Additional City Engineer
ANNUAL RATE CONTRACT FOR REPAIRING AND MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN CENTRAL ZONE (SOUTH).
334661
ACE/CZ/05/2026-2027,Work No. 04
Open
Repair and Maintenance
Works
Surat
3 documents required · 3 mandatory
₹2,832
Commissioner, Surat Municipal Corporation
₹57,000
13 Aug 2026
13 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
NAME OF WORK: ANNUAL RATE CONTRACT FOR REPAIRING AND
MAINTAINANCE WORK IN VARIOUS MUNICIPAL
SCHOOL BUILDINGS IN CENTRAL ZONE (SOUTH).
E-Tender (On Line) Notice No.ACE/CZ/05/2026-2027
VOLUME-I: TECHNICAL BID
Start date of download of tender : From Dt. 13/08/2026 to 24/08/2026, upto 17:00
documents from website smc.nprocure.com hrs.
Last date of submission of online tender : On or Before Dt. 24/08/2026 upto 18.00 hrs
(tender fees, EMD and other documents in
Last date of submission of tender fees, : On or Before Dt. 05/09/2026up to 17.00 hrs. in
EMD and other documents in hard copy sealed envelop by R.P.A.D./ Speed Post to
Chief Accountant, SMC, TAPIPURA, Surat-
Opening of Tender Fee, EMD & Other : On Dt. 07/09/2026(Probable)
Documents etc. in Hard Copy
Estimated amount : Rs. 56,79,379.67 + GST
Earnest money deposit. : Rs. 57,000/-
Document fees : Rs. 2832/-
Registratiion class : “D Class & Above.”
TENDER TO BE SUBMITTED TO:
THE CHIEF ACCOUNTANT,
SURAT MUNICIPAL CORPORATION, TAPIPURA
SURAT MUNICIPAL CORPORATION
TENDER DOCUMENT
SR. PARTICULARS PAGE NO.
1. NOTICE INVITING TENDER
INFORMATION TO TENDERER
STATEMENT-A (Performa for list of works of similar nature already completed by the Tenderer during
STATEMENT-B (Performa for declaration regarding work on hand with the tenderer.)
ANNEXURE-A (AFFIDAVIT)
ANTI-BLACKLISTING CERTIFICATE
DECLARATION FORM
2. CONTRACTOR TO PLEASE READ THIS CAREFULLY
3. INSTRUCTION TO TENDERER
4. GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE FOR CONTRACTOR
5. GENERAL CONDITIONS OF CONTRACT
8. CONDITION FOR THE WATER SUPPLY AND ELECTRIC SUPPLY
9. IMPORTANT INSTRUCTION-A TO THE CONTRACTOR
10. SPECIAL NOTE
11. SPECIAL CONDITION OF CONTRACT
12. IMPORTANT INSTRUCTION-B TO THE CONTRACTOR
13. DETAILED SPECIFICATION OF MATERIALS
14. GENERAL TECHNICAL SPECIFICATION FOR THE BUILDING WORKS
15. SCHEDULE FOR TESTING OF MATERIALS
16. ITEMWISE DETAILED TECHNICAL SPECIFICATIONS
17. APPROVED VENDOR LIST
18. COVERING LETTER
SURAT MUNICIPAL CORPORATION
1.0 NOTICE INVITING TENDER
(A) RECEIPT AND OPENING OF TENDER:
Online Tenders will be received from the established and reliable contractors on or before
hours from Dt.13/08/2026 to 24/08/2026 up to 17.00 hrs. on website smc.nprocure.com. The
tender received after due time and date specified will not be accepted.
NAME OF WORK: ANNUAL RATE CONTRACT FOR REPAIRING AND
MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN
CENTRAL ZONE(SOUTH)
1. ESTIMATED COST : Rs. 56,79,379.67 + GST
2. EARNEST MONEY DEPOSIT : Rs.
3. TIME LIMIT : 12 (Twelve) months (Including monsoon)
4. DOCUMENT FEE : Rs.2832.00
5. REGISTRATION REQUIRED : ‘ D & Above’ Class
(C) OPENING OF TENDERS:
The tenders will be opened online in presence of bidders and opening authority subject to receipt
of Tender Fees & EMD & ANNEXURE- A (Affidavit) in hard copy in account department
(Main Office). But tenderer has to upload relevant documents as required /mentioned in the
technical bid in Soft Copy (By Scanning) .The tenders will be opened in two stages i.e.
Technical Bid and Commercial Bid.
(D) PURCHASE OF TENDER DOCUMENTS:
Tender Documents can be downloaded from smc.nprocure.com from Dt.13/08/2026 to
Tender documents fees of Rs.2832.00 (including CGST 9% + SGST 9%) per set which is
required for submission of tender towards the cost of tender documents in cash, pay order or by
demand draft of any nationalized bank, in favour of "The Commissioner, Surat Municipal
Corporation" payable at Surat and shall be submitted alongwith EMD and other documents. The
cost of the Tender Documents will not be refunded in any circumstances. The Surat Municipal
Corporation shall not be liable for any postal delay in any case.
E.M.D & Tender Fee shall be submitted in electronic format only through online (by
scanning) while uploading the bid. This submission shall mean that E.M.D and tender fee
are received for purpose of opening the bid. Accordingly, offer/tenders of those tenderers
who’s E.M.D & tender fee is received electronically, shall be opened. However, for the
purpose of realization of EMD and Tender fee ,bidder shall send the EMD as well as
Tender fee in required format in original through RPAD/Speed post so as to reach to
Account Department (Main office) within stipulated date as mentioned in tender notice for
the submission of tender FEE & E.M.D .Punitive action shall be initiated for non-
submission of EMD & Tender fees in original to Account Department (Main Office)by
bidder including abeyance of registration and cancellation of E – tendering code for SIX
MONTHS. All documents in supporting of bid shall be in electronic format only through
online (by Scanning) during the bidding period & hard copy will not be accepted
All documents must be coloured scanned to be seen as original. Scanning in black and white
or gray shall Not be acceptable.
All the documents must be notarized with clearly displaying stamp, number and name of the
(E) CONTRACT PERIOD:
The total contract period is hereby fixed as 12 (Twelve) months (Including monsoon) from the
10th Day of issuance of work order.
(F) Tenderer must comply with and agree to all instructions & requirements in the Notice and in the
Instructions to Tenderers, including requirements in the Contract Documents.
(a) All tenders must be submitted in the prescribed Tender form.
(b) Each Tender must be accompanied by the completion Schedule.
(c) Each tender must be accompanied by the Tender Security (EMD) Rs. 57,000.00/-as
specified in IT-07.
(d) The successful tenderer shall execute the Contract Agreement within fifteen days after
the date of Notice of award.
(e) The successful Tenderer will be required to furnish a performance bond (Security
Deposit) of and amount equal to (2%) Two percent of the tendered amount. As per clause
(f) The successful Tenderer shall furnish insurance in accordance with the contract
(g) The Surat Municipal Corporation may withhold issuance of the Notice of proceed for a
period not exceeding fifteen days after the date of execution of the contract agreement.
(h) The tender and tender guarantee bond (Earnest Money Deposit) shall be submitted by
the Agency in whose name tender has been issued. Transfer of tender documents to any
other party is prohibited.
(i) All intending tenderers will have to purchase digital signatures in order to participate in
the online bidding process.
(j) All the applicant contractors are required to have their own employers code
number under EPF Act, 1952 and are required to comply the applicable provisions
of said statute regularly and totally.
(k) Further the contractors for services are required to produce the certified copies of
paid challans in respect of employees/workers employed by said contractor in
respect of work allotted by Surat Municipal Corporation, along with copies of Pay
Roll and Muster Roll. If the same are not produced, the bills will not be released.
(G) RECEIPT OF TENDER DOCUMENTS:
The following details are to be submitted online on smc.nprocure.com :
a. Document fees and EMD Details
b. Commercial Bid
c. Statement A to B along with all necessary supporting documents
d. Bank solvency
e.Ternover Certificate and Income-Tax clearance certificate.
g. GST Registration & P.F. Registration
h. Power of attorney
i. Partnership deed in case of Partnership firm.
j. Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
k. Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
l. Addenda-Corrigendum (if any) duly signed by Contractor
The following details shall be submitted in hard copy at prescribed address :
a. Tender fees in prescribed format
b. Earnest Money Deposit in prescribed format
c. Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
d. Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
e.Addenda-Corrigendum (if any) duly signed by Contractor.
f. Other necessary documents mentioned in Technical Bid (if any)
Please note that commercial bid shall not be submitted in hard copy under any
circumstances. This will hold the tender liable for rejection.
(H) Tender Validity Period:
The validity period of the tender submitted for this work shall be of one hundred twenty (120)
calendar days from date of opening of the price bid for this work and the Tenderer shall not be
allowed to withdraw or modify the tender offer on his own during the validity period.
(I) Rights Reserved:
Without assigning any reason, The Surat Municipal Corporation reserves the right to reject the
lowest or any other or all tenders or part of its. To waive any informality or irregularity in any
tender, which in the opinion of the Surat Municipal Corporation does not appear to be in its best
interest and the tenderer shall have no cause of action or claim against the Surat Municipal
Corporation or its officers, employee, successors or assigners for rejection of this tender.
The Surat Municipal Corporation further reserves the right to withhold issuance of the notice to
proceed, after execution of the contract agreement by the successful Tenderer. The Surat
Municipal Corporation is not obliged to give reasons for any such action.
During Tender validity period, if any Tenderer withdraws or makes any modifications or
additions in the terms and conditions on his own in this tender, then The Surat Municipal
Corporation shall without prejudice to any right or remedy be at liberty to reject the tender and
forfeit the Earnest Money Deposit in full. Such Tenderer may be disqualified from tendering for
further works under the jurisdiction of The Surat Municipal Corporation.
The Surat Municipal Corporation reserves the right to increase or decrease the scope of work and
split the tender in two or more parts without assigning any reason even after the award of
EXECUTIVE ENGINEER
SIGNATURE OF CONTRACTOR SURAT MUNICIPAL CORPORATION
2.0 INFORMATION TO TENDERER:
[1] Tender validity period 120 days (One hundred & Twenty days) from the date of
opening of price bid
[2] Earnest Money Deposit RS. 57,000.00 as per IT-07
[3] Security Deposit 2% of Tender value after issuing Work Order & 2% from
the running bills.
[4] Time of Completion 12 (Twelve) months (Including monsoon)
[5] Period of liability for work. 12 (Twelve Months) from the date of issuing final
completion certificate.
[6] Penalty for delay Zero Point two percent (0.20 %) of the contract price per
day maximum up to ten percent of the contract price.
[7] Retention Money Deposit 5.00% (Five percent) of work done and to be deducted
from R.A. bill as per GC-37.
[8] Work Order Main work order shall be for work after approval form
[9] Date of download of tender Between Dt.13/08/2026 to 24/08/2026 up to
hrs from smc.nprocure.com
[10] Last date of submission of On or before Dt. 24/08/2026 up to 18.00 hrs.
[11] Last date of submission of On or before Dt. 05/09/2026 up to 17.00 hrs.
Tender fees, EMD and
Necessary Documents,
Certificates etc. in Hard
EXECUTIVE ENGINEER,
SIGNATURE OF CONTRACTOR SURAT MUNICIPAL CORPORATION
SURAT MUNICIPAL CORPORATION
Statement showing the similar works completed in the last seven years, i.e. for a period starting
Sr. Name Na Esti Tend Dat Target date Actu Time limit Perce Reaso Rem
No of me mate ered e of of al in year and ntage ns for arks
. Depar of d Amo awa completion Amo months rate delay
tment wo cost unt rd of work as unt and in
/ rk of of per of amou comp
Client work cont contract wor nt of letion
with put ract and date of k Penal of
Addre to completion com ty work
ss tend of work if plet
Tar Comp d Orig Exte
get letion inal nded
Signature of contractor
Statement showing the similar works on hand / in progress.
Sr. Name Na Estim Tend Date Target date Actu Time limit in Reaso Rem
No. of me ated ered of of al year and ns for arks
Depart of cost Amou awar completion Amo months delay
ment / wo of nt d of of work as unt in
Client rk work cont per of compl
with put to ract contract wor etion
Addres tende and date of k of
s r completion done work
Tar % Origi Exten
get Prog nal Y ded
Signature of the contractor
NAME OF WORK: ANNUAL RATE CONTRACT FOR REPAIRING AND
MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN
CENTRAL ZONE (SOUTH)
1.0 I, the undersigned, do hereby certify that all the statements made in the required attachments are true
and correct. I also understand that in case of wrongful/false information, corporation is entitled to
take any civil & criminal punitive action against me/us.
2.0 The undersigned also hereby certifies that neither our firm M/s _________
_____________________ nor any of its constituent partners have abandoned any work in India nor
any contract awarded to us for such works has been rescinded during last five years, prior to the date
3.0 The undersigned hereby authorize(s) and request(s) any bank, person, authorities, government or
public limited institutions, firm or corporation to furnish pertinent information deemed necessary and
requested by the SMC to verify our statements or our competence and general reputation.
4.0 The undersigned understands and agrees that further qualifying information may be requested, and
agrees to furnish any such information at the request of the SMC.
5.0 The SMC and its authorised representatives are hereby authorised to conduct any inquiries or
investigations to verify the statements, documents, and information submitted in connection with this
application and to seek clarification from our bankers and clients regarding any financial and
technical aspects. This Affidavit will also serve as authorisation to any individual or authorised
representative of any institution referred to in the supporting information, to provide such
information deemed necessary and requested by yourselves to verify statements and information
provided in the Tender or with regard to the resources, experience and competence of the Applicant.
Signed by the authorised signatory of the firm
Title of the office
Name of the firm
It is mandatory to submit the above Affidavit through online (by scanning) and in hard copy.
*Note:- To be given on Non-judicial stamp paper of Rs 300/- duly signed by the authorized notary.
ANTI-BLACKLISTING CERTIFICATE
(on Non Judicial Stamp Paper of Rs.300/-)
(To be provided by Bidder)
I M/s. _______________ (Name of the Bidder along with name and address of registered office) hereby
certify and confirm that we or any of our promoter/s/ director/s are not barred by Government of Gujarat (GoG)/ any
other entity of GoG or blacklisted by any state government or central government/ department/ agency/local self
Government/Surat Municipal Corporation in India from participating in Project/s, either individually or as member
of a Consortium as on _______ (Bid Submission Date).
We further confirm that we are aware that our Bid for the captioned Project would be liable for rejection in case any
material misrepresentation is made or discovered with regard to the requirements of this Tender at any stage of the
Bidding Process or thereafter during the agreement period. Dated this ____ day of ___________
To be signed by:
Authorised Signatory with name & designation
Name of the Bidder
DECLARATION FORM
(1) I/We hereby declare that I/We have visited the site and fully acquainted myself/ourselves with
the local situation regarding materials, labour and other factors pertaining to the work before
submitting this tender.
(2) I/We hereby declare that I/We have carefully studied the conditions of contract, specifications and
other tender documents of this work and agree to execute the same accordingly.
EXECUTIVE ENGINEER
SURAT MUNICIPAL CORPORATION
Contractor Signature with
Seal & Address:
E.M.D. & Tender fee shall be submitted in electronic format only through online (by scanning)
while uploading the bid. This submission shall mean that E.M.D. & Tender fee are received for
purpose of opening the bid. Accordingly, offer /tenders of those tenderers whose E.M.D. & tender
fee is receive electronically, shall be opened. However, for the purpose of realization of EMD and
Tender fee, bidder shall send the EMD as well as Tender fee in required format in original through
RPAD/Speed post so as to reach to Account Department (Main office) within 7 days from the last
date of submission of price bid. Punitive action shall be initiated for non submission of EMD &
Tender fees in original to Account Department (Main Office) by bidder including abeyance of
registration and cancellation of E-tendering code for one year. All documents in supporting of bid
shall be in electronic format only thorough online (by scanning) during the budding period & hard
copy will not be accepted separately.
All documents must be coloured scanned to be seen as original, Scanning in black and white or gray
shall not be acceptable.
All the documents must be notarized with clearly displaying stamp, number and name of the notary.
"Following Documents shall be submitted in HARD COPY to Surat Municipal Corporation by all
Earnest Money Deposit as mentioned in the tender. (i.e. D.D./Pay Order)
Tender Fees as mentioned in the tender.
Affidavit on Non Judicial Stamp Paper of Rs.300/-
Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
Addenda-Corrigendum (if any) duly signed by Contractor.
Other necessary documents mentioned in Technical Bid (if any)
SURAT MUNICIPAL CORPORATION
CONTRACTOR TO PLEASE READ THIS CAREFULLY
(1) If the tender is taken in favour of the company, a copy of attorney in favour of the person who
may have signed the tender for the company, must accompany the tender.
(2) Solvency certificate of current year Bank or a Revenue Officer of an amount upto 20% of the
tender cost plus works on the hand still to be executed will have to be produced by the contractor.
(3) Voucher for earnest money must accompany the tender. Tenderer may pay earnest money in form
of a crossed demand draft of a local Bank drawn in favour of the Municipal Commissioner.
Earnest Money by cheque shall not be accepted.
(4) The contractor shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment No. and Ward under he is which assessed
(5) Copies of certificate as regards previous experience of Govt. or Semi Govt. Dept., if any
must accompany the tender. An attested copy of registration with MES, Various
department of State Govt., Surat Municipal Corporation, CPWD etc.
(6) Declaration showing all works on hand with the contractor and the value of works that remains to
be executed in each case must accompany the tender.
(7) All pages of Schedule: `A & B' & specification should be initiated by the contractor.
(8) All corrections, erasures & over writing should be initialed by the contractor.
(9) Discrepancies and adjustment of errors:-Any error in quantity or amount in Schedule-`B' showing
item of words to be carried out shall be adjusted in accordance with the following rules:-
(a) In the event of a discrepancy between description in works and figures quoted by a tenderer in the
`rates' column, the descriptions in words shall prevail.
(b) In the event of an error occurring in the amount column of the Schedule- `B' showing items of
works as a result of wrong multiplication of the unit rate and quantity, the units rate shall be
regarded as firm and multiplication shall be amended on the basis of the rate.
(c) All the errors in totaling in amount column and in carrying forwarded total shall be corrected.
(d) Any rounding of amounts against item' or in totals’ shall be ignored.
The tendered sum so altered shall, for the purpose of the tenders, be substituted for the sum
originally tendered and considered for acceptance.
(10) (i) It may please be noted that the tender shall be considered as invalid specially, if the
requirements as per instruction No.1 to 9 above are not complied with before submitting the
tender. Also please read carefully the face sheet and "General Rules and Direction for the
guidance of contractor" of his form.
(ii)Right is reserved to reject any or all tender (s) without assigning any person (s) thereof.
(11) In addition to the above the tender will also b e liable to rejected outright if :-
(i) The tenderer proposes any alteration in the works specified or in the time allowed for carrying
out the work or any conditions or correction made in any code or made of Schedule-`B' or
specifications.
(ii) Any of the page or pages of the tender is removed or replaced.
(iii) All corrections, additions or pasted slips are not initialed by the tenderer.
(iv) Any erasures is made by him in the tender
(v) The tenderer or in the case of a firm, each partner or person holding the power of attorney
thereof does not signed or the signature/s is/are not attested by a witness on page-9 of the tender
in the space for the purpose.
(12) In respect of the tenders from the co-operative society, a solvency certificate of an amount
equal to 20% of the amount of the work put to tender will have to be produced alongwith the
tender or a certificate regarding the borrowing capacity if the society issued by the legal
Assistant, Directorate of Cottage Industries will have to be produced alongwith the tender.
(13) (1) The several documents forming the contract are the essential part of the contract and
requirement occurring in one is as binding as through occurring in all, they are intended to be
mutually explanatory and complementary and to described and provide for a complete work.
(2) In the event of any discrepancy, the several documents forming the contract or in any the
document, the following order or precedence should apply:-
(a) Dimension & quantities:-
(ii) Schedule-B of the tender form.
(iii) Specification.
On drawings, figures, dimensions, unless obviously incorrect will followed in preference to
sealed dimensions.
(b) Description:
(i) Schedule-B of the tender form.
(ii ) Drawings.
(iii) Specifications.
In case of defective description or ambiguity, the Engineer- in-charge should issue further
instructions direction in what manner the work is to be carried out it being understood that the
best modern practice is too followed. The contractor should forthwith comply with such
(3) The contractor should take no advantage of any apparent error or omission in drawings or
specification and the Engineer in charge shall make such corrections and interpretation as
necessary to fulfil the intent of the Plans and specifications.
(4) No withstanding that all proper precautions may have been taken by contractor at all the times
during the progress of the work, the contract shall be held responsible for all damages
whether to the work under execution or to any other property or to lives of persons during the
progress of the work and the period of maintenance.
(5) Plans are for rough guidance only when detailed plans are received from the Architect of
corporation during the course of execution the same will supersede previous plans
14. The contractor should appoint a qualified engineer and he must remain present on site during
1. The Quantity mentioned in the scheduled "B" is Tentative (indicative) for each item. Tender
have to execute the concerned work/item as per the site condition and payment shall be made
accordingly as per the actual measurement of the particular item.
16 As per Commissioner Note No.C.N.129, dtd. 9/9/2016
E.M.D & Tender Fee shall be submitted in electronic format only through online(by
scanning) while uploading the bid. this submission shall mean that E.M.D and tender fee
are received for purpose of opening the bid. Accordingly, offer/tenders of those tenderers
whose E.M.D & tender fee is received electronically, shall be opened. However, for the
purpose of realization of EMD and Tender fee ,bidder shall send the EMD as well as
Tender fee in required format in original through RPAD/Speed post so as to reach to
Account Department (Main office) within stipulated date as mentioned in tender notice for
the submission of tender FEE & E.M.D .Punitive action shall be initiated for non
submission of EMD & Tender fees in original to Account Department (Main Office)by
bidder including abeyance of registration and cancellation of E – tendering code for SIX
MONTHS. all documents in supporting of bid shall be in electronic format only through
online (by Scanning) during the bidding period & hard copy will not be accepted
All documents must be coloured scanned to be seen as original. Scanning in black and
white or gray shall
Not be acceptable.
All the documents must be notarized with clearly displaying stamp, number and name of
Conractore should have write party code on back side of DD Compulsory.
EXECUTIVE ENGINEER
SIGNATURE OF CONTRACTOR SURAT MUNICIPAL CORPORATION
INSTRUCTION TO TENDERERS
The Contract documents may be secured in accordance with the notice Inviting Tender for the
work called. The work shall include supply of materials necessary for construction of the work.
IT-02 INVITATION TO TENDER:
The Surat Municipal Corporation hereinafter referred to as the Corporation will receive tenders
for the work of ANNUAL RATE CONTRACT FOR REPAIRING AND MAINTAINANCE
WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN CENTRAL ZONE
As per the specifications in the tender documents. The tenders shall be opened in presence of
opening authority, smc in the presence of tenderers or their representatives who are present. The
Corporation reserves the right to reject the lowest or any other or all tenders or part of it which in
the opinion of the Corporation does not appear to be in its best interest, and the tenderer shall
have no cause of action or claim against the corporation or its officers, employees, successors or
assignees for rejection of his tender.
IT-03 LANGUAGE OF TENDER:
Tenders shall be submitted in English, and all information in the tender shall also be in English,
Information in any other language shall be accompanies by its translation in English. Failure to
comply with this may make the tender liable to reject.
IT-04 QUALIFICATIONS OF TENDERERS:-
(A) Tenderer shall be required to submit the enlisted documents along with E.M.D. and tender
fees in soft copy (By Scanning). EMD and Tender fee shall be submitted in hard copy also and in
prescribed form for realization. If documents are insufficient or it does not match the required
criteria mentioned below, then the Price Bid of the tenderer shall not be opened.
Mainly tenderer shall fulfill following for the pre-qualification.
(A) Tenderer shall be required to submit the enlisted documents along with E.M.D. and tender
fees online. If documents are insufficient or it does not match the required criteria mentioned
below, then the Price Bid of the tenderer shall not be opened.
Mainly tenderer shall fulfill following for pre-qualification,
(B) QUALIFYING CRITERIA OF BIDDER
Documents required for
Sr. No. Criteria
complete submission
1.1 Average Annual financial turnover during the last
Copy of certificate from
years, ending 31/03/2023, should be at least 30% of the
Chartered Accountant along with
estimated cost (i.e. 30% of 56.79 Lakh) copy of Balance sheets.
1.2 Solvency Certificate from bankers of schedule bank /
Fresh Solvency certificate from bankers of nationalized bank
schedule bank / nationalized bank. Minimum
value of solvency shall be 20% of estimated cost
of the Tender (Solvency certificate should not
be older than One year from Last date of
online Tender submission.)
(i.e. 20% of 56.79 Lakh)
2.0 Registration
2.1 Minimum “D & EXP." class” Registration Class with Registration Certificate
any government, semi government organization.
2.2 power of attorney, partnership deed or registration deed. Attested copy should be
3.0 Relevant Experience
3.1 Similar works during last 7 years.
3.1.1 Three similar completed works, each costing not less than
Attested copies of certificates
amount equal to 40% of the estimated cost put to the
from head of the office
tender(i.e. 40% of 56.79 Lakh)
concerned for completion of the
3.1.2 Two similar completed works, each costing not less the
Only Govt. or Semi Govt.
amount equal to 50% of the estimated cost put to the
Works shall be considered for
tender(i.e. 50% of 56.79 Lakh)
Similar Works(Only consider
Building Work & Building
3.1.3 One similar completed works, each costing not less the
Maintainance work etc.)
amount equal to 80% of the estimated cost put to the
tender. (i.e. 80%of 56.79 Lakh)
4.0 Other details
4.1 Black list.
The Bidders shall note that in case the Bidder is
blacklisted / stated as defaulter / barred participating in
tenders by any of government agencies / semi
government agencies or any other equivalent agencies
during last 5 years then in that case, the Bidders will be
disqualified and will not be allowed to participate in the
bidding process, though bidder satisfies all the
qualification conditions mentioned above. In this regard,
the decision of the Surat Municipal Corporation will be
final and binding to Bidder.
4.2 Works on hand & Litigation
The Bidder including any Member shall provide details
of all their on-going projects along with stage of STATEMENT-A & B
litigation, if so, against the Employer / Governments.
(a) Turnover during last 3 years, ending 31st March of previous financial year should be atleast
30% of Estimated Cost. An attested copy of annual turnover for last 3 years should be
(b) Solvency certificate from bankers of schedule bank / nationalized bank for the 20% of
tender amount. Tenderer has to submit higher amount of bank solvency if so
desired by Commissioner, SMC (Solvency certificate should not be older
than One year from Last date of online Tender submission.)
(c) An attested copy of registration with MES, Various department of State Govt., Surat
Municipal Corporation, CPWD etc.
(d) List of the works already completed in last 7 years in prescribed proforma as per
STATEMENT-A and attested copies of certificates from head of the office concerned for
completion of the works.
Following enhancement factors will be used for the cost of works executed and financial figures
to amount base for the value of the works completed in India.
Financial Year Multiplying factor
Bidder should indicate actual figures of cost and the amount for the work executed in Statement-
A without accounting for the above mentioned factors.
(e) Declaration regarding the work on hand with the tenderer should also be given in prescribed
performa as per Statement-B. Attested copies of work orders, interim certificates if any shall also
be attached as supporting documents.
(f) Attested copy of partnership deed, power of attorney etc.
(g) Attested copy of last 3(three) years IT return should be enclosed.
(i) Application Received from joint venture / consortium shall not be considered.
attested copy of partnership deed, power of attoney etc.
passport size photographs of partner / all partners on relevant page of technical bid.
Tenderer shall submit only one tender for the work put to this tender.
Tenderer shall submit the certificate of Employers code number under EPF Act.
IT-05 TENDER DOCUMENTS :
Printed and online documents and set of drawings shall comprehensively be referred to as Tender
documents. The several sections forming the documents are the essential parts of the contract
and a requirement occurring in one shall be binding as though occurring in all. They are to be
taken as mutually explanatory and describe and provide for complete works.
IT-06 EXAMINATION BY TENDERERS:
A. At his own expenses and prior to submitting his tender, each tenderer shall (a) examine the
contract Documents, (b) visit the site and determine local conditions which may affect the
work including the prevailing wages and other pertinent cost factors, (c) familiarize himself
with all CENTRAL, State and local laws, ordinance, rules, regulations and codes affecting
the material supply including the cost of permits and licenses required for the work and (d)
correlate his observations, investigations, and determinations with the requirements of the
Tender Documents.
B. The tender quantity is approximate and may increase or decrease. Any increase or decrease in
quantity will not entitle tenderer to claim any extra over the quoted rate.
C. Tender Documents be completed by legible ink, checked in a responsible manner, signed,
stamped and returned together with the Tender Security Bond by the stipulated date, which
shall form the Tender.
The Tenderer is required to complete:
(I) The form of tender, including the Appendices thereto Tender Security Bond and the
Tender summary duly signed and stamped.
All the pages in which entries are required to be made by the tenderer are contained in the
tender documents and the tenderer shall not take out or add to or amend the text of any of the
documents except in so far as may be necessary to comply with any addenda issued pursuant
to Clause IT-17 hereof
IT-07 EARNEST MONEY DEPOSIT:
A.The Tender shall be accompanied by of Earnest Money Deposit Rs. 42,000.00/- The
tenderer shall pay Earnest Money Deposit to be deposited by pay order/demand draft issued in
favour of Commissioner, Surat Municipal Corporation, Surat through Nationalised/Schedule
Bank only. The Earnest Money Deposit in the form of FDR or cheque shall not be accepted. The
tenderer shall have to mention details of Earnest Money Deposit on the seal cover of Earnest
Money Deposit. The tender received without Earnest Money Deposit shall be out rightly rejected.
Fleance Department, GR. No: EMI/4/28/22/0002/DMO
(A) Gates imund by the following banka will be accepted as SD/EMD on permanent bania:
All Nationalized Banks
(B) Guarantees issued by the following Banks will be accepted as SD/EMD for the period up to
March 31, 2023. The validity cut-off date in the OR is with respect to the date of issue of Bank
Guarantee irrespective of the date of termination of Bank Guarante
Sr. No. Name of Banks Sr. No. Name of Banks
1 Axis Bank 22 Kotak Mahindra Bank
2 AU Small Finance Bank 23 South Indian Bank
3 Bandhan Bank 24 Tamilnadu Mercantile Bank
4 City Union Bank 25 Utkarsh Small Finance bank
5 CSB Bank 26 Ahmedabad Mercantile Co.op. bank
6 DBC Bank India Limited 27 Nutan Nagrik Sahakari Bank Limited
7 DBS Bank 28 Rajkot Nagarik Sahakari Bank Limited
8 Equitas Small Finance Bank 29 Saraswat Co-operative Bank Ltd.
9 FEDERAL Bank 30 SVC Co.operative bank Ltd.
10 HDFC Bank 31 The Cosmos Co-Op Bank Ltd.
11 HSBC bank 32 The Gujarat State Co-Operative Bank
12 ICICI Bank 33 The Mehsana Urban Co-op bank Ltd
13 IDBI Bank 34 The Surat District Co-operative Bank
14 IDFC First Bank 35 The Surat Peoples Co-Operative Bank
15 Jammu and Kashmir Bank 36 The Kalupur Commercial Co.op. Bank
16 Jana Small Finance Bank 37 Baroda Gujarat Gramin Bank
17 Karnataka Bank 38 Saurashtra Gramin Bank
18 Karur Vysya Bank 39 Standard Chartered Bank
19 Baroda District Co-Operative 40 YES Bank
20 Barclays Bank 41 SBPP Co-Operative Bank LTD.
21 ESAF Small Finance Bank 42 The Panchmahal District Co-Operative
All the eligible banks are instruted to collect the original documents/papers of
guarantee from the concerned tendering authority.
B. The Earnest Money Deposit(Tender guarantee) will be forfeited in the event, the
successful tenderer fails to accept the contract and fails to submit the Performance
Guarantee Bond to the owner as stipulated in this tender documents within ten days
after receipt of notice of award of contract. In such case owner may disqualify the
tenderer from tendering for further works, under the jurisdictions of the
Corporation (S.M.C.).
C. The Earnest Money Deposit of the successful tender shall be returned after the
performance guarantee bond, as required, if furnished by the contractor.
D. No interest shall be paid by the owner on any tender guarantee.
IT-08 INCOME TAX CLEARANCE CERTIFICATE:
In view of the latest circular of IT Department IT clearance certificate is not required. However
the contractor shall give zerox copy of the PAN card.
IT-09 PREPARATION OF TENDER DOCUMENTS:
Tenderers are requested to note the following while preparing the Tender Documents:
A. Technical bid, EMD and Tender fees shall be submitted on the Tender Form bound herein in
English. All tender items and statements shall be properly filled in. Numbers shall be stated
both in words and in figures where so indicated, and signatures of all persons signing shall be
B. Technical Bid shall be accompanied by the prescribed tender security bond and other
required documents and drawings. All witnesses and sureties shall be persons of status and
probity and their full names, occupations and address shall be stated below their signatures.
All signatures in the Tender Documents shall be dated.
C. Variations to the Contract Documents requested by the tenderer may be affixed to the Tender
Document in the space available and duly signed and stamped. Such variations may be
approved or refused by the Engineer at the time of adjudications of Tenders, and in either
case the Engineer is not obliged to give reasons for his decisions.
D. Delivery of Tenders shall comply with Notice inviting tenders as to place, date and time.
E. Price Bid shall be submitted online. Tenderers are requested to quote for all parts of the
IT 10 SUBBMISSION OF TENDERER DOCUMENT:-
Technical bid and price bid are not to be submitted in physical form. Please note that non
submission of Technical Bid as well as price bid does not absolve the bidders from any
liability created from the bid condition and bidding process. Technical-Bid and Price Bid in
hard copy shall be submitted by Successful bidder upon intimation from Surat Municipal
As per Commissioner Note No.C.N.129, dtd. 9/9/2016
E.M.D & Tender Fee shall be submitted in electronic format only through online(by
scanning) while uploading the bid. This submission shall mean that E.M.D and tender fee
are received for purpose of opening the bid. Accordingly, offer/tenders of those tenderers
whose E.M.D & tender fee is received electronically, shall be opened. However, for the
purpose of realization of EMD and Tender fee ,bidder shall send the EMD as well as
Tender fee in required format in original through RPAD/Speed post so as to reach to
Account Department (Main office) within stipulated date as mentioned in tender notice for
the submission of tender FEE & E.M.D .Punitive action shall be initiated for non
submission of EMD & Tender fees in original to Account Department (Main Office)by
bidder including abeyance of registration and cancellation of E – tendering code for SIX
MONTHS. all documents in supporting of bid shall be in electronic format only through
online (by Scanning) during the bidding period & hard copy will not be accepted
All documents must be colored scanned to be seen as original. Scanning in black and white
or gray shall not be acceptable.
All the documents must be notarized with clearly displaying stamp, number and name of
Following documents shall be submitted in HARD COPY TO Surat Municipal
Earnest Money Deposit as mentioned in the Tender.
Tender Fees as mentioned in the tender
Affidavit of Annexure A on Non Judicial Stamp Paper of Rs.300/-
Anti-Blacklist Certificate on Non Judicial Stamp Paper of Rs.300/-
Addenda-Corrigendum (if any) duly signed by Contractor.
Other necessary documents mentioned in Technical Bid (if any)
All necessary documents mentioned in Technical bid (if any). shall be submitted online.
(i) COVER-1: Technical Bid
E.M.D and Tender Fees for the work of ANNUAL RATE CONTRACT FOR REPAIRING
AND MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN
CENTRAL ZONE(SOUTH)
Along with other Documents in Hard Copy upto On or Before Dt.05/09/2026up to 17.00 hrs.
