| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹15.5 L+₹1.5 L (10.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹16.2 L+₹2.2 L (15.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹17.0 L+₹3.0 L (21.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹17.6 L+₹3.6 L (25.8%)Admitted-Finance MINJEE PROPER THANG MINJEE KARGIL KARGIL KARGIL LADAKH 194105 | KARGIL | LADAKH | 194105 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NUN KUN STC ENGINEERING OPC PRIVATE LIMITED L5 | M/S GHULAM ABASS L1 | MUZAFFAR L3 | M/S GULZAR HUSSAIN L2 | M/S GHULAM MUSTAFA L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed:All kinds of soil : 50 meter beyond 1 m from cutting edge | 6.68 | Cum | 300 ₹2,364.72 Lowest | 330.49 ₹2,605.05 | 300 ₹2,364.72 Lowest | 400 ₹3,152.96 | 400 ₹3,152.96 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.89 | Cum | 4,800 ₹5,040.96 | 4,255 ₹4,468.6 Lowest | 5,500 ₹5,776.1 | 5,400 ₹5,671.08 | 5,000 ₹5,251 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.79 | Cum | 7,200 ₹49,191.84 | 6,016.95 ₹41,109.01 Lowest | 7,500 ₹51,241.5 | 7,900 ₹53,974.38 | 7,000 ₹47,825.4 |
| 4.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including | 7,250.87 | Kg | 150 ₹12,83,403.99 | 118 ₹10,09,611.14 Lowest | 135 ₹11,97,843.72 | 132 ₹11,29,395.51 | 150 ₹12,83,403.99 |
| 5.00 | Providing corrugated G.S. sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks,bolt sand nuts 8 mm dia metre with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/vertical or curved surfaces), excluding the cost of purlins, rafter sand trusses and including cutting to size and shape wherever required. 0.80 mm thick with zinc coating not less than 275 gm/m2 | 257.44 | Sqm | 1,200 ₹3,64,535.04 | 974.58 ₹2,96,057.14 Lowest | 1,000 ₹3,03,779.2 | 1,000 ₹3,03,779.2 | 1,000 ₹3,03,779.2 |
| 6.00 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolt sand nuts 8 mm dia G.I. limpet and bitumen washers complete. 0.80 mm thick with zinc coating not less than 275 gm/m2 | 59.5 | Metre | 800 ₹56,168 | 652.54 ₹45,814.83 Lowest | 800 ₹56,168 | 750 ₹52,657.5 | 800 ₹56,168 |
Tender Value
₹18.6 L
EMD Value
₹37,000
Closing Date
17 Jun 2026, 5:00 pmClosed
DGM P and C, Chutak Power Station
Office of DGM P and C, Chutak Power Station
Construction of Shed on the Pathway near Control Room at Barrage complex of Chutak Power Station Kargil UT Ladakh
2026_NHPC_910543_1
2026_NHPC
Open Tender
Civil Works
Works
Chutak Power Station Minji Kargil UT Ladakh
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NHPC LIMITED
₹37,000
1 Oct 2026
27 May 2026
20 Jun 2026
27 May 2026
17 Jun 2026
27 May 2026
27 May 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed:All kinds of soil : 50 meter beyond 1 m from cutting edge | 6.68 | Cum | 526.11 | ₹3,514.41 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.89 | Cum | 6,755.89 | ₹6,012.74 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.79 | Cum | 9,432.39 | ₹54,613.54 |
| 4 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including | 7,250.87 | Kg | 185.73 | ₹13,46,704.09 |
| 5 | Providing corrugated G.S. sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks,bolt sand nuts 8 mm dia metre with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/vertical or curved surfaces), excluding the cost of purlins, rafter sand trusses and including cutting to size and shape wherever required. 0.80 mm thick with zinc coating not less than 275 gm/m2 | 257.44 | Sqm | 1,506.75 | ₹3,87,897.72 |
| 6 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolt sand nuts 8 mm dia G.I. limpet and bitumen washers complete. 0.80 mm thick with zinc coating not less than 275 gm/m2 | 59.5 | Metre | 1,025.81 | ₹61,035.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TENDERW613.pdf
Tender Documents • 2.57 MB
BOQ_956962.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .