Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Complied with technical specifications |
| 2 | Accepted-Technical | Accepted-Technical Complied with technical specifications |
| 3 | Accepted-Technical | Accepted-Technical Complied with technical specifications |
| 4 | Accepted-Technical | Accepted-Technical Complied with technical specifications |
| 5 | Accepted-Technical | Accepted-Technical Complied with technical specifications |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
14 Apr 2026, 5:00 pmClosed
Vice Chancellor CUK
Tulmulla, Ganderbal-191131
Annual maintenance, repairs and other emergent works (Civil and Sanitary) across different campuses of Central University of Kashmir at Ganderbal
2026_CUoK_904075_1
NIT-03-2026-AMC(Civil)
Open Tender
Construction Works
Percentage
350 days
CUK, Tulmulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Central University of Kashmir
₹1 L
Yes
Engineering Wing, CUK
29 Apr 2026
30 Mar 2026
16 Apr 2026
30 Mar 2026
14 Apr 2026
30 Mar 2026
30 Mar 2026 - 7 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1All Items of DSR 2023 | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.67 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 0.56 MB
BOQ_950263.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .