Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹6.8 L+₹1.2 L (22.2%)Accepted-Finance | L2 | Accepted-Finance second lowest bidder | |
| 3 | L3₹6.7 L+₹1.2 L (21.2%)Rejected-Finance | L3 | Rejected-Finance Highest bidder |
Tender Value
₹5.6 L
EMD Value
₹14,000
Closing Date
20 Aug 2026, 3:00 pmClosed
Executive Engineer, PMU, Irinjalakuda
Executive Engineer, PMU, Irinjalakuda,KSEBL, PIN-680121
Standardisation of DTR stations under Electrical Section Thalikulam
2026_KSEB_864854_1
TENDER/2026-27/5154/84 dt. 03-08-2026
Open Tender
Electrical Works
Percentage
Thalikulam
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,416
Yes
₹14,000
26 Sept 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading HT A type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). | 4 | No | 506 | ₹2,024 |
| 2 | Transporting A type pole of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading). | 6 | No | 566.64 | ₹3,399.84 |
| 3 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). | 12 | No | 457.91 | ₹5,494.92 |
| 4 | Transporting one HT PSC pole by Hand cart - normally limited to 4km (excluding loading and unloading). | 18 | No | 457.91 | ₹8,242.38 |
| 5 | Renewing one damaged PSC/RCC Transformer DP structure with a new A type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing. | 2 | E*km | 35,799.5 | ₹71,599 |
| 6 | Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. | 12 | No | 592.77 | ₹7,113.24 |
| 7 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 1 | No | 1,796.09 | ₹1,796.09 |
| 8 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 1 | Each | 3,129.05 | ₹3,129.05 |
| 9 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 6 | meter | 8,735.82 | ₹52,414.92 |
| 10 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | 36 | No | 158.91 | ₹5,720.76 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender_Documents_THKMDTRSTD.pdf
Tender Documents • 0.30 MB
Bid_Form_and_Questionnaire.pdf
Tender Documents • 0.22 MB
GCC.pdf
Tender Documents • 0.59 MB
BOQ_1463459.xls
BOQ • 0.37 MB
Instructions_Sample_Forms.pdf
Other Document • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .