Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed | |
| 2 | L2₹1.7 L+₹5,422.29 (3.31%)Rejected-Finance | L2 | Rejected-Finance High quoted | |
| 3 | L3₹1.9 L+₹21,633.06 (13.2%)Rejected-Finance | L3 | Rejected-Finance High quoted |
Tender Value
₹1.7 L
EMD Value
₹4,230
Closing Date
7 Nov 2022, 3:00 pmClosed
Office of the Executive Engineer, PWD Roads Divisi
The Executive Engineer, PWD Roads Division, Kozhikode
Construction of footpath , rainwater percolation sump on Kalathilparamba road ward 71 of Kozhikode Corporation
2022_PWD_522772_1
DB3/TN/62/2022-23 (62)
Open Tender
Civil Works - Roads
Item Rate
90 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹4,230
Yes
7 Dec 2022
31 Oct 2022
9 Nov 2022
31 Oct 2022
7 Nov 2022
31 Oct 2022
Amount
Balance work
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
HANEEFA P V
PRABILKUMAR P
Bidder Name
HANEEFA P V
ASHIK VISWANATH
PRABILKUMAR P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_752069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .