Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.8 L+₹11,908.74 (4.52%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.0 L+₹36,656.12 (13.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,998
Closing Date
24 Sept 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
CONSTRUCTION OF TURF AT SHEIKH UL ALAM GROUND TARZOO GROUND 5 PANCHAYAT HALQA TARZOO C CDF 2026-27
2026_RDPR_325127_25
229/2026-27 Dated 18-09-2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer REW Baramulla
₹5,998
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excation by manual means in all kinds of soils, disposal of excavated eath by lead and lift of 50 meter an d 1.5 meter respectively | 89.01 | cum | 570 | ₹50,735.7 |
| 2 | Consolidation of Pitch base to required gradient and X-ssection using of 8-10PRR to achieve the required density | 178.05 | cum | 2.8 | ₹498.54 |
| 3 | Providing /laying of stone soling in trenches hand packed of size not more than 100mm including consolidation with PRR8 ton capacity ,incl. all leads,lifts and carriage complete job. | 26.71 | cum | 1,200 | ₹32,052 |
| 4 | S/L of coarse sand incl. sieving of sand properly to remove any foreign substance and laying in layers not exceeding 50mm in depth and surface to be flooded with water incl. carriage of sand from near source. | 26.71 | sqm | 3,000 | ₹80,130 |
| 5 | S/L of sandy loom(mixture of fine sand and fine clay )in ratio 1:10 to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 tonne roller or plate vibrator incl all leads,lifts and carriage complete job. | 17.8 | cum | 2,500 | ₹44,500 |
| 6 | S/L of top layer of earth having highest clay content available to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 tonne roller or plate vibrator,incl all leads ,lifts and carriage complete job. | 26.71 | sqm | 1,200 | ₹32,052 |
| 7 | Providing / fixing 15*15 feet cricket canvas sight screen and is movable foldable with stable MS section frame with channel base with 4 special turf tyres allowing easy movement with color black on one side of sight screen and white color on other side including sign board. | 1 | no | 60,000 | ₹60,000 |
stage.html
html • 0.02 MB
finance_1097886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1097886.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .