Loading…
Loading…
Tender Value
₹3.1 Cr
EMD Value
₹3.8 L
Closing Date
28 Sept 2026, 4:00 pm
Chief Engineer (P) Arunank
HQ CE (P) Arunank (GREF), Dam site, Naharlagun, AP
ENGAGING TECHNICAL CONSULT FOR PREP OF FS AND DPR ON EPC MODE FOR CONST OF RD HURI-TAKSING (NEW ALIGNMENT) FROM KM 0.00 TO 95.348 GREEN FIELD ALIGNMENT TO NHDL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 TF (P) ANK IN THE STATE OF A. P
2026_BRO_786820_1
CE(P) ANK/NIT-11/2026-27
Open Tender
Consultancy Services
Lump-sum
240 days
Huri-Taksing Road
Please refer Tender Documents
5 documents required · 5 mandatory
₹5,000
Chief Engineer (P) Arunank
₹3.8 L
HQ CE (P) Arunank (GREF), Dam site, Naharlagun, AP
29 Aug 2026
29 Aug 2026
29 Sept 2026
29 Aug 2026
28 Sept 2026
8 Sept 2026
31 Aug 2026 - 5 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Remuneration for Local Staff | |||||
| 1.01 | Team Leader cum Senior Highway Engineer | 8 | Months | - | - |
| 1.02 | Bridge Design Engineer | 4 | Months | - | - |
| 1.03 | Highway Design Engineer | 4 | Months | - | - |
| 1.04 | Traffic and Road Safety expert | 4 | Months | - | - |
| 1.05 | Environmental Specialist | 4 | Months | - | - |
| 1.06 | Material-cum-Geo-technical Engineer-Geologist | 4 | Months | - | - |
| 1.07 | Senior Survey Engineer | 6 | Months | - | - |
| 1.08 | Quantity Surveyor / Documentation Expert | 8 | Months | - | - |
| 1.09 | Land Acquisition Expert | 6 | Months | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
RFPHuriTaksingTender11.pdf
Tender Documents • 9.67 MB
BOQ_881757.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .