| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC urgently required |
| 2 | L2₹1.5 L+₹6,200 (4.41%)Rejected-Finance | ₹1.5 L+₹6,200 (4.41%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 L+₹12,650 (9.00%)Rejected-Finance | ₹1.5 L+₹12,650 (9.00%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.6 L+₹16,750 (11.9%)Rejected-Finance | ₹1.6 L+₹16,750 (11.9%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
Closing Date
18 Jan 2021, 9:00 amClosed
Shri Yogendra KUmar, IDSE
Garrison Engineer Hisar Mil Stn
Job order repair for transformer
2021_MES_411193_1
3008/Job/10/E3
Limited
Miscellaneous Services
Item Rate
30 days
Garrison Engineer Hisar Mil Stn
Job order repair for transformer
3 documents required · 3 mandatory
₹0
Exempted
1 Feb 2021
9 Jan 2021
19 Jan 2021
10 Jan 2021
18 Jan 2021
10 Jan 2021
Amount
Isolating 11 KV HT over head supply from the substation and earth the complete system properly, disconnecting complete electric system of the transformer from HT and LT side including earthling strips, removing transformer and taking out from substation or taking down from 2/4 pole structure and transporting to authorized service center/ work shop for repair and back to the installation after repair including installing , commissioning & testing of the following capacity:- (a) 400 KVA
Draining out the complete transformer oil and keeping in safe custody in clean and dry containers for reuse. Opening the top cover of the transformer , disconnecting and taking out complete core assy and dismantling it for checking the serviceability of the coil winding, checking the condition of the body, cleaning the tank and remove sludge/dirt, cleaning the coils limbs, re-fixing of core, core assy , tap changer assembly ,HT/LT winding connection , terminal studs of HT/LT sides and reassembling of transformer after repairs, refitting the transformer coil including improvement of Insulation Resistance value within desired level by heating or any other method to required level complete all as directed to the entire satisfaction of Engr-in-Charge:- (a) 400 KVA
Supply only primary (HV side) double paper cover copper winded coils of existing type size and gauge and in weight complete with including11000 volt grade insulating material for transformer of 400 KVA
Description same as per srl item No 3 here in before but LV size 415 voltage graded.
Supply & pouring of fresh transformer oil in transformers for topping up the level or replacement complete all as directed by Engineer-in-Charge. (Transformer oil shall confirm to relevant IS -335 and dielectric strength of 45 KV and getting it tested before and after filling complete
Material & labour for dehydration and filtration of transformer oil of exiting transformer , 11/0.433 KV to obtain dielectric strength more than 40 KV at 2.5 mm gap including, testing complete all as specified and directed by Engineer-in-Charge.
Supply only , HV bushing (11000 voltage graded) with heat resistance gasket suitable for following capacity of outdoor/ indoor type transformer:- (a) 400 KVA
Supply only LV bushing (415 voltage grae) with heat resistance gasket suitable for following cap of outdoor/indoor type transformer:- (a) 400 KVA
AMAN ENTERPRISES
SAINI ELECTRIC STORE
KUNAL ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_459199.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .