Loading…
Loading…
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
11 Aug 2026, 5:00 pm
CCE R.W.CIRCLE, BALASORE
RURAL WORKS CIRCLE , BALASORE
Construction of flood resilient road from New State Highway Kashipur Chhak via Ichhapur Kantia Chandi Chhak, Ichhapur Kapili Bridge, Kantia Sasan to Bagada and Mangalapadia Hasinpur road
2026_CERWI_137319_1
NCB 06 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Bhadrak
4 documents required · 4 mandatory
₹10,000
₹3.9 L
Yes
11 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
29 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m etc.complete and as per specification and direction of Engineer -in –charge. | 2,052.75 | Cum | 61.81 | ₹1,26,880.48 |
| 2 | Earth work excavation in foundation in all knds of soil within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site. | 1,867.17 | Cum | 388.8 | ₹7,25,955.7 |
| 3 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 56.06 | Cum | 929.05 | ₹52,082.54 |
| 4 | Providing and fixing Z type steel sheet piles including cost, carriage & labour for driving etc. complete as per specification & direction of Engineer in charge. | 509.1 | Sqm | 9,977.68 | ₹50,79,636.89 |
| 5 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge . | - | - | - | - |
| 6 | In Foundation | 84.71 | Cum | 6,786.52 | ₹5,74,886.11 |
| 7 | Below Approach Slab | 37.46 | Cum | 6,709.25 | ₹2,51,328.51 |
| 8 | PCC M-15 grade bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) including cost conveyance etc required as directed by Engineer-in-charge. | - | - | - | - |
| 9 | In Sub-Structure | 537.13 | Cum | 6,325.82 | ₹33,97,787.7 |
| 10 | In Foundation | 21.9 | Cum | 6,183.78 | ₹1,35,424.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.99 MB
Tendernotice_3.pdf
PDF • 0.60 MB
Tendernotice_1.pdf
PDF • 3.47 MB
BOQ_603626.xls
BOQ • 0.34 MB
3257.pdf
PDF • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].