Also mention the name of tenderer, address, tender notice number etc. on the cover.
Price bid for the work of of ANNUAL RATE CONTRACT FOR REPAIRING AND
MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL BUILDINGS IN
CENTRAL ZONE(SOUTH)
shall be submitted online.
The name of work to be written on cover shall be work of ANNUAL RATE CONTRACT FOR
REPAIRING AND MAINTAINANCE WORK IN VARIOUS MUNICIPAL SCHOOL
BUILDINGS IN CENTRAL ZONE(SOUTH)
Also mention the name and the address of tenderer, tender notice number on the cover and to be
submitted to the Chief Accountant, Surat Municipal Corporation, TAPIPURA, Surat –
2. Tenderer shall be required to submit the enlisted documents as mentioned below in Cover-1. If
necessary document founds insufficient then the Price Bid of the tenderer shall not be opened.
(a) The tender shall be accompanied by Earnest Money Deposit of Rs.57,000.00 The
tenderer will pay Earnest Money Deposit by Pay Order/Demand Draft issued in favour
of "Commissioner, Surat Municipal Corporation, Surat" by Nationalized Bank. In the
form of Demand Draft and Pay Order
(b) A covering letter detailing various considerations considered in tender shall invariably be
(c) Passport size photographs of all the partners (incase of partnership firm) to be fixed
on relevant Page of the tender documents.
3. (a) List of tools, plants and equipments with tenderer in detail.
(b) Technical establishment/staff of the tenderer in required Performa with their names,
qualifications and experience.
(c) Tenderer shall furnish along with the tender, information regarding Income tax circle
of the district in which he is assessed for income tax with PAN No.
4. Submission of a tender by a tenderer shall mean that he has read this notice and contract
documents and has made himself aware of the scope and specifications of the work to be done
and of conditions and nature of required quantities of materials stores, tools and plants etc. that
may be required by him in carrying out the work and of local conditions and laws and bylaws
of the Government, Surat Municipal Corporation and other factors bearing influence on the
execution and cost of the works.
5. E.M.D., Tender Fee and other necessary document in hard copy shall be received by Registered
Post A.D. or by Speed Post through Postal Authority only by the "Chief Accountant, Surat
Municipal Corporation, TAPIPURA, Surat-395003 On or Before Dt.05/09/2026up to
The same will be opened on the Dt. 07/09/2026, 16.00 hrs. (Technical Bid) onwards
(Probable) in the presence of the tenderers, who shall remain present in the office of "Tender
opening officer, Surat Municipal Corporation, Surat. Late tenders (i.e. tenders received after the
specified time of opening), delayed tender (i.e. tenders received before the time of opening but
after due date and the time of receipt of tender) shall not be considered at all. Tenders
received by Registered Post A.D./ Speed Post after the time and the date specified in the tender
notice shall not be received by the client from the postman. Such tenders if received will not be
opened and will stand rejected.
Note:-As per City Engineer Note No.61,Date 05/02/2025
Currently, in the tenders invited through e-tender system in Surat Municipal Corporation,
generally, the necessary documents related to the tender (tender fee, E.M.D., registration,
turnover, solvency certificate, experience certificate and other documents) are invited separately
in hard copy on some specified days after the last date of online price bid submission.
Considering the complaints received in this regard, in the e-tender system, the amount of the
guarantee (EMD) and the demand draft of the tender free will have to be scanned online and
uploaded in electronic format. The details submitted in this way will be considered as the amount
of the guarantee and tender fee received. And accordingly, the tender will be opened only for the
amount of the bid and the tender fee received in electronic format. For actual payment, the
tenderer will have to submit the original demand draft by registered post AD./Speed post to the
Account Department (Main Office) within 07 (seven) days from the last date of uploading. In the
first case of non-receipt of the original demand draft in the office of the Chief Accountant of
Surat Municipal Corporation within the stipulated time, penal action will be taken to recover the
penalty as per the table given below.
N Tender Amount Penalty Amount
1 Up to Rs. 1.00 crore 10,000/-
2 Rs. 1.00 crore and more than Rs. Up to 20,000/-
Rs. 10.00 crore
3 More than Rs. 10.00 crore and up to Rs. 30,000/-
4 More than Rs. 50.00 crore and up to Rs. 70,000/-
5 More than Rs. 100.00 crore 1,00,000/-
If the tenderer does not deposit the penalty amount with the Municipal Corporation
within 10 days and/or if the tenderer commits such a default/mistake for the second time, then in
case the demand draft is not actually received for the second time, punitive action will be taken
against the contractor (if the contractor does not pay the tender free and guarantee amount within
the stipulated time, the registration of the contractor will be kept in abeance for 06 (six) months
and the e-tendering code will be cancelled for 06 (six) months.) Any documents required for the
support of tender bids shall be scanned and sent online in electronic format and hard copies shall
not be accepted separately. (Reference:- Roads and Building Department Circular No.: Pachar-
102008-5-S, Secretariat Gandhinagar, dated 18/01/2008 and dated 27/11/2008).
6. Tender shall stand rejected if:
1. Any eraser is made in the tender unauthenticated or any page or pages is/are removed or
2. The tenderer shall submit the tender which satisfied each and every conditions laid down
in the notice tender documents, failing which the tender will be liable for rejection.
3. Tenderer's tender/quotation containing conditions shall be liable for rejection out rightly
without assigning any reason for the same.
4. Stipulates the validity period less than what is stated in the form or tender.
5. Stipulates his own conditions.
6. Does not quote his rates inclusive of Octroi duty and other terminal or sales tax or
Central taxes in his rates.
7. Does not disclose the full names and address of all his partners in the case of partnership
8. Does not pay the Earnest Money Deposit by Demand Draft/Pay order or as mentioned in
the tender and Tender Fees with Technical Bid (Cover-1).
9. Does not submit the tender before the stipulated time and specified date in the Account
Office as directed.
10. Does not attach the document mentioned/ does not submit documents required in soft
copy (By scanning)
11. The tenderer proposes any alteration in the work specified in the tender or in the time
limit allowed for carrying out the work or any other condition.
7. All corrections, additions or posted slips to be initialed by the tenderer.
8. All page of tender documents including specifications should be initialed by the contractor.
9. The tenderer shall submit the tender which satisfies each and every conditions laid down in
this notice and tender documents failing which the tender is liable for rejection.
10. Notice of inviting tenders shall be a part of the contract documents.
11. Acceptance of tenderer/quotation will rest with the competent authority of Surat Municipal
Corporation who does not bind himself to accept the lowest and reserves the right to accept or to
reject any or all quotations/tenders and no reasons will be given for acceptance or rejection
12. The contractor shall also attach list of machineries, tools, plants, equipment s which he propose
to deploy for this work.
13. All octroi duty and other taxes chargeable by the Municipal Corporation shall be payable by the
14. Tender once accepted shall be binding on the contractor even if the formal agreement is not
15. Tender once offered can not be withdrawn except with the permission of head of the concerned
department, Surat Municipal Corporation, Surat.
16. The successful tenderer shall be required to enter in to agreement with Municipal Corporation
after placing the work order for the said work from SMC.
17. The successful tenderer may be required to furnish surety of 20% of the contract value on stamp
paper if so desired by the Municipal Commissioner.
18. The tenderer s are requested to give complete specification of work quoted.
19. Unless specifically mentioned by the tenderer for the extra payment of taxes on price quoted by
them it will be presumed the prices quoted are inclusive of the all taxes and no claim will be
entertained for payment of extra taxes on the bills submitted by them.
20. The Price-bid will be opened only after technical clarifications are clarified.
21. Surat Municipal Corporation reserves the right to open or not to open any or all Price-bid
without assigning any reason thereof.
IT-11 TENDER VALIDITY PERIOD :
The validity period of the tender submitted for this work shall be of one hundred twenty (120)
Calendar day from the date of opening of price bid and that the tenderer shall not be allowed to
withdraw or modify the tender offer on his own during the validity period. The tenderer will not
be allowed to withdraw the tender or make any modifications or additions in the terms and
conditions of his own in his tender. If this is done then the owner shall, without prejudice to any
right or remedy, be at liberty to reject the tender and forfeit the Earnest Money Deposit in full.
IT-12 SIGNING OF TENDER DOCUMENTS :
If the Tender is made by an individual it shall be signed with his full name above his current
address. If he tender is made by a Proprietary firm it shall be signed by the proprietor above his
name and the name of his firm with his current address.
If the tender is made by a firm in partnership it shall be signed by all the partners of the firm
above their full names and current addresses, or by a partner holding the power of attorney for
the firm signing the Tender in which case a certified copy of the power of attorney shall
accompany the Tender. A certified copy of the partnership deed, current addresses of all the
partners of the firm shall also accompany the tender.
If the tender is made by a limited company or a limited Corporation, it shall be by a duly
authorized person holding the power of attorney for signing the Tender in which case a certified
copy of the power of attorney shall accompany the Tender. Such limited company or
Corporation may be required to furnished satisfactory evidence of its existence before the
contract is award.
All witnesses and sureties shall be persons of status and probity and their full names, occupations
and addresses shall be stated below their signatures. All signatures in the Tender document shall
IT-13 WITHDRAWAL OF TENDERS :
If, during the Tender validity period, the Tenderer withdraws his Tender, the Tender Security
(Earnest Money) shall be forfeited and the Tenderer may be disqualified from tendering for
further works under the jurisdiction of SURAT MUNICIPAL CORPORATION
IT-14 INTERPRETATIONS OF TENDER DOCUMENT :
Tenderers shall carefully examine the tender documents and fully inform themselves as to all the
conditions and matters which may in any way effect the work or the cost thereof. Should a
tenderer find discrepancies or omission from the specifications or other documents, or should be
in doubt as to their meaning, he should at once address query to the Divisional Head provided for
concerned authority as referred in the Tender Document in Clause GC-01 (Definitions and
interpretations) of the (General Condition of Contract). Any resulting interpretation of the Tender
documents will be issued to all Tenderers as an addenda corrigendum. Verbal clarification and /
or information given by the SMC / Consulting Engineer shall not be binding on the Municipal
IT-15 ERRORS AND DISCREPANCIES IN TENDERS :
In case of conflict between the figures and words in the rates, the rates expressed in words shall
prevail and apply in such cases.
IT-16 MODIFICATION OF DOCUMENTS :
Modification of specifications and extension of the closing date of the tender, if required, will be
made by an addendum. Copies of each addendum will be sent to all tenderers. These shall be
Signed and shall form a part of tender. The tenderer shall not add to or amend the text of any of
the documents except in so far as may be necessary to comply with any addenda.
Addenda form part of the contract documents & full consideration shall be given to all addenda
in the preparation of tenders. Tenderers shall verify the number of addenda issued, if, any and
acknowledge the receipt of all Addenda in the Tender. Failure to acknowledge may cause the
Tender to be rejected.
A. The Engineer of the owner may issue Addenda to advise Tenderers of changed requirements.
Such addenda may modify previously issued Addenda.
B. No Addendum may be issued after the time stated in Notice Inviting Tenders.
IT-18 TAXES AND DUTIES ON MATERIAL :
GST (Goods & Service Tax) has come in existence from 1st July, 2017. Contractor/ Successful
Bidder is bound to pay any amount of GST proscribed by the govt. of India as per the Terms of
Contract agreed upon during the course of execution of this contract.
During the course of execution of Contract, if there is any change in Rate of GST (Goods &
Service Tax) by the Government, the same shall be reimbursed/ recovered separately by SMC,
subject to the submission of Original Receipt/ Proof for the amounts actually remitted by the
successful Tenderer/ Contractor to the competent Authority along with a Certificate from
Chartered Accountant of Contactor/ Successful Bidder certifying that the amount of GST paid to
the Government and the same shall be intimated/ submitted/ claimed within 30 (thirty) Days from
the date of payment Remittance of GST within stipulated period shall be the sole responsibility
of the successful Bidder/ Contractor, failing which, SMC may recover the amount due, from any
other payable dues with SMC and decision of Municipal Commissioner shall be final and binding
on the Contractor / Successful Bidder in this regard Further, non-payment of GST to the
Government may lead to the termination of contract and forfeiture of Security Deposit/
Performance Guarantee Amount.
If imposition of any other new Taxes/ Duties/ Levies/ Cess or any other incidentals etc. or any
increase in the existing Taxes/ Duties/ Levies/ Cess or any other incidentals etc. (Excluding GST
) are imposed during the course of the contract, the same shall be borne by the Contractor/
Successful Bidder only, in no case SMC shall be liable for the same.
As per the central goods and Service Tax Act-2017 Any Goverment department, local bodies and
government undertaking public adventures published tenders amounting more then Rs.
& which commodities/ servies are comes under taxation than 2% TDS (1% for SGST &
1% for CGST) should be deducted. And if commodities/Servies are provided from interstate then
2% TDS should be deducted of IGST.
1% Construction Cess will be deducted from respective R.A. Bill and Final bill in accordance
with the prevailing norms of Govt. of Gujarat.
IT-19 EVALUATION OF TENDERS :
As per IT (04), Experience of the Contractor shall be considered for Similar kind of works.
IT-20 EVALUATION OF TIME REQUIRED FOR COMPLETION :
The time required for completion of work shall be considered as indicated by the tenderer in the
completion schedule attached with the tender. The completion period mentioned in this schedule
is to be reckoned from 10th day from the date of work order to proceed. Total completion period
is calendar months from 10th day from date of issue of work order and tenderer s should adhere
to this delivery time.
IT-21 POLICY FOR TENDER UNDER CONSIDERATION :
Tenders shall be termed to be under consideration from the opening of the tender until such time
an official announcement of award is made.
While tenders are under consideration, tenderer s and their representative or other interested
parties are advised to refrain from connecting by any means Municipal Corporation or
representatives on matters related to the tenders under study. The Engineer's representative if
necessary will obtain clarification on tenders by requesting information from any or all the
tenderer s either in writing or through personal contact, as may be necessary. The tenderers will
not be permitted to change the substance of his tender after price submission. Non-compliance
with this provision shall make the tender liable for rejection.
IT-22 PRICES AND PAYMENTS :
The tenderer must understand clearly that the price quoted are for the total works or the part of
the total works quoted for and include all costs due to materials labour, equipment, supervisions,
other services, royalties and Octroi etc. and to include all extras to cover the cost. No claim for
additional payment beyond the prices quoted will be entertained and the tenderer will not be
entitled subsequently to make any claim on any ground excepting for the condition laid down in
GC-35 (Price Adjustment).
IT-23 PAYMENT TERMS :
The terms of payment are defined in the General Conditions of Contract. The Municipal
Corporation shall not under any circumstances relax, their terms of payment and will not
consider any alternative payment terms. Tenderer s should therefore in their own interest note
this provision to avoid rejection of their tenders.
Award of the Contract or the rejection of tenders will be made during the Tender validity period
stated in the Notice Inviting Tenders.
A. After all contract contingencies are satisfied and the Notice of Award is issued, the successful
Tenderer shall execute the Contract Agreement within the time stated in the Notice Inviting
Tenders and shall furnish the Bond as required herein. The Contract Agreement shall be
executed in the form stipulated by the owner. A copy of the required form is included in the
contract documents.
B. If the Tenderer receiving the Notice of Award fails or refuses to execute the Contract
Agreement within the stated time limit or fails or refuses to furnish the Bond as required
herein, the SMC may annul his award and declare the tender security forfeited.
C. A Corporation, Partnership firm or other consortium acting as the Tenderer and receiving the
Award shall furnish evidence of its existence and evidence that the officer signing the
Contract Agreement & Bonds for the Corporation, partnership firm or other consortium
acting as the Tenderer is duly authorized to do so.
IT-25 SIGNING OF CONTRACT :
The successful tender shall be required to pay the security deposit and to execute the contract
within 10 days of receipt of intimation to execute the contract, failing which the Municipal
Corporation will be entitled to annul the award and forfeit the Earnest Money Deposit. The
person to sign the contract document shall be person detailed in Article IT-12.
T-26 DISQUALIFICATION :
A tender shall be disqualified and will not be taken for consideration if :-
(a) The outer envelope does not show on the outside the reference of bid and thus get
opened before the due date of opening (as per Article IT-10 i.e. Submission of Tender
(b) The tender Security Deposit is not deposited in full and in the manner i.e. Earnest
(c) The tender is in a language other than English or does not contain its English
Translation in case of other language adopted for tender preparation.
(d) The tender documents are not signed by an authorized person.
(e) The general performance data for qualification not submitted fully.
(f) The tenderer does not agree to deposit security amount as specified (as per Article IT-
25 i.e. Signing of Contract).
(g) The tenderer does not agree to payment terms defined as per Article IT-23 i.e. Payment
(h) Conditional tender.
A. Tenderer may further be disqualified if :
(a) Price variation is proposed by the Tenderer on any principles other than
provided in the Tender Documents.
(b) Completion schedule offered is not consistent with the completion schedule
defined and specified in tender documents.
(c) The validity of tender is less than that mentioned in Article IT-11 i. e. Tender
Validity Period.
(d) Any of the page or pages of tender is/are removed or replaced.
(e) All corrections or pasted slips are not initialed by tenderer.
(f) Any erasure is made in the tender.
IT-27 PERFORMANCE GUARANTEE (SECURITY DEPOSIT) :
The total Security Deposit is 4% (Four) percent of contract value and shall be as under:
The successful tenderer shall have to pay initial security deposit at 2% (two) percent of the tendered amount.
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order if the Tender
Amount of work is less than Rs. 2.00 crore.
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order / bank Guarantee
(encashable at Surat city)/ FDR if the tender Amount of work is more than Rs. 2.00 crore & 2.00 crore.
The person/persons whose tender may be accepted [here-in after called the Contractor, which expression shall
unless excluded by or repugnant to the context include his heirs, executors, administrators and assignees shall
(within 15 days of the receipt by him of the notification of the acceptance of his tender) deposit with Municipal
Commissioner cash or Government securities endorsed to the Commissioner sum sufficient which will make up the
full security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified above is not paid the
tender contract already accepted shall be considered as cancelled. The security deposit lodged by Contractor shall
be refunded after the expiry of the Defects Liability period as shown in the attached Memorandum after deducting
dues, if any, which become liable to be recovered from the Contractor under the terms and conditions of this
Regarding remittance and release of Security Deposit (SD), Retention money deposit (RMD) following clause will
supersede over and above all the clauses depicted in the tender document.
Tender costing Less than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of which, 50% of
amount as Initial Security Deposit shall be payable at the rate of 2% of approved tender cost in form
of Cash or Demand Draft/ Pay Order of any Nationalised Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b) Release of SD/RMD
(i) The 2% Initial security deposit in form of Cash or Demand Draft/ Pay Order shall be released after
clearance of Final bill by Audit Dept and completion of defect liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be released
along with Final Bills according to Work Quality..
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
Tender costing Rs.2.00 Crore. & more than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of which, 50% of
amount as Initial Security Deposit shall be payable at the rate of 2% of approved tender cost in form of in
Cash or Demand Draft/ Pay Order / FDR / Bank Guarantee of any Nationalised Bank (encashable at Surat
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each running account bill.
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b 1) Release of SD/RMD
(i)The 2% Initial security deposit in form Demand Draft /Pay order / FDR shall be released after
clearance of Final bill by Audit Dept & completion of defect liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be released
along with Final Bills according to Work Quality.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
(b 2) Release of SD/RMD
(i)The 2% Initial security deposit in form Bank Guarantee shall be released along with Final Bills according
to Work Quality.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be released after
clearance of Final bill by Audit Dept & completion of defect liability period.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
The amount recovered from the running bills as security deposit shall not be allowed to the transferred in the
form of Bank Guarantee. However, the remaining 50% (2% of Security Deposit) of the amount so, deducted from
running bills will be allowed for conversion in the form of interest bearing fixed deposit receipt, (FDR) issued in
favour of the Municipal Commissioner, Surat Municipal Corporation, Surat by a Nationalized Bank located at Surat
only. Additional stamp duty payable as per government prevailing rule shall be paid by contractor for remittance
It is clarified that the amount of security deposit shall be collected on the basis of contract price and not on the
basis of Estimated Amount put to tender. As initial Security Deposit as mentioned above, accepted by the
competent Authority shall have to be paid toward Security Deposit at the time of execution of agreement.
Interest will be payable on FDR (that is deducted from Running Bill and converted in to FDR for initial SD) for One
year, after completion of work. After that no further interest shall be paid for any extended period what so ever.
If the Security Deposit is not paid within 15 days from the date of L.O.I. / Work Order than penalty at the rate of
0.065% per day of the amount of Security Deposit will charged. If the Security Deposit is not paid within one
month with interest, necessary actions as per condition of contract will be taken.
Initial Security Deposit ( i.e. 2% Of Tender Amount) in form of Bank Guarantee may be accepted as per relevant
tender provision, However BG shall be valid till final date of completion of work+1year (Whether final bill is
audited and paid or not). It shall be contractor's responsibility to extent the BG On Or Before expiry of time limit
of BG. In case of late renewal of BG, penalty of security deposit shall be levied at the rate of 0.065% of per day
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper of Rs. 300/- if initial
Security Deposite paid in form Bank Guarantee or Demand draft as per the form of the agreement approved by
the Municipal Corporation, Surat.
If initial Security deposit is paid in form of Fixed Deposit, additional stamp paper amounting As per
government’s prevailing rule of Security Deposit shall be used to execute the agreement.
The undertaking shall be executed on stamp paper worth Rs. 300/-.
The Surety shall be executed on stamp paper worth Rs. 300/-.
IT-28 STAMP DUTY :
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper of
Rs.4.90% of S.D. Amount, if S.D. Amount in FDR and otherwise as per the form of the
agreement approved by the Municipal Corporation, Surat.
The agreement shall be executed on stamp paper worth Rs.4.90% of S.D. Amount.
The Undertaking and Surety shall be executed on stamp paper worth Rs.300/- + Rs.300/-.
Specific references in the specifications to any materials by tender's name, or catalogue number
shall be construed as establishing a standard or quality and performance and not as limiting
competition and the tenderer in such cases, may at their option freely use any other product,
provided that it ensures and equal or higher quality than the standard mentioned and meets
Municipal Corporation approval.
IT-30 NON-TRANSFERABLE :
Tender documents are not transferable.
IT-31 COST OF TENDERING :
The owner will not defray expenses incurred by Tenderer s in tendering.
IT-32 DEFECT OF TENDER :
The Tender for the work shall remain open for a period of 120 calendar days from the date of
receipt of the tenders for this work and that the tenderer shall not be allowed to withdraw or
modify the offer on his own during the period. If any tenderer withdraws or makes any
modifications or additions in the terms and conditions on his own, then the Municipal
Corporation, shall without prejudice to any right or remedy, be at liberty to reject the tender and
forfeit the earnest money in full.
IT-33 CHANGE IN A QUANTITY :
The Surat Municipal Corporation reserves the right to waive any informality in any tender and to
reject one or all tenders without assigning any reasons for such rejections and also to very to
quantities of items or group as specified in the Schedule of price as may be necessary. Claim
what so ever by the contractor on the basis of variation of quantities shall not be entertained.
IT-34 NEW EQUIPMENT AND MATERIAL ;
All materials, equipment and spare parts thereof shall be new, unused and originally coming from
manufacturer's plant to the Corporation. The rebuilt or overhauled equipment/materials will not
be allowed to be used on work.
IT-35 RIGHTS RESERVED ;
The SMC reserves the right to reject any or all tenders, to waive any informality or irregularity in
any tender without assigning any reasons. The SMC further reserves the right to withhold
issuance of the notice to proceed, after execution of the contract agreement, for the period of
time stated in the notice inviting tenders and no additional payment will be made to the
successful tenderer on account of such withholding. The SMC is not obliged to give reasons for
any such action.
IT-36 Municipal Commissioner reserves the right to reduce the scope of work and split the tender in
two or more parts without assigning any reason even after the award of contract.
IT-37 No mobilization advance or advance on machinery will be given.
IT-38 The scope of work is clearly mentioned in the tender documents. The contractor shall have to
carry out the work in accordance with the details specifications. No conditions will be accepted.
The conditional tender will be liable to be rejected.
IT-39 The surplus excavated earth, after back-filling the trenches shall have to be removed from the site
After compaction and consolidation, if any short fall of earth is found then contractor has to bring
the same to the required quantity in order to meet shortfall at his own cost. More over, if any
settlement of road after reinstatement is oobserved during the defect liability period of the work.
Contractor shall be fully responsible for the defective work and patches/ depression / settlement
shall be repaired with quarry spoil or metal at contractor's own cost. If contractor fails to repair
the patches / depression / settlement in time, corporation will repair it at all risk and cost of
Surplus earth shall not be disposed off in a way that leads to nuisance to the public or SMC.
IT-41 No escalation charge/rates shall be paid by SMC in anycase.
IT-42 Contractor must be submitted The cement/steel (Zerox copy) billwise.
IT-43 Contractor must be submitted royalty pass(zerox).
IT-44 All the taxes should be bear by agency & it should be applicable as per government resolution (of
change periodically) & No compensation/Reimbersion should be given to theagency.
IT-45 TAX INVOICE FOR PAYMENT OF WORK (AS PER GST RULES)
The contractor shall submit all bills on the Prescribed format, include in Tender for purpose of
payment of the work to the office of the Engineer-in-charge.
IT-46 TESTING OF CEMENT AND STEEL
It should be specifically noted that the cement and steel brought by the contractor at site of work
shall be used only after the same is tested at the approved laboratory as per the direction of the
Engineer-in-charge. Such approved laboratory may be located at Surat, Baroda, and Ahmedabad
All the charge for the transport and testing of the samples shall have to be borne by the
contractor. The frequency of testing such material shall be in accordance to the relevant Indian
Standards as directed by Engineer-in-charge
EXECUTIVE ENGINEER,
SIGNATURE OF THE CONTRACTOR. SURAT MUNICIPAL CORPORATION
SURAT MUNICIPAL CORPORATION
PERCENTAGE RATE TENDER & CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS :-
(1) All work proposed to be executed by contract shall be notified in a form of invitation to tender
pasted on a board hung up in the office of the Engineer & signed by the Engineer.
This form will state the work to be carried out as well as the date/or submitting and opening
tenders and the time allowed for carrying out work, also the amount of earnest money to be
deposited with the tender and the amount of the Security Deposit to be paid by the successful
tenderer and the percentage, if any, to be deducted from bills. It will also state whether a refund
of quarry fees, royalties, octroi dues and ground rent will be granted. Copies of the
specifications, designs and drawings and estimated rated scheduled rates and any other
documents required in connection with the work which shall be signed by the Engineer- in-
charge for the purpose of identification shall also be open for inspection by contractors at the
office of the Engineer-in- charge during office hours.
Where the work are proposed to be executed according to the specifications recommended
by a contractor and approved by a competent authority on behalf of the corporation,
such specifications with designs and drawings shall form part of the accepted tender.
(2) In the event of the tender being submitted by a firm, it must be signed separately by each partner
thereof, or in the event of the absence of any partner, it shall be signed on his behalf by a
person holding a power of attorney authorizing him to do so.
(3) Receipts for payments made on account of any work, when executed by a firm, shall also be
signed by all the partners, except where the contractor are described in their tender as a firm, in
which case the receipts shall be signed in the name of the firm by one of the partners or by some
other persons having authority to give effectual receipts for the firm.
(4) Any persons, who submit tender shall fill up the usual printed form including the `Column'
total according to estimated quantities, stating at what rate he is willing to undertake the
each item of the works, Tenders which proposal any alterations in the work specified in the said
form of invitation to tender or in the time allowed for carrying out the work or which contain
any other conditions of any short, will liable to be rejection No.signle tender include more
than one will liable to be rejection No. single tender include more then one work but contractors
who wishes to tender for each. Tender shall have (to which they refer) written outside the
(5) The Commissioner or his duly authorized assistant shall open tender in the presence of any
intending contractors who have submitted tender or their representatives who may be present at
the time.In the event of a tender being accepted, the contractor shall there upon for the
purpose of identification, sign the copies of the specifications and other documents mentioned
in this tender. In the event of the tender being rejected, the divisional officer shall authorized
the accountant to refund the amount of earnest money deposited to the contractor making the
tender on his giving a receipt for the returned of the money.
(6) The officer competent to dispose of the tender shall have the right of rejecting all or any of the
(7) No receipts for any payment alleged to have been made by a contractor in regard to any
matter to this tender shall be valid and binding on corporation unless it is signed by the
Engineer-in- charge.
(8) The memorandum of work to be tendered for and the schedule of materials to be supplied by
the concern department and their rates shall be filled in and completed by the officer of the
Engineer- in-charge before the tender form is issued. If a form issued an intending tenderer
has not been so filled in and completed, he shall request the said officer to have this done
before he completes and delivers his tender.
(9) All works shall be measured net by standard measure and according to the rules and customs of
the Public Works Department without reference to any local custom.
(10) Under no circumstances shall any contractor be entitled to claim enhanced rates for any items in
(11) Every contractor shall unless excepted in writing by the Additional City Engineer
concerned, produced along with the tender, a solvency certificate of his financial stability
from the Collector of the District within which he resides or a Bankers certificates. If he fails
to produce such a certificate, his tender may not be considered.
(12) All corrections and additions or pasted slips should be initiated.
(13) The measurement of work will be taken according to the usual method in use in the public
works department and no proposals to adopt alternative methods will be accepted. The
Engineer-in-charge decision as to what is "the usual method in use in the public works
department" will be final.
(14) A.The Insurance Company's bond will not be accepted against the Security Deposit.
(15) The contractor shall have to attach to his tender Income Tax Clearance Certificate to be
obtained from the Income Tax Officer.
(16) The Contractor will have to construct a shed for storing control and valuable materials issued to
him under Schedule-`A' of the agreement at work site having double locking arrangement.
The materials will then be taken for use in the presence of the department person. No
materials will be allowed to be removed from the site of work except with the written permission
from Engineer- in-charge.
(17) No foreign exchange will be released by the Corporation for the purpose of plant and machines
required for the execution of the work contracted for.
(18) Controlled materials (Essentiality certificate)
(i) As regard controlled materials the Corporation will help to arrange for the permit as far as
possible and help the contractor in securing for the permit as far as possible and help the
contractor in securing the same. All incidental charges met with in procuring these materials
shall be borne by the contractor himself. Though the Corporation will help to arrange for the
permit as far as possible and help the contractor in obtaining the materials it shall not accept
any responsibility for any delay or loss on account of delay caused to the contractor while
obtaining the same.
(ii) The contractor shall submit to Engineer-in-charge on Close of every calendar months, the
monthly returns in the prescribed forms as to the receipt and actual use of the controlled
materials during the month.
(iii) The contractor shall permit the Engineer- in- charge or his representatives to inspect the
stock of the controlled materials stored by him at any time, whenever the Engineer-in- charge
or his representatives so desired (s).
(19) The tender for work shall remain open for a period of 120 days from the date of opening of the
price bid for this works and that the tenderer shall not be allowed to withdraws or modify the
offer on his own during this period. If any tenderer withdraws or makes any modifications or
addition/s in the terms and conditions of his tender, not acceptable to the corporation them the
corporation shall without prejudice to any right or remedy be at liberty in full the said earnest
money absolutely (in figures as well as in words). This Blank Space should be filled in while
preparing the draft tender papers.
(20) The contractor shall employ only such laborers who shall produce a valid certificate of having
been vaccinated against small pox within a period of last 3 years.
(21) Tenderer should submit True Copy of the Certificate of Registration along-with the
tender without which the tender will not be considered.
(22) The contractor shall have to give in writing the date completion of the work within a fortnight
from the date of work completed by him. Otherwise the date noted on the record by the
department shall be reawakened as final and no excuse or representation in that behalf shall be
entertained at later date.
(23) "What ever sales tax is levied by the Government on works contract and if paid by the contractor
in the first instance, shall be refunded to the concerned contractor by Corporation.
EXECUTIVE ENGINEER,
SIGNATURE OF CONTRACTOR SURAT MUNICIPAL CORPORATION
GENERAL CONDITION OF CONTRACT
GC-01 DEFINITIONS AND INTERPRETATIONS :
1.0 In the contract documents, as herein defined the following words and expression used shall,
unless, repugnant to the subject or context thereof, have the following meanings assigned to them.
1.1 The "Owner/Municipal Corporation, Surat represented by Municipal Commissioner/Add. City
Engineer, any officer authorised by the Municipal Corporation.
1.2 The "Contractor" shall mean the person or the persons, firm of company whose tender has
been accepted by the owner and includes his legal representative successors and permitted assigns.
1.3 The "Engineer-in-charge" shall mean the person designated as such by the owner from time to
time and shall include those who are expressly authorised by the Municipal Corporation to act for
and on its behalf for the operation of this contract.
1.4 "Engineer - in - charge's Representative” shall mean any Engineer or Asstt. to the Engineer-in-
charge designated from time to time by the Engineer-in-charge to perform duties set forth in the
Tender documents whose authority shall be notified in writing to the Contractor by the Engineer-in-
1.5 "Tender” The offer or proposal of the Tenderer submitted in the prescribed form setting forth the
prices for the work to be performed, and the details thereof.
1.6 "Contract Price shall mean total money payable to the Contractor under the contract documents.
1.7 "Addenda" shall mean the written or graphic notices prior to submission of tender which
modify or interpret the contract documents.
1.8 "Contract Time" - The number of consecutive calendar months for the completion of work
as stated in the executed contract agreement.
1.9 "Contract" shall mean agreements between the parties for the execution of works including
therein all contract documents.
1.10 "Tender document” shall mean Designs, Drawings, specifications, agreed variations, if any, and
such other documents constituting the tender and acceptance thereof.
1.11 "The Sub-Contractor" means any person, firm or company (other than the contractor) to
whom any part of the work has been entrusted by the Contractor with the written consent of the
Engineer-in-charge and the legal personnel representative, successors and permitted assigns of such
person, firm or company.
1.12 "The Specifications" shall mean all directions' the various technical specifications provisions
and requirements attached to the contract which pertain to the method and manner or performing the
work to the quality of the work and the materials to be furnished under the contract for the work and
any order(s) or instruction (a) thereunder. It shall also mean the latest Indian Standards Institution
Specifications for or relative to the particular work or part thereof, so far as they are not contrary to
the Tender specifications or I.S.I. specifications, and in absence of any tender specifications, the
specifications of any other country applied in India as a matter of Standard Engineering practice
and approved in writing by the Engineer-in-charge with or without modifications.
1.13 The "Drawing" shall include maps, plans, tracings or prints thereof with any modifications
approved in writing by the Engineer-in-charge and such other drawings, as may, from time to time, be
furnished or approved in writing by the Engineer-in-charge in connection with the work.
1.14 The "Work" shall mean the works to be executed in accordance with the context or the part
thereof as the case may be and shall include extra, additional altered or substituted works as
required for the purpose of the Contract. It shall mean the totally of the work by expression or
implication envisaged in the contract and shall include all material, equipment and labour required for
or relative or incidental to or in connection with the commencement, performance and completion of
any work and/or for incorporation in the work.
1.15 The "Permanent work “means works which will be incorporation in and form part of the work
to be handed over to the owner by the contractor on completion of the contract.
1.16 The "Temporary Work" shall mean all temporary works of every kind required in or about
the execution, completion and maintenance of the work.
1.17 "Site shall mean the land and other place on, under, on or through which the work is to be
carried out and any other lands or places provided by the Municipal Corporation for the purpose of the
Contract together with any other places designated in the Contract as forming part of the site.
1.18 "The Construction Equipment" means all appliance/equipment’s of whatever nature required in
or for execution, completion or maintenance of work or temporary works (as hereinafter defined) but
does not include materials or other things intended to form or forming part of the permanent work.
1.19 "Notice in Writing or Written Notice" means a notice written, types or printed form
delivered personally or sent by Registered post to the latest know private of business address at
Registered Office of the Contractor.
