Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrQualified 72 MIDC CROSS ROAD C ANDHERI E MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹5.0 Cr | L1 | Qualified MII |
| 2 | L2₹5.0 Cr+₹62,000.40 (0.12%)Qualified 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | ₹5.0 Cr+₹62,000.40 (0.12%) | L2 | Qualified MII |
| 3 | L3₹6.1 Cr+₹1.1 Cr (22.0%)Qualified KHANAPUR ROAD BELGAUM KHANAPUR ROAD UDYAMBAG BELGAUM BELGAUM KARNATAKA 590008 | BELAGAVI | KARNATAKA | 590008 | ₹6.1 Cr+₹1.1 Cr (22.0%) | L3 | Qualified MSE, MII, Category: General |
| 4 | Disqualified KHASRA NO 320 RAKESH KATARIA ATOR ROAD GHAZIABAD VILLAGE GARHI ATOR ROAD NEAR RKGIT COLLEGE GHAZIABAD UTTAR PRADESH 201001 NEAR RKGIT COLLEGE | GHAZIABAD | UTTAR PRADESH | 201001 | - | - | Disqualified MSE |
Tender Value
Refer Docs
EMD Value
₹15.9 L
Closing Date
18 Jul 2023, 9:00 amClosed
HYDRAULIC WHEEL PRESS MACHINE CAPACITY 500T
4920510
GEM/2023/B/3589394
Two Packet Bid
Supply cost of HYDRAULIC WHEEL PRESS MACHINE,Accessories and other Essential Items,Toolings,Packing
2 days
Unknown (Unspecified Location)
Total value wise evaluation
BOQ
8 documents required · 8 mandatory
₹3
₹15.9 L
20 Nov 2023
19 Jun 2023
18 Jul 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Supply cost of HYDRAULIC WHEEL PRESS MACHINE | Supply cost of HYDRAULIC WHEEL PRESS MACHINE CAPACITY 500T | 2 | Turnkey | binodpaswan.ofb | 300 |
| 2 | Accessories and other Essential Items | Cost of all Accessories & other Essential Items for P&M | 2 | Turnkey | binodpaswan.ofb | 300 |
| 3 | Toolings | Cost of all Tooling as per Scope | 2 | Turnkey | binodpaswan.ofb | 300 |
| 4 | Packing and forwarding | Cost of Packing & forwarding for supply of P&M , Accessories etc | 2 | Turnkey | binodpaswan.ofb | 300 |
| 5 | Freight and Insurance | Cost of Freight & Insurance for supply of P&M , Accessories etc. | 2 | Turnkey | binodpaswan.ofb | 300 |
| 6 | Civil Work | Cost of Civil Works required for installation of P&M | 2 | Turnkey | binodpaswan.ofb | 300 |
| 7 | Erection Commissioning and Testing | Cost of Erection , Commissioning, Inspection & Testing of P&M | 2 | Turnkey | binodpaswan.ofb | 390 |
| 8 | Training | Cost of Training of P&M | 2 | Turnkey | binodpaswan.ofb | 390 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4920510.pdf
GEM_BID
tech-spec-hw_2023-06-19-17-51-13_62c63d4faa0a60450717e8a1d565691d.pdf
BOQ
boq-hw_2023-06-19-17-51-13_c1a5e9121466a9ae4396a8a83dad9dfb.csv
BOQ
ATTACHME_498ab75a-a924-42f5-a0641687178189564_msfeopm.docx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .