Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance DUBHAR SHIVPUR DIYAR NAI BASTI BALLIA SHIVPUR DIYAR NAI BASTI BALLIA NEAREST INDIAN OIL PETROL PUMP BALLIA UTTAR PRADESH 277401 | BALLIA | UTTAR PRADESH | 277401 | Admitted-Finance |
| 3 | Admitted-Finance OKDENGANJ BALLIA BALLIA UTTAR PRADESH 277001 | BALLIA | UTTAR PRADESH | 277001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
9 Jun 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC Ballia
Civil Line Ballia
Electrification of Jannayak Chandrashekhar Univercity (instation of 5 MVA TF)
2025_PVVNV_1043008_1
08/EDC(B)/II/2025-26
Open Tender
Electrical Works
Lump-sum
Ballia
Please Refer tender documents
2 documents required · 2 mandatory
₹3,540
SE EDC Ballia
₹27,000
Yes
11 Jul 2025
26 May 2025
10 Jun 2025
26 May 2025
9 Jun 2025
26 May 2025
Supply of following decentralised materials as per RESSPO/PuVVNL norms at the work site.
11 KV Cable Joiting Kit 3x300 SQ MM² XLPE O/D
11 KV Cable Joiting Kit 3x300 SQ MM² XLPE I/D
Control Cabel 2x2.5 mm²
Control Cabel 4x2.5 mm²
PG Clamp of Dog conductor
24 volt battery with charger with cabinet
Shifting,loading ,carriage& unloading of following materials on private truck at store centre Ballia & Un-loading of the same with proper stacking at work site .
33/11 kv 5 MVA Transformer
ACSR ‘Dog’ Conductor
11 KV XLPE Cable 3x300 mm²
33 kv PT O/D 33/110 V with Structure (3 No)
11 kv incoming VCB
33 KV VCB with control Pannel for single T/F control panel & CT 200/100/1A With Structure
33 kv Post Insulator & Structure (3 No), 33 KV LA & Structur (6 No) , 33 KV Isolator & Structure (3 No) , 33 KV Fuse set Complete (3 No)
Work of following materials as per RESSPO/PuVVNL norms at the work site.
Making of Plith for 5 MVA Power Transformer with supply of all rqured matrerials Erection of Single pole structure on 9 Mtr PCC Pole including all works of evocation of pit, pole erection, & fitting of all accessories ( 'V' type cross arm 100 x 50 x 6 mm,/side arm with clamps with bolt and nut, composite polymer pin, insulator. complete (as per RESSPO Norms).
Instalation of 5 KVA Power Transformer on plinth with safaly in Swichtyanrd area and Erection all fitiing. (as per RESSPO Norms) .
Instalation of 11 kv VCB with safaly in contola room and Erection all fitiing. (as per RESSPO Norms) .
Instalation of 33 KV VCB with control Pannel for Single T/F control panel & CT 200/100/1A with Structure (as per RESSPO Norms) .
Pipe Earthing of Power Transformer (2 Dia 6 meter length) with supply all requred materials. (as per RESSPO Norms) .
Istalation of GI Streep withall requred materials.(as per RESSPO Norms) .
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) of Double cable by digging pit & making trench in Proper size(1.2M depth x1M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks/ HDD Method as per site required.
Fixing of PG Clamps
Jai ambey traders (BID ID -5240248)
R A ENGINEERS (BID ID -5235671)
M/s. Yuwa Shakti Construction (BID ID -5241549)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .