Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC Awarded |
| 2 | 2₹2.0 LRejected-AOC | ₹2.0 L | 2 | Rejected-AOC Not Awarded |
| 3 | 3₹2.0 LRejected-AOC | ₹2.0 L | 3 | Rejected-AOC Not Awrded |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
28 Mar 2019, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Hydel Campus, Near L.I.C. Office Rampur Garden, Bareilly
Periodic / Routine / Preventive / Breakdown Maintenance of 33KV Incoming Lines from 132KV S/S Dohna to 400KV S/S Bly for Station Supply at 400KV S/S Bly with associated Works under E.400KV S/S Div., Bly during the Period of 1 Year
2019_UPTCL_334736_1
E-Tender No. 132 / W / ETC(B) / 2018 - 19
Open Tender
Electrical Works
365 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹2,000
25 Sept 2020
8 Mar 2019
29 Mar 2019
8 Mar 2019
28 Mar 2019
8 Mar 2019
8 Mar 2019 - 28 Mar 2019
Amount
Periodic / Routine / Preventive / Breakdown Maintenance of 33KV Incoming Lines from 220KV / 132KV Sub Station Dohna to 400KV Sub Station Bareilly for Station Supply at 400KV Sub Station Bareilly alongwith other associated Works during the Period of 1 Year w.e.f. 01.04.2019 to 31.03.2020, with all Cost of Men, Materials, Misc. Consumables T&Ps etc. Required for Satisfactory Completion of the Work, as per Technical Specification and Direction of Supervising Engineer : (1) Monthly Patrolling of Following 33KV Incoming Lines from 220KV / 132KV Sub Station Dohna to 400KV Sub Station Bareilly for Station Supply at 400KV Sub Station Bareilly and Providing of Patrolling Report : (a) Monthly Patrolling of 33KV Line from 220KV / 132KV Sub Station Dohna to 400KV Sub Station Bareilly. (3.5 Km Length × 12 Months = 42.0 Km)
(b) Monthly Patrolling of 33KV Line from Tapping Point of 33KV Dohna (132KV Sub Station Dohna) - Nawab Ganj (33KV Sub Station) Line to 400KV Sub Station Bareilly. (1.0 Km Length × 12 Months = 12.0 Km)
(2) Periodic Lopping & Chopping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyptus, Popular etc. Falling in Corridor of the above 33KV Transmission Lines to Provide Minimum Clearance of about 8 Meter between the Tree & Conductors on both side of the Towers / Line with all due Care of Safety & Precautions to Avoid any Damage to Nearby Buildings, Power & Telephone Lines Passing Nearby, Crops, other Nearby Trees etc. The Work also includes Removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees during the Period of 1 Year w.e.f. 01.04.2019 to 31.03.2020.
(3) Replacement of Old & Damaged Stay Set (due to Rusting) by new Stay Set (G.I. Stay Rod of size 20 × 1800 mm, 7/8 SWG Stay Wire, Stay Clamp, Bolts - Nuts - Washers etc. with due Concrete Grouting. (1 Job per Stay Set)
(4) Providing & Fixing of Danger Board alongwith associated Fixtures.
(5) Re-Concreting of Damaged Stone Pad of S.T. Poles.
(6) Restringing of Loose Sagged Conductors, if Found Loose.
(7) Providing of 33KV XLPE Cable Out Door End Jointing Kit alongwith Cable Jointing Work, whenever Required. (1 Job per Cable Out Door End Jointing Kit)
(8) Providing of 33KV XLPE Cable Straight Through Jointing Kit alongwith Cable Jointing Work, whenever Required. (1 Job per Cable Straight Through Jointing Kit)
(9) Replacement of Damaged 33KV Tension Disc Insulator / Insulator String by new Disc Insulator to be Provided by the Department Free of Cost as per Requirement. (1 Job per Tension Insulator String)
(10) Replacement of Damaged 33KV Pin Insulator by new Pin Insulator to be Provided by the Department Free of Cost as per Requirement. (1 Job per Pin Insulator)
(11) Replacement of Damaged Pin of 33KV Pin Insulator by new Pin of 33KV Pin Insulator to be Provided by the Department Free of Cost as per Requirement. (1 Job per Pin)
(12) Replacement of Damaged P.G. Clamp (ACSR Dog Conductor to ACSR Dog Conductor) by new ones to be Provided by the Department free of Cost as per Requirement. (1 Job per P.G. Clamp)
(13) Tightening of Jumper / Clamp including Replacement of Damaged Bolts - Nuts - Washers, if any by new ones to be Provided by the Department Free of Cost as per Requirement. (1 Job per Jumper / Clamp)
(14) Replacement of Damaged Jumper by new One whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. (1 Job per Jumper)
(15) Attending Break Down of Snapped Conductor due to Damage of Conductor / Tension Insulator String, whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. (1 Job per Conductor)
Ashu air conditiong service
LASHANI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid