Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹5.3 L (3.74%)Admitted-Finance BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | ₹1.5 Cr+₹5.3 L (3.74%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹6.1 L (4.30%)Admitted-Finance | ₹1.5 Cr+₹6.1 L (4.30%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sandeep Kumar L2 | Kuldeep Sood Govt. Contr. L3 | BDSconstruction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and then disposing of surplus excavated soil as directed, within lead of 50 m and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 1,407.32 | Cum | 265 ₹3,72,939.8 Lowest | 300 ₹4,22,196 | 290 ₹4,08,122.8 |
| 2.00 | Boulder filling dry hand packed tightly as in wire crate apron bund ( wire crate to be measured separately) complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 2.25 | Cum | 1,640 ₹3,690 Lowest | 2,000 ₹4,500 | 3,500 ₹7,875 |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form work for : | ||||||
| 3.01 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 1,153.46 | Sqm | 225 ₹2,59,528.5 | 300 ₹3,46,038 | 190 ₹2,19,157.4 Lowest |
| 3.02 | Edges of slabs and breaks in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 753.4 | Rmt | 112 ₹84,380.8 Lowest | 150 ₹1,13,010 | 170 ₹1,28,078 |
| 3.03 | Suspended floors, roofs, landing, balconies and access platform, complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 103.32 | Sqm | 215 ₹22,213.8 | 150 ₹15,498 Lowest | 170 ₹17,564.4 |
| 3.04 | Foundation, footing, bases of column etc, for mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 129.91 | Sqm | 215 ₹27,930.65 | 300 ₹38,973 | 150 ₹19,486.5 Lowest |
| 4.00Extra Allowance for formwork in concrete lining in: | ||||||
| 4.01 | Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 282.1 | Cum | 385 ₹1,08,608.5 | 240 ₹67,704 | 210 ₹59,241 Lowest |
| 4.02 | In Sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 354.6 | Cum | 385 ₹1,36,521 | 240 ₹85,104 | 225 ₹79,785 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.6 L
Closing Date
11 Dec 2023, 5:00 pmClosed
District Project Manager HPCDP JICA ODA
District Project Management Unit HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
C/o Flow Irrigation Scheme Nayi Kuhal at G.P. Bagadu, Tehsil Shahpur District-Kangra (H.P.)
2023_HPCDP_82044_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022-Vol-I-1753
Open Tender
Civil Works
Item Rate
365 days
Bagadu, Tehsil Shahpur District-Kangra (H.P.)
Please refer Tender documents.
15 documents required · 15 mandatory
₹2,000
District Project Manager HPCDP JICA ODA
₹1.6 L
District Project Management Unit HPCDP JICA ODA
26 Dec 2023
30 Nov 2023
12 Dec 2023
30 Nov 2023
11 Dec 2023
30 Nov 2023
4 Dec 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and then disposing of surplus excavated soil as directed, within lead of 50 m and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Boulder filling dry hand packed tightly as in wire crate apron bund ( wire crate to be measured separately) complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for :
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Edges of slabs and breaks in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Suspended floors, roofs, landing, balconies and access platform, complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Foundation, footing, bases of column etc, for mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Extra Allowance for formwork in concrete lining in:
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
In Sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete 1:3:6 (1 Cement:3 coarse sand : 6 graded stone aggregate 40 mm nominal size) of specified grade excluding the cost of centring and shuttering all work upto plinth level and complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing cement concrete lining 15 cm thick or less for irrigation channels, using cement concrete 1:2:4 (1 cement2 sand :4 stone aggregate 20 mm nominal size) in:
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Side Slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In retaining wall, return walls, walls including attached pilasters, columns, piers, abutment, pillars, posts, struts, buttress, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plainwindow sills, fillets, sunken floor etc, upto floor five level, excluding the cost of centering, shuttering and finishing
Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in :
All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In beams, suspended floors, roofs,balconies, shelves, chajjas, lintels, bands, plian window sills, staircases and spiral stair cases above plinth level upto floor 5 level, excludinf cost of centering, shuttering, finishing and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Cement cencrete flooring 1:2:4 (1 cement :2 sand :4 stone aggregate) finished with a floating coat of neat cement , including cement slurry, but excluding the cost of nosing of steps etc complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
20 mm cement plaster of mix1:4 (1cement: 4 Coarse sand) complete in all respect within all leads and lifts and complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying trenches HDPE pipes of following diameters and classes as per IS 4984, PE-100 and jointing the pipes through push type compression joints by hydraulically operated machines upto 90mm diametre and butt fussion above 90mm diametre i/c neccessary fitting, bends, tees, and reducers fabricated in accordance with provided as per site conditions. Flagign of pipes shall be made as and where required confirming of code IS 8008 and IS 7634, stub ends will be welded on pipes and MS flanges shall be provided with slip on covered by epoxy coating / plastic powder. the flange should be confirm to ANSI B 16.5 with necessary nuts and Bolts. jointing shall be complete in all respects i/e testing at site upto entire satisfaction of enginner - in - charge
Weep hole in retaining wall 90mm dia HDPE pipes
Providing and making gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh gabion boxes as per IS:16014:2012, MORTH Clause 2500,. Of required size, mesh type 10x12 (D-100 mm with tolerance of ± 2% ) Zinc+PVC coated,Mesh wire diametre 2.7/3.5 mm, mechanically edged/ selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per metre of mesh perpendicular to twist, tying with lacing wire of diametre 2.2/3.2, supplied @ 3% by weight of gabion boxes, filled with boulders with dimensions of 200 mm, as per drawing, all complete as per direction of engineer- in - charge
Providing, laying, jointing and testing in trenches (to level or grade) GMS tube ( IS : 1239-2004) of 150 mm dia, & medium Class conforming to IS specification capable to withstand the required hydraulic test pressure as per IS code in random length of 6.00 mtrs. complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. (EARTH WORK IN TRENCHES TO BE MEASURED PAID FOR SEPARATELY)
Providing and Fixing CI Sluice Valve 150 mm ø PN-1.00 10.20 Kg/cm² Kartar make i/c MS Flange of Table as per IS 6392-1971 of 5 WT of 71.30 Kg & Welding of MS Flanges in two layers on both faces and & i/c carriages in all respects within all leads & lifts complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge..
Sandeep Kumar
Kuldeep Sood Govt. Contr.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_121993.xls
BOQ • 0.25 MB
BIDDOCUMENTNayiKuhal.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .