Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹8,000
Closing Date
9 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER SALINITY CONTROL DIVISION Jam-Khambhalia
Repairing of earthen dam of Vartu-2 Irrigation scheme under SSJA -2026
291420
short term Tender Notice No. 27 of 2025-26
Open
Civil - All
Devbhumi Dwarka
4 documents required · 4 mandatory
₹900
Yes
Executive engineer, salinity control division jam-khambhaliya
₹8,000
Yes
30 Mar 2026
30 Mar 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
Name of work :- VARTU-2 IRRIGATION SCHEME.
Repairing of earthen dam of Vartu-2 Irrigation scheme under SSJA -2026
Bill of Quantities
Item No. Quantities Item of Work Estimated Rate Unit Total Amount
Item No. Quantities Item of Work Estimated Rate Unit Total Amount
estimated In Figure In Words according to
but may be in Rs. estimated
Providing murrum including spreading the same and dressing the side slope & top surface in required One Hundred Sixty
grade and camber with lead upto 1 km etc complete. Six Only
I am/we are willing to carry out the work at % below/above percent (Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under:
Estimated Amount Put to Tender RS. 784350 Estimated Amount Put to Tender RS.
Deduct ______% Below RS. _________________ Deduct ______% Below RS. _________
Net RS. Net RS.
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e.1% of the work done
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: MIS102010/17/K-1 Dt.30/07/2018 as stated in S.O.R. therefore
(4) in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies except GST payable by the contractor under the contractThe labour
cess will be deducted as per prevailing rules i.e.1% of the work done
Sign. Of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD 97 3 m.pdf
TECHNICAL specification (2).pdf
sche B.pdf
Download all tender documents and submit your bid