Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62,910Accepted-AOC | ₹62,910 Quoted ₹62,010 | L1 | Accepted-AOC Accepted |
| 2 | L2₹65,453Rejected-AOC | ₹65,453 | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SREEKESHKUMAR L1 | RAJAN G THOMAS L2 |
|---|---|---|---|---|---|
| 1.00Pump and Motor Maintanence | |||||
| 1.00 | OD19326/2025-2026:Supplying good quality IR Sheet | 10 | kg | 110.34 ₹1,103.40 | 150 ₹1,500 |
| 1.00 | OD19327/2025-2026:Supplying good quality gland packing | 2 | kg | 418.14 ₹836.28 | 250 ₹500 |
| 1.00 | OD19331/2025-2026:Supplying best quality bearing grease including all cost | 12 | kg | 357.74 ₹4,292.88 | 254 ₹3,048 |
| 1.00 | OD19329/2025-2026:Engaging man coolie for removing silt slipped earth and rubble from the suction pit including all cost etc complete | 17 | each | 1,082.18 ₹18,397.06 | 215 ₹3,655 |
| 1.00 | OD19330/2025-2026:Supplying good quality transformer oil for starter | 10 | Litre | 563.33 ₹5,633.30 | 150 ₹1,500 |
| 1.01 | OD19332/2025-2026:Dismantling 160 mm dia foot valve from the suction pipe and refitting after maintenance | 1 | each | 6,007.96 ₹6,007.96 | 250 ₹250 |
| 1.01 | OD19333/2025-2026:Dismantling pump ,motor and removing the suction pipe from position for rectification of motor etc complete | 1 | each | 4,561.9 ₹4,561.90 | 5,000 ₹5,000 |
| 1.01 | OD20849/2025-2026:Rectification of impeller shaft such as welding levelling grinding where ever necessary including all cost and labour etc complete as per the direction of officers at site | 1 | each | 16,144.85 ₹16,144.85 | 25,000 ₹25,000 |
| 1.01 | OD20722/2025-2026:Setting pump and motor with new packing and assembling the motor etc complete as per the direction of departmental officer at site | 1 | each | 5,932.47 ₹5,932.47 | 25,000 ₹25,000 |
Tender Value
₹62,910
EMD Value
₹1,573
Closing Date
25 Oct 2025, 5:00 pmClosed
AEE,MINOR IRRIGATION SUB DIVISION, KOTTARAKKARA
AEE,MINOR IRRIGATION SUB DIVISION, KOTTARAKARA
GENERAL Annual Maintenance 2025 26 Annual maintenance of pump and motor of LI Station No 7 in Sooranadu North panchayath for the year 2025 26 General Civil Work
2025_Irrig_811870_1
IRR/IA/3879/2025-2026
Open Tender
Civil Works - Others
180 days
Sooranadu North Panchatath
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹1,573
Yes
27 Dec 2025
18 Oct 2025
29 Oct 2025
18 Oct 2025
25 Oct 2025
18 Oct 2025
Amount
Pump and Motor Maintanence
OD19326/2025-2026:Supplying good quality IR Sheet
OD19327/2025-2026:Supplying good quality gland packing
OD19331/2025-2026:Supplying best quality bearing grease including all cost
OD19329/2025-2026:Engaging man coolie for removing silt slipped earth and rubble from the suction pit including all cost etc complete
OD19330/2025-2026:Supplying good quality transformer oil for starter
OD19332/2025-2026:Dismantling 160 mm dia foot valve from the suction pipe and refitting after maintenance
OD19333/2025-2026:Dismantling pump ,motor and removing the suction pipe from position for rectification of motor etc complete
OD20849/2025-2026:Rectification of impeller shaft such as welding levelling grinding where ever necessary including all cost and labour etc complete as per the direction of officers at site
OD20722/2025-2026:Setting pump and motor with new packing and assembling the motor etc complete as per the direction of departmental officer at site
RAJAN G THOMAS (BID ID -2397366)
Bidder Name
SREEKESHKUMAR
RAJAN G THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1356197.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd7.pdf
Tender Documents • 1.63 MB
BOQ_1356197.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid