Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | ₹1.8 L | L1 | Accepted-AOC L1 ADMITTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | MUHAMMED KUTTY P L2 | SHAJI T L1 |
|---|---|---|---|---|---|
| 1.00BRIDGE REHABILATATION | |||||
| 1.00 | 13.6:Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 | 35.5 | metre | 3,700 ₹1,31,350 | 3,632.8 ₹1,28,964.4 Lowest |
| 1.00 | 13.1.1.1:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I. R.C.C grade M 20 (i) For nominal mix 1:2:4 | 2.29 | cum | 10,500 ₹24,024 | 10,447.14 ₹23,903.06 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.34 | tonne | 92,300 ₹31,658.9 | 91,976.76 ₹31,548.03 Lowest |
Tender Value
₹1.8 L
EMD Value
₹4,624
Closing Date
17 Jul 2026, 10:00 amClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER, LSGD SECTION, VALLIKKUNU GP
Annual Plan-2025-26 Proj No 563/26 COMPLETION OF BALATHIRUTHI HAND RAIL-Vallikkunnu GP
2026_LSGD_859641_2
04/2026/AE/LSGD/VKN
Open Tender
Civil Works - Others
Item Rate
VALLIKKUNNU
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,624
Yes
18 Aug 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BRIDGE REHABILATATION | |||||
| 1.001 | 13.6:Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 | - | metre | - | - |
| 1.002 | 13.1.1.1:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I. R.C.C grade M 20 (i) For nominal mix 1:2:4 | 1 | cum | - | - |
| 1.003 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1 | tonne | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1453585.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
viewsbd.pdf
Tender Documents • 2.11 MB
fot.pdf
Tender Documents • 0.25 MB
BOQ_1453585.xls
BOQ • 0.30 MB
agreement.pdf
Tender Documents • 0.26 MB
affidavit.pdf
Tender Documents • 0.24 MB
epayment.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .