| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC ACCEPTEDBID |
| 2 | L2₹12.3 L+₹1.2 L (11.3%)Rejected-Finance | ₹12.3 L+₹1.2 L (11.3%) | L2 | Rejected-Finance L2 |
| 3 | L3₹12.7 L+₹1.7 L (15.4%)Rejected-Finance 679334 | MALAPPURAM | KERALA | 679334 | ₹12.7 L+₹1.7 L (15.4%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L5 |
Tender Value
₹13.2 L
EMD Value
₹39,550
Closing Date
27 Oct 2022, 5:00 pmClosed
DISTRICT SOIL CONSERVATION OFFICER IDUKKI
DISTRICT SOIL CONSERVATION OFFICER IDUKKI MOOLAMATTOM P O 685589
Construction of DR Retaining walls1.50m ht and 2m ht of length 140m and 30m RCC protection wall 2.50mht of length 12m
2022_DSSC_515406_2
D(4)778/2022/DSCOIDK/LSS
Open Tender
Civil Works - Others
Item Rate
180 days
Mariyapuram Panchayat
Please refer tender documents
5 documents required · 5 mandatory
₹2,755
₹39,550
Yes
23 Nov 2022
19 Oct 2022
29 Oct 2022
19 Oct 2022
27 Oct 2022
19 Oct 2022
Amount
RETAINING WALL USING BLASTED RUBBLE 1.50M HEIGHT-140 RM
Earthworkexcavation for sidecutting and foundation as per code 2.6.1
Dismantling DR -foundation and Superstructure as per code 60.7.3(20m)
Dry Rubble Masonry-as per code 60.7.8 forfoundation and Superstructure (15m)
Dry Rubble Masonry-as per code 60.7.1 forfoundation and Superstructure (125m)
Centring and shuttering fincluding strutting,propping etc.and removal of form work for foundations,footings,bases for columns as per code 4.3.1
Cement concrete 1:3:6 for top of retaining wall as per code 4.1.5
RETAINING WALL USING BLASTED RUBBLE 2.00 M HEIGHT -30 RM
Earthworkexcavation for sidecuttingand foundation as per code 2.6.1
Dry Rubble Masonry-as per code 60.7.1 forfoundation and Superstructure (30m)
Centring and shuttering for top PCC as per code 4.3.1
Cement concrete 1:3:6 for topof retaining wall as per code 4.1.5
R C C PROTECTION WALL 2.5M HEIGHT -12 RM
Earthworkexcavation for sidecuttingand foundation as per code 2.6.1
Centring and shuttering for top PCC as per code 4.3.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work up to plinth level 1:4:8 as per code of 4.1.8
Steel reinforcement for RCC work including straightening, cutting,bending,placing in position and binding all complete upto plinth level -as per code of 5.22.6
Centering and shuttering including sturtting,etc and removal of form for foundations, footings, bases of columns,etc for mass concrete.as per code of 5.9.1
Centering and shuttering including sturtting,etc and removal of form for walls (any thickness) including attached pilasters,butteresses,plinth and string courses etc.as per code of 5.9.2
providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering ,shuttering,finishing and reinforcement- All work upto plinth level 1:2:4 .as per code of 5.1.3
NEW KERALA BUILDERS
SUNIL KUMAR
Radhakrishnan
Varkey Mathew
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742930.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .