Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹20.5 L
EMD Value
₹2.0 L
Closing Date
26 Nov 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Shri Krishna Kumar
Office of the EE, C.D. PWD, Chandauli
Majhgava se Majhgava sampark marg par Kshatigrast puliya ke sthan par Vishesh Marammat Yojanantargat New Puliya ka Karya
2026_CEUVZ_1204445_11
EE Ref No. 2364/4A/26-27 Dt. 23.10.2026
Open Tender
Civil Works - Roads
Fixed-rate
60 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹2.0 L
Yes
Chandauli
26 Nov 2026
3 Nov 2026
26 Nov 2026
3 Nov 2026
26 Nov 2026
3 Nov 2026
3 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meter (200 feet) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 97 | Cum | 380 | ₹36,860 |
| 2 | Exacavation in foundation in moorum/single/Kanker including lift upto 1.50 m amd lead up to 30 m and including filling watering and ramming of excaveted earth into the space between the building and the sides of foundation tranches or into the plinth and removal and disposal of surface earth and directed by the Engineer in charge upto a distance of 30 m. from the foundation tranches including all T&P phowarah and basket etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 305 | Cum | 130 | ₹39,650 |
| 3 | Concrte with 4Cm gauge approved Stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all matireal labour,tools and plants etc. required for proper completion for the work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 42 | Cum | 5,600 | ₹2,35,200 |
| 4 | R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in foundation including cost of all material labour T&P etc. required for proper completion of work.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 106 | Cum | 4,850 | ₹5,14,100 |
| 5 | R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in sub structure including cost of all material labour T&P etc. required for proper completion of work.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 65 | Cum | 5,100 | ₹3,31,500 |
| 6 | Providing and laying Reinforced Cement Concrete in superstructure as per drawing and techanical specification clauses 800 (Excluding cost of Reinforcement) RCC Grade M-25 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 22 | Cum | 8,030 | ₹1,76,660 |
| 7 | Mild Steel or iron in plain work such as in reinforced concrete including bending for proper completion of the work and incuding supply of steel its wastage etc.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 21 | Qtl | 6,350 | ₹1,33,350 |
| 8 | Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 FM including Supply of all material , labour T&P etc required for proper completion of work.As per SOR SI No-574. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 110 | Sqm | 185 | ₹20,350 |
| 9 | Construction of Diversion and filling with approved material obtained from borrow pits area all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 330 | Cum | 72 | ₹23,760 |
| 10 | RCC Hume Pipes NP-3 , 900mm dia inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 15 | Rm | 6,500 | ₹97,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 1.90 MB
BOQ_2281391.xls
BOQ • 0.29 MB
Corrigendum2364.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .