Loading…
Loading…
Tender Value
₹28.5 L
EMD Value
₹28,500
Closing Date
6 Feb 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Chief Officer, Ode Municipality, Ode
BID DOCUMENTS FOR CONSTRUCTION WORK OF C.C. ROAD IN VARIOUS AREA AT ODE NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYAMANTRI SHAHERI VIKAS YOJANA YEAR: 2024-25.
268547
SJMMSVY/2024-25
Open
Civil Works - Roads
Anand
14 documents required · 14 mandatory
₹1,770
The Chief Officer, Ode Municipality, Ode
₹28,500
22 Jan 2026
22 Jan 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Chief Officer
Ode Nagarpalika
SECTION-7 BILL OF QUANTITIES-141
ODE MUNICIPALITY, ODE
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C. C. ROAD
FROM BOREROOM TO JB TOBACCO IN WARD No.2 AT ODE
Item Qty. Description Total Unit Amount
1 108.00 Demolition and disposal of unserviceable materials with all lead
Cmt. and lift. (i) Lime concrete.
2 94.50 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead
3 63.00 Providing and laying compacted 100 mm thick B.T. Metalling (45
Cmt. to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 101.50 Providing and laying cement concrete (1:4:8) (1 Cement,
Cmt. Coarse sand, 8 Crushed stone agreegate 40 mm nominal) and
curing complete excluding cost of formwork in foundation and
5 169.00 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work.
6 1350.00 Labour charges for concreting with vacume dewatering
Smt. Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
charge. 55.55 Smt.
SBD SECTION-7 BILL OF QUANTITIES-142
7 5.00 Renovation of manhole by increasing the height at top including
Nos. cost of excavation, refitting of C. I. manhole frame and cover
curing etc. complete incl. all carting and providing of materials
which is required for the purpose (except manhole frame and
cover). For all type manhole by providing RCC 1:2:4 Partition
walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av.ht.
8 RCC precast M.H. Frame & Cover Manufacture, supply &
Delivery at store or at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design &
Drawing including cost of reinforcement M.S. Angles or Flat,
curing mold work etc.
a. 5.00 Frame suitable for 50cm opening of MH 1132.21 No.
b. 5.00 Cover suitable for 50cm opening of MH 1184.73 No.
Less : Scrape Credit @ Rs.100.00 / Cmt., Rs.
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
SBD SECTION-7 BILL OF QUANTITIES-143
ODE MUNICIPALITY, ODE
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C. C. ROAD
FROM TOTAR MATA GATE TO BOREROOM (MARIYA TEKRA AREA) IN WARD No.2 AT ODE
Item Qty. Description Total Unit Amount
1 90.00 Demolition and disposal of unserviceable materials with all
Cmt. lead and lift. (i) Lime concrete.
2 97.00 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the
excavated stuff and dipositing to road slope as directed all
lead and lift etc. complete upto 50 mt. Lead
3 64.50 Providing and laying compacted 100 mm thick B.T. Metalling
Cmt. (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 93.50 Providing and laying cement concrete (1:4:8) (1 Cement,
Cmt. Coarse sand, 8 Crushed stone agreegate 40 mm nominal)
and curing complete excluding cost of formwork in foundation
and plinth. 2809.74 Cmt.
5 156.00 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work.
6 1245.00 Labour charges for concreting with vacume dewatering
Smt. Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas
as per requirement and labour charges on directed by
Engineer-in-charge.
SBD SECTION-7 BILL OF QUANTITIES-144
7 5.00 Renovation of manhole by increasing the height at top
Nos. including cost of excavation, refitting of C. I. manhole frame
and cover curing etc. complete incl. all carting and providing
of materials which is required for the purpose (except
manhole frame and cover). For all type manhole by providing
RCC 1:2:4 Partition walls with required reinforcement 25 cm
thick and circular opening with 500mm clear dia and 0.40 mt.
8 RCC precast M.H. Frame & Cover Manufacture, supply &
Delivery at store or at site of work precast RCC M.200 Frame
& cover suitable to drainage M.H. and as per type design &
Drawing including cost of reinforcement M.S. Angles or Flat,
curing mold work etc.
a. 5.00 Frame suitable for 50cm opening of MH 1132.21 No.
b. 5.00 Cover suitable for 50cm opening of MH 1184.73 No.
Less : Scrape Credit @ Rs.100.00 / Cmt., Rs.
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
SBD SECTION-7 BILL OF QUANTITIES-145
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
BOQ.pdf
Document
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid