Loading…
Loading…
Tender Value
₹59.6 L
EMD Value
₹60,000
Closing Date
16 Mar 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Zone-6, Vadodara
Modular Operation Theatre at DH Lunawada Ta.Lunawada ,Dist.Mahisagar (Reinvite)
284044
2025-26/162/02
Open
Civil Works - Buildings
Panchmahal
1 document required · 1 mandatory
₹2,400
Yes
PIU-GENERAL FUND A/C 11-114-Gandhinagar
₹60,000
Yes
7 Mar 2026
7 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
Supply, Installation, Testing and Commissioning of Pre Fabricated Modular
Operation Theater Panels (Walls and Ceiling) made out Polyurethane foam injected
at 40 Kg/m3 sandwiched between0.8 mm thick GP/SP sheet on front side and
mm GP/SP/PPGI sheet on back-side. The inner surface walls be fixed to the bricks
wall with essential support. There will be minimum possible cavity/gap in between
solid and steel walls and will be variable to suit the architects lay out for the flush
mounting of the equipments. The wall and ceiling panels must comply with
necessary provision of to JIS Z 2801/ISO 22196, BS EN 1363-1:2020, EN 1363- Rupees Six Thousand
1 138.92 2:1999, EN 1364-1:2015, DIN Sq Mtrs. 6550.00 Five Hundred Fifty
52210-2:1984-08, DIN 4102-1, Class A2. Any Third-party compliance certificate Only
mandatory. Panel should be covered with protective sheath of 300 d.f.t Anti-
bacterial Paint having undergone Washability/Water resistance Test JIS K
5663.7.12, permeability test less than 200 unit of permeability, Anti-bacterial effect
against staphyloccoccus aureus, Escherichia coli (via HALO test) and safety and
causative agents such as formaldehyde, toluene, xylene, paradichlorobenzene etc.
Third party (NABL approved Lab) certification for EGP and thickness test
certificate to be submittedat time of supply.
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The
ceiling filtration system in the surgical theatre should ensure a unidirectional
distribution of sterile air, covering all areas affected by the airflow. It should consist
of a laminar flow system incorporated within a frame made from thick extruded
aluminum profiles, complete with a sealed gasket to prevent leaks. The system
should incorporate "H 14" class HEPA filters positioned in the ceiling plenum.
These filters should achieve an MPPS average efficiency greater than 99.95% and a
3-micron DOP efficiency greater than 99.99%. The filters should also be designed
to handle a final pressure drop of no more than 600 Pa, operate at a maximum
temperature of 60 degrees Celsius, and function effectively within a relative
humidity range of 40-50%. The filtration ceiling system should be capable of
maintaining a constant airflow velocity of 0.25 m/s at the diffuser. This should be
accomplished through the use of a diffuser or flow equalizer that ensures uniform Rupees Three Lakh
2 1.00 and constant air distribution over the entire surface area. The structure holding the Nos. 390000.00 Ninety Thousand
filtration system, including the filter frames and top plenum, should be made from Only
either aluminum or stainless steel. The system should be CE/UL certified and
designed to achieve an ISO 14644/1 classification of ISO 5, with a bacteriological
class of B (5 CFU/m3) and particle decontamination kinetics CP of 5 minutes. After
installation, the system's performance should be validated by a third-party
government-approved environmental lab to ensure compliance with specified
standards. A positive pressure should be maintained inside the operating theatre to
prevent contamination from external air sources. The supplier should provide test
certificates for the HEPA filters and the laminar airflow systems from the original
manufacturers. Furthermore, the size of the laminar airflow system should be a
minimum of 8 feet by 8 feet. Finally, the entire system should meet CE/BIS
certification standards, ensuring it adheres to both European and Indian safety and
performance regulations.
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
The flooring within the surgical theatre should consist of a minimum of2 mm thick
antistatic seamless PVC, ensuring durability and safety. This floor should be
smooth, non-slip, and made from an impervious material with sufficient
conductivity to dissipate static electricity effectively, yet not so conductive as to
risk electric shock to personnel. The PVC used should be of very high quality,
particularly designed for electrostatic charge dissipation, and should not be less
than 2 mm in thickness. The installation process should utilize continuous rolls,
and joints should be seamlessly welded using special PVC thermal welding units
with welding bars of the same color to ensure uniformity and prevent
contamination. The sheets should be highly durable, capable of resisting shocks,
indentations, and scratches. The conductive material should be uniformly
impregnated within the PVC as grains to enhance its antistatic properties.
Additionally, the flooring should be inert to body fluids, chemicals, and
disinfectants, and remain unaffected by temperature variations typical within an
operating theatre. It should efficiently discharge electric charges up to 2 kV, and the
electrical resistance (point to ground) should be maintained within 2.5x10^4 to
3 38.70 Sq Mtrs. 4250.00 Thousand Two
5x10^6 ohms, ensuring no buildup of electrical charge beyond 100 volts. Floor
Hundred Fifty Only
installation should be performed by skilled workers from accredited agencies
authorized by the PVC sheet supplier. The installation should include a conductive
copper grid beneath the PVC sheet, supported by liquid epoxy compounds to create
a uniform and level surface. Copper strips should be made visible by grinding and
not project more than 0.5mm above the floor level to prevent damage to the PVC
sheet, with one earthing lead brought out from every 150 sq.ft area and attached to
the main earthing strip/ground. The flooring should also be mechanically
shockproof, scratchproof, flame retardant, and antimicrobial. Corners of the
flooring should be uniformly curved, and a concealed cove-former (aluminium)
should overlap the wall panel to a height of approximately 25mm and be sealed
perfectly and uniformly. Before laying the PVC, suitable self-leveling compounds
should be used to prevent any undulations within the operating theatre. The final
surface should be non-corrosive to biological fluids and detergents, with a color
that is uniform, pleasant, and matching with the ambience as approved by the
respective consignee.
The door to the surgical theatre should be a hermetically sealed, single sliding door
measuring 2.1 meters in height and 1.5 meters in width. The door should be
equipped with a controller capable of being operated by elbow switches, foot
switches, and a touchless sensor, providing multiple, accessible control options.
The track for the door should be made from stainless steel or aluminum, with the
running surface for the top rollers angled appropriately to minimize resistance and
facilitate smoother movement. The door leaf should be suspended using high-
quality hard plastic rollers with double bearings at the top. These rollers should
run under the stainless steel or aluminum track to ensure smooth and noiseless
operation. The opening and closing mechanisms of the door should be controlled
by a microprocessor for precise electromechanical movement. The material of the
door should be either SMS or HPL, with a color that matches the interior design.
The door should be designed to be strong yet lightweight for ease of use. In case the
automatic mechanism fails, the door should still be able to open and close
effortlessly manually. The handle of the door should be made from stainless steel
with a matte finish and equipped with a high-quality cylindrical or ESPg lock for
security. The door leaf should incorporate a high-quality synthetic rubber gasket
Rupees Two Lakh
with long durability to ensure hermetic sealing and maintain a 99.99% air tightness
4 2.00 Nos. 295000.00 NinetyFive Thousand
at a minimum pressure of 75Pa. The floor on either side of the door should be
perfectly level, with a maximum permissible difference of +1mm, to avoid any
tripping hazards or unsealed gaps. The overall thickness of the finished door
should range from 30-60mm, with the inner part of the door filled with CFC-free
polyurethane foam, approximately 48mm thick, sealed airtight to block any
microbial ingress. The door and its controls should comply with IEE regulations,
utilizing DC brushless or PMDC motors that are effectively isolated from mains
power to ensure safety and reliability. Additionally, the door should include a
vision window measuring 300mm x 300mm, featuring double-glazed panels that
are hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start
receiving a signal should be adjustable between 0.5 to 20 seconds.The door
controller should be CE marked, BIS certified, or IEC 60601 certified to meet
international and national safety standards. A test certificate for the hermetically
sealed door frame should be included in the pre-dispatch documents to verify
compliance with the specified standards and functionality. 1 door size 1.5x2.1 and
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
Supply, Installation, Testing and Commissioning of Membrane-Type Operation
Switch and Communication Controller - The Operation Switch and Comms
Controller should encompass all necessary controls to ensure the proper operation
and monitoring of equipment and services in the operating room (OR). Positioned
for optimal visibility in the surgeon's line of sight and the OT staff, the wall-
mounted membrane-buttons should be easily accessible to the nurse for operation
and assistance. In addition to hosting a digital clock and elapsed time indicator, the
panel should feature a medical gas alarm, clearly indicating high and low gas
pressures for each gas service, including vacuum, supported by an audible alarm.
The Operation Switch and Comms Controller should also provide an alarm mute
option for fault annunciation, with pressure sensors strategically located near Rupees One Lakh
5 1.00 isolation valves. Controls for general lighting, including ON/OFF and dimming, Nos. 195000.00 NinetyFive Thousand
organized in groups for uniform illumination, should be present. Furthermore, the Only
panel should facilitate control over operating lights (major and satellite) and
camera functions (on/off and intensity). A hands-free telephone set with memory
should be conveniently situated, and temperature and humidity controls for the
room, linked to the AHU (+/5%) using NO/NC or Chilled Water/Hot Water
Actuator Control Valve (whichever is applicable), should be adjustable from the
Operation Switch and Comms Controller. Real-time indicators, such as a digital
room pressure indicator and HEPA filter bank differential pressure indicator, are
essential for monitoring and maintaining a safe and controlled environment in the
operating room. Telephone with Alpha-numeric keyboard is required with Speed-
Hatch boxes should be provided in each operating theater to facilitate the safe and
efficient removal of waste materials to the dirty linen area or adjacent corridor.
Each hatch box should be equipped with two doors, operated electrically or
motorized, designed such that only one door can be opened at a time to prevent
Rupees One Lakh
cross-contamination. UV lighting should be installed to ensure sterilization and
6 1.00 Nos. 115000.00 Fifteen Thousand
should remain on when both doors are closed, automatically turning off when
either door is opened. Indicators should be provided on both sides of the operating
theater to monitor the door open/close status. The material of the hatch box
should also be SS304 grade stainless steel, with a minimum size of 600mm x
In each operating theater, an operating list board should be installed. It should be
made of ceramic with magnetic properties and should be flush with the wall to
maintain cleanliness and ease of use. LED type flat panel X-ray viewing panels
should be provided, complying with relevant electrical safety codes, and mounted
Rupees TwentyEight
flush with the wall to prevent dust accumulation and microbial growth. The body
7 1.00 Nos. 28500.00 Thousand Five
should be made of extruded aluminum, powder-coated with a bacteria-resistant
and disinfectant-resistant finish. The diffuser on the front panel should provide a
uniformly lit screen, and dimming controls should be easily accessible.
Additionally, a proper spring-loaded film clip with rollers should be included to
securely hold and easily remove films without causing scratches.
LED type flat panel X-ray viewing panel should be supplied. This should comply
with relevant electrical safely codes. This should be a 2-panel viewing screen.
Mounting should be flush with the wall to avoid dust accumulation and growth or
organisms between wall and panel. Body should be of extruded aluminium powder Rupees FourtyOne
8 1.00 coated black with bacteria resistant and disinfectant resistant finish. The diffuser Nos. 41500.00 Thousand Five
on the front panel should be a uniformly lit screen. Dimming electronic control Hundred Only
should be enclosed at the bottom of the cabinet. Proper spring-loaded film clip with
rollers should be provided to hold the films firmly and to remove the film without
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The
scrub station should be compact, designed for use in the OT complex, and facilitate
pre-procedural scrubbing. It should be made from heavy gauge type 304 stainless
steel with a minimum thickness of 1.5mm and feature seamless welded
construction polished to a satin finish. The scrub sink should have a front access
Rupees One Lakh
panel for easy maintenance of water control valves, waste connections, stoppers,
9 1.00 Nos. 126000.00 TwentySix Thousand
and strainers. Hands-free operation should be enabled through infrared sensors
with programmable adjustments. Thermostatic mixing valve control should
maintain constant water temperature and be located behind the access panel.
Timing should be adjustable to meet individual usage requirements, and units
should have reduced anti-splash fronts. An additional knee/foot-operated switch
should also be provided for enhanced functionality.
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
Supply, Installation, Testing and Commissioning of Storage Units - Storage units
should be constructed with same material, as wall and ceiling panels. The shelves,
made of glass and, should be removable for cleaning. The unit should be divided Rupees EightyFive
into two or more parts, each with individual glass doors equipped with a high- Thousand Only
quality locking system. The overall size of the storage unit should
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To
enhance the operational environment of each operating theatre, peripheral lighting
and clean room luminaries should be installed, with a minimum of eight units per
theatre. These lights should offer an intensity of at least 500 Lux and be housed in
highly specular anodized aluminum with an optical antiglare system to minimize
visual fatigue and glare. Each peripheral light should measure 2' x 1'. The covers for
these luminaries should be constructed from highly resistant, disinfectant-proof
laminated safety glass or acrylic, featuring a stylish, fine-grained surface that
complements the clean and sterile environment of the operating theatre. The body
of the luminaries should be made from sheet steel, perfectly powder-coated to
resist contamination and facilitate easy cleaning, and should be ready for Rupees TwentyTwo
11 10.00 connection either as individual units or within a series circuit. This setup should Nos. 22500.00 Thousand Five
include digital electronic control gear utilizing multilamp technology to optimize Hundred Only
energy efficiency and light output. The installation of these luminaries should
ensure that the recess frames are gas tight. Each fitting should be flush with the
ceiling and designed to be removable from either the top or bottom for ease of
maintenance. It is crucial that the light fittings are uniformly and aesthetically
distributed across the ceiling to provide consistent illumination throughout the OT,
without interfering with visibility during procedures such as green mode
endoscopy. Furthermore, the peripheral lighting system should conform to IP65 or
IP54 international protection ratings, ensuring that the fixtures are dust tight and
protected against water ingress, suitable for the demanding conditions of an
operating theatre.
Control equipment for both general lighting and light dimming functionalities
should be centralized within the theatre control panel, allowing for precise Rupees EightyFive
adjustments to meet varying procedural requirements and enhance the Thousand Only
functionality and flexibility of the lighting system in the operating theatre.
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT -
Power distribution within each Operating Theatre (OT) should be handled via
distribution boards located locally to each theatre using Fire Resistance Low
Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to
these panels should be provided by the general electrical contractor, and all
distribution services within the departments should run from these panels. The
power distribution unit should hold certifications such as EN, CE, FDA, IEC, and BIS
to ensure compliance with international safety and performance standards. Each
wall of the MOT should have a minimum of two hybrid switch sockets (6/16A) on
each wall, in compliance with IEC standards. Light fittings within the clinical areas
should be recessed LED types equipped with control gear and sealed in accordance
with the IP54 standard. This standard ensures that the fittings are protected
against limited dust ingress and water spray from all directions, suitable for clinical Rupees Two Lakh
13 1.00 environments. All equipment should be fully and permanently labeled to clearly job 299000.00 NinetyNine Thousand
identify and describe the function, operation, and voltage of the apparatus Only
concerned. Upon completion of the electrical installation, tests should be carried
out in accordance with the relevant sections of local wiring regulations, with
results duly recorded. Each OT should have a distribution board (DBs) installed,
with suitable wiring. A separate enclosure should house all high-voltage equipment
to ensure safety and isolation. The remote cabinet should contain operating lamp
transformers, mains failure relays, UPS, electrical distribution equipment, and
circuit protection equipment for all circuits within the operating theatre. All
internal wiring within the DBs should terminate in connectors equipped with
screws and clamp springs. Connections should be of the clip-on type mounted on a
rail approved by CE/IEC/BIS standards and labeled with indelible proprietary
labels. All internal circuits should be protected by individual fuses or miniature
circuit breakers to ensure safety and manage potential electrical faults effectively.
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
AIR HENDALING UNIT Make:KrVelocity: Not More Then 8 to 10 mt/second.
Canvass Connection-Heavy duty, non partical shreding,Fire Retardentuger,Nikotra
only , Type: PLUG,Drirect Driven,Dynamically Balanced Selection of fan-Should run
comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB
Type:TEFC, IP:55, Foot Mounted, VFD compitable and I2 generation Safety: Motor
should have interlocked with AHU Motor door/excess/Fire DamperType-TWO Rupees Twelve Lakh
14 1.00 TIRE, Floor Mounted , Inner const.:0.6mm plain G.I , Outer const.:0.8 mm G.I. Pre job 1225000.00 TwentyFive
coated / Powder coated Thickness of Insulation: 25mm,PUF injected having density Thousand Only
40 to 42 kg/m3. ,Colour:As approved by CLIENT CONDENSING UNIT :
Condensing unit for AHU with all assesories and instalation (Copper pipie provide
3 mtr Only Extra will charged extra) consider 1200 sqfeet insulation and
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having
following features and enclosed technical specifications, having Mobile App
Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 –
100% (using Digital Capacitive Touch (Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
Rupees Three Lakh
-Working range - 1 m
15 1.00 Nos. 390000.00 Ninety Thousand
-Color rendering index 93Ra
- Focusing Preset: Adjustable
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this
product under Class A, Compliant to IEC standards such as IEC60601-
1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates to be submitted
with Bid) Clause-wise Technical Compliance to be
Item Estimated Estimated Rate
Item Descriptionan Unit Total Amount
Item Descriptionan Unit Total Amount
Rate in Figure Rate in Words
Single-arm surgery/anesthesia pendant designed for Operating Theatres should
feature a compact, modular configuration to meet the precise requirements of
hospitals, enabling customization to suit specific operational needs of both
Operating Theatres and Intensive Care Units. It should be equipped with robust
ceiling support capable of mounting a selection of arms. The extension arm, pivotal
for functionality, should allow horizontal movement with a radius of 800-900mm
and provide a level rotation ranging from 0 to 330/340 degrees, with both the
extension arm and terminal box designed to rotate together and independently for
maximum versatility. The pendant should support a net loading capacity of min.
100 kg, accommodating a variety of medical instruments and devices securely. For
medical and electrical services, it should offer configurations that include at least
two oxygen outlets, two vacuum outlets, one medical air, one medical air at 7 bar,
and an optional nitrous oxide outlet (In-scope of MGPS vendor) Additionally, there Rupees Two Lakh
16 1.00 should be six main sockets, each capable of supporting 5 to 15 amps, conforming to Nos. 284000.00 EightyFour Thousand
universal standards to facilitate the operation of various medical and electronic Only
devices. In terms of materials and construction, the pendant should be crafted from
high-strength aluminum alloy with a sealed design to enhance durability and
maintain sterile conditions. The arm itself should be made from high-density
aluminum alloy extrusion, ensuring both strength and reliability. Installation of the
pendant should be ceiling-mounted to provide a reliable and firm setup, optimizing
space usage in the Operating Theatre or ICU while seamlessly integrating with
existing medical systems for managing medical gas, electrical services, data
communication, and equipment. Additionally, the pendant should include practical
features such as a stainless steel IV pole and a ward vacuum unit clamp to further
enhance its utility in a medical setting. With a net weight of approximately 105 kg,
accessible by the equipment carrier, the pendant should be robust yet manageable,
ensuring it meets the rigorous demands of modern medical environments.
Rupees Three Lakh
Providing and fixing UPS (10KVA) Of Good Quality as directed by engineer
17 1.00 job 375000.00 SeventyFive
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired
Rupees Three Lakh
Point(from existing line ) as directed by engineer incharge from Outer Nearest
18 1.00 job 345000.00 FourtyFive Thousand
Passage to OT Pendant Rate Including , Alarm , Valve (for all line) , Point
,Flowmeter and Probe . if alredy then no payment given
In Words: Rupees Fifty Nine Lakh Fifty Eight Thousand Four Hundred One Only
(A) Total tender amount Rs.
(B) Rebate on above tender amount (if any) (% in figure)________(% in Words)___________________________________________ Rs.
(C ) Net tendered amount (A-B) Rs.
(D) Net Tendered amount (In words) : Rupees
1 All works shall be carried out as per Public Work Department and other specification of division or as directed.
2 All the columns in the contractor be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Rates quoted include clearance of site ( prior commncement of work and its close). In all respect and held good for work under all condition, site, moisture, weather
Testing of materials shall be as per statement attached with the specifications. The material shall be tested in GERI testing charges @ 1% of the amount as per the
4 schedule -B shall be recovered from the contractor from the running bill as per G.R. (E&R) deptt. No. TKC/1085/4-S dt. 20-12-91. Test results other than GERI will not
1% of the construction cost of shall be deducted from bill amount of contract, as per hthe building and other construction worker's welfare cess act. 1996. (Labour &
5 Employment department letter No. C.W.A. - 2004 - 1831- M(3), Dt. 09/12/2005, Notification of labour & Employment Department. Dt. 03-01-05- and Labour &
Employment Department. letter No.C.W.A. - 2004 - 1831- M(3), Dt.14/12/2005)
Quantity, rates & working of items are as per estimates and calculation in the schedule "B" are arithmetically checked and found correct.
Deputy Executive Engineer Executive Engineer
Project Implementation Unit Project Implementation Unit
Mahisagar Mahisagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BUILDING SPECIFICATION BOOKLET.pdf
22.PLUMBING SPECIFICATION.pdf
ElectricalSpecification DO NOT PRINT.pdf
GR-Special Conditions All.pdf
MOT DH Plan-2.pdf
05-Final Draft PQ for OT-CE sir-09-01-2026.pdf
Annexure-2 MOT DH Lunawada.pdf
DTP Statement MOT DH Lunawada.pdf
SBD OT DH Lunawada Final.pdf
SCHEDULE-B MOT DH Lunawada.pdf
Specification MOT DH Lunawada.pdf
Download all tender documents and submit your bid