| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance NO 152 E V R NAGAR SRIRANGAM TIRUCHIRAPPALLI 5 | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | ₹1.0 Cr | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹1.1 CrRejected-Finance NO 3 MEENATCHIPURAM THIRUPPATHURAI PERUGAMANI TRICHY 639115 | TIRUCHIRAPPALLI | TAMIL NADU | 639115 | ₹1.1 Cr | L2 | Rejected-Finance Quoted L2 Rate |
| Sl No | Description | Qty | Unit | KALINGA CONSTRUCTIONS L2 | SVT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the nadapallam to Eachampatti road 1/760-3/600. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification | 1,474.2 | sqm | 10 ₹14,742 | 5.9 ₹8,697.78 |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning | 2,331.37 | sqm | 30 ₹69,941.10 | 21.7 ₹50,590.73 |
| 3.00 | Providing and Laying Gravel tocompacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 335.73 | cum | 400 ₹1.3 L | 363.4 ₹1.2 L |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 1,020.6 | cum | 150 ₹1.5 L | 131 ₹1.3 L |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 1/330 | 1,049.1 | cum | 2,500 ₹26.2 L | 2,383.3 ₹25.0 L |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/330 | 6,994.12 | sqm | 90 ₹6.3 L | 83.45 ₹5.8 L |
| 7.00 | Applying TACK COAT over WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0 1/330 | 7,087.5 | sqm | 25 ₹1.8 L | 19.7 ₹1.4 L |
| 8.00 | 8.BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 177.19 | cum | 11,900 ₹21.1 L | 11,853.2 ₹21.0 L |
| 9.00 | Provision for KM Stone | 8 | no | 850 ₹6,800 | 780 ₹6,240 |
| 10.00 | Provision for HM Stone | 2 | no | 2,750 ₹5,500 | 2,730 ₹5,460 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
16 May 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening the Nadarpallam to Echampatti Road.Manachanallur Block,Tiruchirappalli Dt, pkg13
2025_RDTN_553087_13
DIPR/1714/Tender/2025
Open Tender
Civil Works - Roads
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
DRDA Tiruchirappalli
8 Apr 2026
2 May 2025
16 May 2025
2 May 2025
16 May 2025
2 May 2025
9 May 2025
stage.html
html • 0.04 MB
technical_661222.pdf
techsummary_661222.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Techbid13.pdf
Tender Documents • 1.25 MB
BOQ_661222.xls
BOQ • 0.26 MB
PriceBid13.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid