Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-In this tender, by mistake the bidder has uploaded the Licence of another Contractor. Hence this tender is rejected. |
Tender Value
₹2.5 L
EMD Value
₹6,340
Closing Date
14 Sept 2026, 11:00 amClosed
Assistant Executive Engineer
PWD Special Buildings Sub Division Painavu Idukki
GENERAL-Maintenance works in ITI Kanijikuzhy-Maintenance works in campus compound-General Civil Work
2026_PWD_860092_3
E08/AEE/SB/2026-27
Open Tender
Civil Works - Buildings
Item Rate
60 days
Painavu
Please refer Tender documents.
10 documents required · 10 mandatory
₹560
Yes
₹6,340
Yes
18 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 2.1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.2 | cum | - | - |
| 1.003 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 200 | kilogram | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.91 | cum | - | - |
| 1.005 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 80 | kg | - | - |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 11.34 | sqm | - | - |
| 1.007 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 12.06 | sqm | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.2 | sqm | - | - |
| 1.009 | OD61052/2026-2027: Dry rubble masonry with hard stone in all wok including cost of through stone and conveyance etc. | 1.08 | cum | - | - |
stage.html
html • 0.02 MB
finance_1469587.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT.pdf
Other Document • 0.02 MB
BOQ_1469587.xls
BOQ • 0.31 MB
BID.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .