Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.7 L+₹3.0 L (13.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹32.7 L+₹10.0 L (44.2%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | thomas scaria L3 | ANIL V VARGHESE L1 | VARGHESE MATHEW L2 |
|---|---|---|---|---|---|---|
| 1.00Improving irrigation facilities | ||||||
| 1.00 | OD50746/2025-2026:Removing water weeds such as hyacinth,grass etc by rooting out small trees and all other
debris using ambhiboius excavator where ever necessary including conveying the debris from
the site and disposing the same with contractors on risk of choice etc complete and disposing
the same suitably without causing any harm to the environment as per the direction of
deptl.officers at site. | 20,350 | sqm | 11 ₹2,23,850 | 7.81 ₹1,58,933.5 Lowest | 8 ₹1,62,800 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 11,375.7 | cum | 201 ₹22,86,515.7 | 139.27 ₹15,84,293.74 Lowest | 140 ₹15,92,598 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | 528 ₹2,640 | 364 ₹1,820 Lowest | 500 ₹2,500 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 295 ₹1,475 | 203 ₹1,015 Lowest | 300 ₹1,500 |
| 1.00 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 216 | metre | 112 ₹24,192 | 77.22 ₹16,679.52 Lowest | 143 ₹30,888 |
| 1.01 | OD52181/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all
hire charges and labour for fixing , staging platform and all other appliances necessary for pile
driving down after pointing the bottom end | 216 | metre | 1,011 ₹2,18,376 | 698 ₹1,50,768 Lowest | 850 ₹1,83,600 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 135.58 | cum | 3,119 ₹4,22,877.14 | 2,156 ₹2,92,312.64 Lowest | 3,600 ₹4,88,091.6 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.89 | sqm | 302 ₹5,403.69 | 208 ₹3,721.74 Lowest | 385 ₹6,888.81 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.87 | cum | 8,193 ₹56,277.72 | 5,663 ₹38,899.15 Lowest | 10,000 ₹68,690 |
Tender Value
₹41.9 L
EMD Value
₹50,000
Closing Date
21 Mar 2026, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer Minor Irrigation Division Pathanamthitta
GENERAL Vengal thodu Providing irrigation facilities at the downstream of Vengal Palam in Thiruvalla Constituency General Civil Work
2026_Irrig_846948_1
IRR/IA/TR/1107/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Pathanamthitta
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
16 Jun 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
21 Mar 2026
12 Mar 2026
Improving irrigation facilities
OD50746/2025-2026:Removing water weeds such as hyacinth,grass etc by rooting out small trees and all other debris using ambhiboius excavator where ever necessary including conveying the debris from the site and disposing the same with contractors on risk of choice etc complete and disposing the same suitably without causing any harm to the environment as per the direction of deptl.officers at site.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD52181/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1431037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1431037.xls
BOQ • 0.30 MB
sbd1.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .