Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹24.9 LAccepted-Finance | 1st | Accepted-Finance L1 | |
| 2 | 2nd₹25.3 L+₹38,607.24 (1.55%)Rejected-Finance | 2nd | Rejected-Finance L2 | |
| 3 | Rejected-Technical 00 RANCHI ARGORA HOUSING COLONY BYEPASS ARGORA ROAD NEAR M 10 VILLAGE TOWN ARGORA CITY RANCHI RANCHI JHARKHAND 834002 INDIA | RANCHI | JHARKHAND | 834002 | - | Rejected-Technical Documents not as per BID | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents not as per BID | |
| 5 | Rejected-Technical 2ND FLOOR UNIT NO 1 2 PODDAR PLAZA BLOCK NO C2 C4 NEW SIYAGANJ INDORE INDORE INDORE MADHYA PRADESH 452001 | INDORE | MADHYA PRADESH | 452001 | - | Rejected-Technical Documents not as per BID |
Tender Value
₹25.7 L
EMD Value
₹64,134
Closing Date
4 May 2022, 2:00 pmClosed
DE NWO CNTXE Dumka
New Telephone Exchange Building , Masaliya Road , Dudhani, Dumka 814101
E Tender FOR MAINTENANCE OF OPTICAL FIBER CABLE ROUTES UNDER THE JURISDICTION OF DUMKA OFC DIVISION OF CORE NETWORK TX EAST RANCHI SUB REGION
2022_BSNL_113022_1
DE(TX) /CNTx-E/ DMK /E-Tender/ 2022-23 / 01
Open Tender
Repair and Maintenance Services
Works
365 days
As per BID Document
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
Accounts Officer (Cash), o/o DGM (M), ETR, Ranchi
₹64,134
Yes
2 Dec 2022
13 Apr 2022
5 May 2022
13 Apr 2022
4 May 2022
13 Apr 2022
Amount
SLA based Outsourcing
OFC based route maintenance work (SLA) including round the clock route-patrolling, jointing of interrupted cable, if required inserting additional cable between two ends(preferably by doing underground and in extreme case by overhead). End to end optical power budget has to be kept within limit, for the same, if required, damaged / lossy section of OFC has to be replaced by new cable. All material (except BSNL Supply) and labour should be supplied by the contractor including operating tools / instruments (such as splicing machine) and measuring meters (such as OTDR, Power-Meters) etc. Transportation of these materials and lying of OFC is the responsibility of the contractor. Furnishing of detail reports of route and splice loss measurement with OTDR may be submitted.
KAMAL KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .