Loading…
Loading…
Tender Value
₹33.4 L
EMD Value
₹33,370
Closing Date
6 Jun 2026, 5:00 pmDue tomorrow
BDO, Harichandanpur
Panchayat Samiti Harichandanpur, Keonjhar
Construction of Road from NH to SanimadiraHata, Brahmanipal
2026_PRBHP_129753_6
BID IDENTIFICATION NO. BDO Harichandanpur 1 / 2026-27
National Competitive Bid
Civil Works - Buildings
90 days
Harichandanpur Block of Keonjhar District
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,370
Yes
25 May 2026
25 May 2026
8 Jun 2026
25 May 2026
6 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil or gravelly soil except sheet rock requiring blasting to proper profile with all leads, lifts and delifts to proper section and profile including dressing and levelling the bed upto required depth and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads and lifts including dewatering if necessary from foundation complete as directed by Engineer-in-Charge. | 315 | One Cubic Meter | 262.4 | ₹82,656 | BI01010001010000000000000515BI0100001113 |
| 2 | Filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royalty of materials with labour and T&P required for the work as directed by Engineer-in-Charge. | 180 | One Cubic Meter | 1,219.77 | ₹2,19,558.6 | BI01010001010000000000000515BI0100001114 |
| 3 | Cement concrete of proportion (1:3:6) with 40mm & down graded size hand broken H.G. metal for foundation concrete approved quality from approved quarry including hoisting, lowering and laying concrete to the required level ramming, watering, curing etc. complete including cost, conveyance & royalty of materials with all labour charges as directed by Engineer-in-Charge. | 225 | One Cubic Meter | 6,060.82 | ₹13,63,684.5 | BI01010001010000000000000515BI0100001115 |
| 4 | CC (1:2:4) by using 12 mm size cbhg chipps including all cost etc completeas directed by Engineer-in-Charge as directed by Engineer-in-Charge. | 180 | One Cubic Meter | 8,478.1 | ₹15,26,058 | BI01010001010000000000000515BI0100001116 |
| 5 | Hire charges of vibrator Total concrete item no (3+4) | 144 | One Cubic Meter | 153.23 | ₹22,065.12 | BI01010001010000000000000515BI0100001117 |
| 6 | Rigid and smooth centering and shuttering for CC / RCC works. | 500 | One Cubic Meter | 246 | ₹1,23,000 | BI01010001010000000000000515BI0100001118 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.59 MB
Bid_Final.pdf
Tender Documents • 10.57 MB
BOQ_592490.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid