
pier, abutment, wing wall, retaining wall,
RCC box type foundations, Abutment cap,
Pier Cap, Inspection Platform & Pedestal
over Pier cap, Fender wall, Diaphragm
wall etc. up to 5m above ground level
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
including consolidation with all labour,
lead, lift, tools, plants, crossing of tracks
as per drawing and technical specification
as directed by the Engineer in charge in
case loose slush is encountered at site of
foundation before casting the foundation
or laying the filtering media.
water from any location. Payment to be Hour
done for Horse power of pump multiplied
by pumping hours.
Earthwork in excavation by mechanical
means (Hydraulic Excavator)/Manual
Means for foundations and floors of the
bridges, retaining walls etc. including
setting out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation of
the layers by ramming and watering etc.
including all lift, disposal of surplus soil up
to a lead of 300m, all types of shoring and
strutting with all labour and material
complete as per drawing and technical
specification as directed by Engineer in
charge. Note: This item will be used for
excavation work in connection with other
miscellaneous works also like side drains,
foundation for OHE masts and other
miscellaneous structures in connection
with Gauge Conversion, Doubling, New
for executing the work under water and/or
liquid mud to compensate all additional
arrangements including pumping out
water as required. Note: The extra
percentage rate is applicable only for the
quantity of work executed under water.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
providentFundstt.pdf
ATTACHMENT
ACS1to11-GCC2022.pdf
ATTACHMENT
ANNEXUREVNEWasperACS4.pdf
ATTACHMENT
AnnexureVaaspercorrectionslip2GCC2022.pdf Annexure V a
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
AnnexureVI-B.pdf
ATTACHMENT
AnnexureB-1.pdf
ATTACHMENT
CheckListandNEFTform.pdf
ATTACHMENT
Guidelinesforprotectionofcables.pdf
ATTACHMENT
BG-Instructions.pdf
ATTACHMENT
eBGaccountno..pdf
ATTACHMENT
Notes-Sch.B.pdf
ATTACHMENT
Notes-SchAA1DSR23.pdf
ATTACHMENT
Notes-SchCC1C2.pdf
ATTACHMENT
RDSODirectivesonATWeld.pdf
ATTACHMENT
AnnexureVaaspercorrectionslip2GCC2022.pdf
ATTACHMENT
BGformatforPG.pdf
ATTACHMENT
AnnexureA-OT-16-11.pdf
ATTACHMENT
E-TenderNoticePGT-OT-16-2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].