1.20 The "Alteration/Variation order" means an orders given in writing by the Engineer-in-charge to
effect additions to or deletion from and alterations in the work.
1.21 "Final Test Certificate" shall mean the final test Certificate issued by the owner within the
provisions of the Contract.
1.22 The "Completion Certificate" shall mean a certificate to be issued by the Engineer-in-charge
when the work has been completed to his satisfaction.
1.23 The "Final Certificate" shall mean the final certificate issued by the Engineer-in-charge after
the work is finally accepted by the owner.
1.24 "Defect Liability Period" shall mean the specified period between the issue of completion
Certificate and the final certificate as specified in the tender.
1.25 "Approved" shall mean approved in writing including subsequent modification in writing
of previous verbal approval and "Approval" means approved in writing including as aforesaid.
1.26 "Letter of Acceptance “shall mean an intimated by a letter to tenderer that the tender has been
accepted in accordance with provisions contained therein.
1.27 "Order" and "Instruction" shall respectively mean any written order or instruction given by
the Engineer-in- charge within the scope of his powers in terms of the Contract.
1.28 "Running Account Bill" shall mean a Bill for the payment of "On Account" money to the
contractor during the progress of work on the basis of work done and the non-perishable materials to
be incorporated in the work supplied by the Contractor.
1.29 "Security Deposit" shall mean the deposit to be held by the owner as security for the due
performance of contractual obligations.
1.30 "The appointing authority" for the purpose of Arbitration shall be the Municipal
Commissioner, Surat Municipal Corporation, Surat.
1.31 Retention Money shall mean the money retained from R.A.Bill for due completion of "NET
1.32 Unless otherwise specifically stated, the masculine gender shall include the faminine and
natural genders and vice versa and the singular shall include the plural and vice-versa.
GC-02 LOCATION OF SITE AND ACCESSIBILITY :
The site of works is within the limits of Surat Municipal Corporation. It is served by all
weather roads and Western Railway Broad Gauge line, Government Irrigation Canal Crossing. The
intending Tenderer should inspect the site and make himself familiar with site conditions and available
communication facilities. Non availability of access/roads shall in no case be the cause to Condon any
delay in the execution of the work or be the cause for any claims or extra compensation.
GC-03 SCOPE OF WORK :
The scope of work is defined broadly in the special conditions of Contract and specifications. The
Contractor shall provide all necessary materials equipment and labour etc. for the execution and of
the work till completion. All materials that go with the work shall be approved by the Engineer-in-
charge prior to procurement and use.
Owner at his discretion may endeavor to provide water to the Contractor at the owner's source of supply
at one point at the rate charged for such works.
The contractor shall make his own arrangement for the distribution pipe net works from the source of
supply after getting prior permission for the same from the Engineer-in-charge. Supply of water
shall not be free and the necessary charges as fixed by the Local Body shall have to be paid by the
However, owner does not guarantee the supply of water and this does not relieve the contractor of
his responsibility in making his own arrangements and for the timely completion of the work as
The Contractor shall have to make his own arrangement for power supply.
LAND FOR CONTRACTOR'S FIELD OFFICE, GODOWN & WORKSHOP:
Owner will not be a position to provide land required for Contractors shall have to make his
own arrangement for the same. No land will be provided by S.M..C. to the contractor for constructing
his labour and supervisory comp and other service facilities.
GC-04 RULLING LANGUAGE :
The language according to which the contractor shall be constructed and interpreted shall
be English. All entries in the contract documents and all correspondence between the contractor and
the Municipal Corporation or the Engineer shall be in English. All dimensions for the materials shall
be given in metric units only.
GC-05 INTERPRETATION OF CONTRACT DOCUMENT :
1. The provisions of the General Conditions of Contract and special conditions of contract
shall prevail over those of any other documents of the contract unless specifically provided otherwise.
Should there be any discrepancy, inconsistency error or omission in the several documents forming
the contract, the matter may be referred to the Engineer-in-charge for his instructions and decision.
The Engineer-in-charge's decision in such case shall the final and binding to the contractor.
2. Works shown upon the drawings but not described in the specifications of described in the
specific specifications without showing on the drawings shall be taken as described in the specifications
and shown on the drawings.
3. The heading and the marginal notes to the clauses of those general conditions of contract or to the
specifications or to any other part of tender documents are solely for the purpose of giving a concise
indication and not a summary of contents thereof or be used in the interpretation or construction
thereof of the contract.
4. Unless otherwise stated specifically, in this contract documents the singular shall include the
plural and vice versa wherever the context so requires. Works implementing persons shall include
relevant corporate companies/ registered associations / body of individual / firm of partnership.
5. Notwithstanding the sub-divisions of the documents into separate sections and volumes every part
of each shall be supplementary to and complementary of every other part and shall be read with and
into the context so far as it may be practicable to do so.
6. Where any portion of the General Conditions of contract is repugnant to or are variance with any
provisions of the special conditions of contract, then, unless a different intension appears, the
provisions of the special conditions of contract shall be deemed to override the provisions of General
conditions of Contract and shall to the extent of such repugnancy or variance prevail.
7. The materials, Design and Workmanship shall satisfy the relevant I.S.S.and Codes referred to. If
Additional require- ments are shown in the specifications, the same shall be satisfied over and above
I.S.S. and Codes.
8. If the specification mention that the contract shall perform certain work or provide certain facilities,
it will mean that the contractor shall do so at his own cost.
9. The correctness of the details given in the tender documents is not guaranteed. The contractor shall
independently obtain all necessary information for making the tender. The contractor shall be
deemed to have examined the Contract Documents, to have generally obtained his own information in
all matters that might affect the carrying out of the work or the Tenderer rates. Any error in
description of quantity or commission there from shall not vitiate the contract or release the contractor
from executing the work comprised in the contract according to the Drawings and specifications at the
tendered rates. He is deemed to have known the scope, nature and magnitude of the work and the
requirements of materials and labour involved and as to what all works he has to complete in accordance
with the contract what-so ever be the defects, omissions, or errors that may be found in the contract
documents. The contractor shall be deemed to have visited the site and the surroundings, to have satisfied
himself to the nature of all existing structures, if any, and also as to the nature and the conditions of
railways, roads, bridges and culverts, means of transport and communications, whether by land, air or
water and as to possible interceptions thereto and the access and agrees from the site, to have made
inquires, examined and satisfied himself as to the sites for obtaining sand, stones, bricks and other
materials, the sites for disposal of surplus materials, the available accommodation as to whatever
required, the depicts and such other buildings as may be necessary for executing and completing the
work, to have local independent inquiries as to the subsoil, subsoil water and variation thereof, storms,
prevailing winds, climatic conditions and all other similar matters effecting the work. He is deemed to
have acquainted himself as to his liability for payment of Government taxes, custom duty and other
Any neglect or failure on the part of the contractor in obtaining necessary and reliable information
upon the forgoing or any other matters affecting the contract shall not relieve him from any risks or
liabilities or the entire responsibility from completion of the work at the tendered rates and time in
strict accordance with the contract documents.
No verbal agreement or inference from conversation with any officer or employee of the wormer either
before or after the execution of the Contract Agreement shall in any way effect or modify any of the
terms of obligations herein contained.
GC-06 CONTRACTOR TO UNDERSTAND HIMSELF FULLY ;
The contractor by tendering shall be deemed to have satisfied himself, as to consideration and
circumstances affecting the tender price, as to the possibility of executing the works as shown and
described in the contract and to have fixed his prices according to his own view on these matters and to
have understand that no additional allowances except as otherwise expressly provided, will after
words be made beyond the contract price. The contractor shall be responsible for any
misunderstanding or incorrect information given in writing by the Engineer.
GC-07 ERROR IN SUBMISSION ;
The contractor shall be responsible for any errors or omissions in the particulars supplied
by him. Whether such particulars have been approved by the Engineer or not, provided that such
discrepancies, errors or omissions be not due to inaccurate information or particular furnished in
writing to the Contractor by the Municipal Corporation or the Engineer.
GC-08 SUFFICIENCY OF TENDER :
The Contractor shall be deemed to have satisfied himself before tendering as to the
correctness of the tender rates which rates shall, except as or other wise provided for, cover all the
Contractor's liabilities and obligation set further or implied in the contract for the proper execution of
work for compliance with requirements of Article GC-19 thereof.
GC-09 DISCREPANCIES :
The drawings and specifications are to be considered as mutually explanatory of each other,
detailed drawings being followed in preference to small scale drawings and figures dimension in
preference to scale and special conditions in preference to general conditions. Special direction or
dimensions given in the specifications shall supersede all else. Should any discrepancies however,
appear or should any misunderstanding arise as to the meaning and intent of the said specifications or
drawings, or as to the dimensions or the quality of the materials or the due and proper execution of the
works, or as to the measurement or quality and valuation of the works executed under this contract or as
extra there upon the same shall be explained by the Engineer-in-charge and his explanation shall
subject to the final decision of the Additional City Engineer, in case reference be made to him, be
binding upon the contractor shall execute the work according to such explanation (subject to aforesaid)
and without addition to or deduction from the contract and shall also do all such works and things
necessary for the proper completion of the works as implied by the Drawings and specifications,
even though such works and things are not specially shown and described in said specifications. In
cases where not particular specifications are given for any article to be used under the contract, relevant
specifications of the Indian Standard Institution shall apply.
GC-10 PERFORMANCE GUARANTEE : (Security Deposit)
The total Security Deposit is 4% (Four) percent of contract value and shall be as under:
The successful tenderer shall have to pay initial security deposit at 2% (two) percent of the tendered
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order if the
Tender Amount of work is less than Rs. 2.00 crore.
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay Order / bank
Guarantee (encashable at Surat city)/ FDR if the tender Amount of work is more than Rs.
crore & 2.00 crore.
The person/persons whose tender may be accepted [here-in after called the Contractor, which expression
shall unless excluded by or repugnant to the context include his heirs, executors, administrators and
assignees shall (within 15 days of the receipt by him of the notification of the acceptance of his tender)
deposit with Municipal Commissioner cash or Government securities endorsed to the Commissioner sum
sufficient which will make up the full security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified above is not paid
the tender contract already accepted shall be considered as cancelled. The security deposit lodged by
Contractor shall be refunded after the expiry of the Defects Liability period as shown in the attached
Memorandum after deducting dues, if any, which become liable to be recovered from the Contractor
under the terms and conditions of this Agreement.
Regarding remittance and release of Security Deposit (SD), Retention money deposit (RMD)
following clause will supersede over and above all the clauses depicted in the tender document.
Tender costing Less than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of which,
50% of amount as Initial Security Deposit shall be payable at the rate of 2% of approved tender
cost in form of Cash or Demand Draft/ Pay Order of any Nationalised Bank (encashable at Surat
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each running
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b) Release of SD/RMD
(i) The 2% Initial security deposit shall be released after clearance of Final bill by Audit Dept
and completion of defect liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be
released along with Final Bills according to Work Quality..
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
Tender costing Rs.2.00 Crore. & more than Rs.2.00 Crore.
(a) Remittance of SD/RMD
(i) The total security deposit shall be recovered at the rate of 4% from contractor. Out of which,
50% of amount as Initial Security Deposit shall be payable at the rate of 2% of approved tender
cost in form of in Cash or Demand Draft/ Pay Order / FDR / Bank Guarantee of any Nationalised
Bank (encashable at Surat city).
(ii) The remaining amount of the Security Deposit i.e. 2% to be deducted from each running
(iii) 5% Retention money deposit (RMD) to be retained from each running account bill.
(b 1) Release of SD/RMD
(i)The 2% Initial security deposit in form Demand Draft /Pay order / FDR shall be
released after clearance of Final bill by Audit Dept & completion of defect liability period.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be
released along with Final Bills according to Work Quality.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
(b 2) Release of SD/RMD
(i)The 2% Initial security deposit in form Bank Guarantee shall be released along with Final
Bills according to Work Quality.
(ii) Whereas, the 2% security deposit recovered from the each running account bills Shall be
released after clearance of Final bill by Audit Dept & completion of defect liability period.
(iii) 5% Retention money deposit (RMD) to be released along with final bill.
The amount recovered from the running bills as security deposit shall not be allowed to the transferred in
the form of Bank Guarantee. However, the remaining 50% (2% of Security Deposit) of the amount so,
deducted from running bills will be allowed for conversion in the form of interest bearing fixed deposit
receipt, (FDR) issued in favour of the Municipal Commissioner, Surat Municipal Corporation, Surat by a
Nationalized Bank located at Surat only. Additional stamp duty payable as per government prevailing
rule shall be paid by contractor for remittance of this FDR.
It is clarified that the amount of security deposit shall be collected on the basis of contract price and not
on the basis of Estimated Amount put to tender. As initial Security Deposit as mentioned above, accepted
by the competent Authority shall have to be paid toward Security Deposit at the time of execution of
Interest will be payable on FDR (that is deducted from Running Bill and converted in to FDR for initial
SD) for One year, after completion of work. After that no further interest shall be paid for any extended
period what so ever.
If the Security Deposit is not paid within 15 days from the date of L.O.I. / Work Order than penalty at the
rate of 0.065% per day of the amount of Security Deposit will charged. If the Security Deposit is not paid
within one month with interest, necessary actions as per condition of contract will be taken.
Initial Security Deposit ( i.e. 2% Of Tender Amount) in form of Bank Guarantee may be accepted
as per relevant tender provision, However BG shall be valid till final date of completion of
work+1year (Whether final bill is audited and paid or not).
It shall be contractor's responsibility to extent the BG On Or Before expiry of time limit of BG. In
case of late renewal of BG, penalty of security deposit shall be levied interest at the rate of 4.00%
per year of BG amount.(As per City Engineer note No.626,Dt.04/07/2022)
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper of Rs.
300/- if initial Security Deposite paid in form Bank Guarantee or Demand draft as per the form of
the agreement approved by the Municipal Corporation, Surat.
If initial Security deposit is paid in form of Fixed Deposit, additional stamp paper amounting As
per government’s prevailing rule of Security Deposit shall be used to execute the agreement.
The undertaking shall be executed on stamp paper worth Rs. 300/-.
The Surety shall be executed on stamp paper worth Rs. 300/-.
GC-11 INSPECTION OF WORK :
1. The Engineer in charge will have full power and authority to inspect the work at any time
wherever in progress either on the site or at the contractor's any other manufacturers workshops or
factories wherever situated and the contractor shall afford for Engineer-in-charge every facility and
assistance to carry out such inspection. Contractor or his authorized representative shall, at all time
during the usual working hours and all other times when so notified, remain present to receive orders
and instructions, orders given to Contractor's representative shall considered to have the same force as if
they had been given to the contractor himself. Contractor shall give not less than 7 days notice in
writing to the Engineer-in- charge before covering up or otherwise placing beyond reach of inspection
and measuring any work in order that the same may be inspected and measured. In the event of
breach of the above, the same shall be recovered at Contractor's expenses for carrying out such
inspection or measurement.
2. No material shall be dispatched from contract store on site of work before obtaining
approval in writing of the Engineer-in-charge, Contractor shall provide at all time during the
progress of work and maintenance period proper means of access with ladders, gangways, etc. and
the necessary attendance to move and adopt as directed for inspection or measurement of work by
Engineer-in-charge.
GC-12 DEFECT LIABILITY :
1. Contractor shall guarantee the work for a period of 12 months from the date of actual
completion of work as per completion certificate. Any damage or defect that may arise or that may
remain undiscovered at the time of issue of completion certificate connected in any way with the
equipment or materials supplied by him or in the workmanship be rectified or replaced by contractor
at his own expenses as desired by Engineer-in-charge or in default may cause the same to be made
good by other agency and deduct expenses of which the certificate of Engineer-in-charge shall be final
from any sums that may then or any time thereafter become due to contractor of sale thereof or of a
sufficient portion thereof.
2. From the commencement to completion of work contractor shall take full responsibility for
the case of the work including all temporary works and in case any damage, loss or injury shall happen
to work or any part thereof or to any temporary works from any cause whatsoever and shall at his own
cost repair and make good the same so that at completion work shall be in good order and in
conformity in every respect with the requirements of contract and as per the instructions of the
Engineer-in-charge.
3. If at any time before the work is taken over, the Engineer- in-charge shall -
(a) Decide that any work done or materials used by the contractor are defective or not in
accordance with contract or that work of any portion thereof is defective or do not fulfill the
requirements of contract (all such materials being hereinafter called defects in this clause and (b) as
soon as reasonably practicable given to contractor notice in writing of the said defect specifying
particulars of the defects alleged to exist or to have occurred, then contractor shall at his own
expenses and with all speed make good the defects so specified.
(b) In case contractor fails to do so, owner may take at the cost of the contractor, such steps
as may in all circumstances, be reasonable to make good such defects. The expenditure so incurred by
S.M.C. will be recovered from the amount due to contractor. The decision of Engineer-in-charge with
regard to the amount to be recovered from contractor will be final and binding on the contractor.
GC-13 POWER OF ENGINEER TO GIVE FURTHER INSTRUCTIONS :
The Engineer shall have the power and authority from time to time and at all times to give further
instructions and directions as may appear to him necessary or proper for the guidance of contractor
and the works and efficient execution of the works according to the terms of the specifications, and the
contractor shall receive, execute, obey and be bound by the same, according to the true intent and
meaning thereof, as fully and effectually as though the same had accompanied or had been mentioned or
referred to in the specifications. No work which radically changes the original nature of the contract
shall be ordered by the Engineer and in the event of any deviation being ordered, which in the opinion
of the contractor changes the original nature of the contract, the shall nevertheless carry it out and any
disagreement as to the nature of the work & the rate to be paid thereof shall be resolved. The time of
completion of works, in the event of any deviations, resulting in additional cost over the contract sum
being ordered, then be extended or reduced reasonable by the Engineer. The Engineer's decision in the
case shall be final and binding.
GC-14 PROGRAMME :
The time allowed for execution of works shall be essence of the contract. The contract period shall
commence from date of Notice of intimation to proceed. The tenderer at the time of submitting his tender
shall indicate the construction or pipeline schedule, the month-wise programme required for the execution
of the works and shall confirm the same within fourteen (14) days of the acceptance of his Tender.
The contractor shall provide to the Engineer-in-charge a detailed programme of time schedule for
execution of the works in accordance with the specifications & the completion date. The entire
programme to be finalized by the Contractor, has to confirm to the execution period mentioned along
with the Bill of Quantities in the Tender Documents. The Engineer upon scrutiny of such submitted
programme by contractor, shall examine suitability of it to the requirement of contract and suggest
modifications, if found necessary.
GC-15 SUBLETTING OF WORKS :
No part of the contract nor any share or interest thereon shall in any manner or degree be transferred,
assigned or sublet by the contractor directly or indirectly to any firm or Corporation whatsoever except
as provided for in the succeeding sub clause without the consent in writing of the owner.
GC-16 SUB-CONTRACTORS FOR TEMPORARY WORKS ETC. :
The owner may give written consent to sub-contractors for execution of any part of the work at the
site being entered upon by the contractors provided each individuals contractor is submitted to the
Engineer-in-charge before being entered into and in approved by him. List of Sub-Contractors is to
be supplied. Not with standing any subletting with such approval as aforesaid and not with standing the
Engineer-in-charge shall have received copies of any sub-contractors, the contractors shall be and shall
remain solely responsible for the quality and proper expeditions and execution of the works and the
performance of all the conditions of contract in all respects as if such submitting or sub-contracting had
not taken place and as if such work had done directly by the Contractor.
GC-17 TIME FOR COMPLETION:
1. The work covered under this contract shall be commenced from the date of contract is
served with a notice to proceed with the work and shall be completed before the date as mentioned
in the time schedule of work. The time is the essence of the contract and unless the same is extended as
mentioned in clause No. GC-18 (Extension of time) the contractor will be penalized for the delay.
2. The general time schedule for work is given in the tender document. Contractor shall prepare a
detailed weekly or monthly programme of work in consultation with Engineer-in-charge soon after
the agreement and the work shall be strictly executed accordingly. The time for as construction of
road given includes, the time required for testing, rectification if any, retesting and completion in all
respects to the entire satisfaction of the Engineer- in-charge.
GC-18 EXTENSION OF TIME :
Time shall be considered as the essence of the contract. If however, the failure of the
Contractor to complete the work as per the stipulated dates referred to above arises from delays on
the part of Municipal Corporation in supplying the materials of equipment it has undertaken to
supply under the contract or from delays in handing over sites or from increase in the quantity of work
to be done under the contract, or force Majeure an appropriate extension of time will be given. The
Contractor shall request such extension within one month of the cause of such delay and in any case
before expiry of the contract period.
GC-19 CONTRACT AGREEMENT :
The successful tenderer shall when called upon to do so, enter into and execute the Contract
Agreement within (10) Ten days of the Notice of Award, in the form shown in tender documents
with such modifications as may be necessary in the opinion of the Municipal Commissioner. It should
be incumbent on the contract to pay the stamp duty and the legal charges for the completion of the
contract agreement.
GC-20A. PENALTY FOR DELAY :
If the contractor fails to complete the work within the stipulated completion date for the work or
he shall pay liquidated damages at one tenth of Two percent of contract value per day of delay in
completion and handing over the work or part thereof as the case may to the Municipal Commissioner.
The amount of liquidated damages shall, however, be subjected to a maximum of ten (10) percent of
the contract value. Delays in excess of one hundred days will be a cause for termination of the contract
and forfeiture of all security for performance.
The successful tenderer shall have to submit the progress bar-chart within fifteen days after the
contract, and the contractor should work as per the approved bar-chart, failing which the contractor
shall have to pay the compensation for delay as per the decision of Municipal Commissioner.
GC-21 FORFEITURE OF SECURITY DEPOSIT :
Whenever any claim arises against the contractor for the payment of a sum of money out of or under the
contract, the owner shall be entitled to recover such sum by appropriating in part of whole, the security
deposit of the contractor. In case the Security deposit is insufficient the balance recoverable shall be
deducted from any sum then due or which at any time thereafter may become due to the contractor
shall pay to the owner on demand may balance remaining due.
GC-22 ACTION OF FORFEITURE OF SECURITY DEPOSIT :
In any case in which under any clause or clauses of the contract, the contractor shall have forfeited
the whole of his Security deposit or have committed a breach of any of the terms contained in this
contract, the owner shall have power to adopt any of the following courses as he may deem best
suited to his interest -
(a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of
the owner shall be conclusive evidence) in which case, the security deposit of the contractor shall stand
forfeited and be absolutely at the disposal of the owner.
(b) To employ labour and to supply materials to carry out the balance work debiting contractor with the
cost of labour employed and the cost of materials supplied for which a certificate of the Engineer-in-
charge shall be final and conclusive against the contractor and 10% costs on above to cover all
departmental charges and crediting him with the value of work done at the same rates as if it has
been carried out by the contractor under the terms of his contract. The certificate of Engineer-in-
charge as to the value of the work done shall be final and conclusive against the contractor.
(c) To measure up the work of the contractor and to take such part hereof as shall be unexecuted out of
his hand to give it to another contractor to complete. In this case the excess -expenditure incurred
than what whole have been paid to the original contractor, if the would work had been executed by
him, shall be earnest and paid by the original contractor and shall be deducted from any money due
to him by the owner under the contract or otherwise and for the excess expenditure, the certificate of the
Engineer- in-charge shall be final and conclusive.
In the event any of the above course being adopted by the owner, the contractor shall have no claim to
compensation for any less sustained by him by reason of his having purchased or procured any
materials or entered into any agreement so or made by advance on account of or with a view to the
execution of the work of the performance of the contract. In such case the contractor shall not be
entitled to recover or be paid by sum for any work actually performed under this contract unless the
Engineer-in-charge will certify in writing the performance of such work and the value payable in
respect thereof and the shall only be entitled to be paid the value so certified. In the event of the owner
putting in force the powers as stated in a, b, c, above vested in him under the preceding clause, he
may, if he so desire, take possession of all or any tools and plant, materials and stores in or upon the
work or the site thereof belonging to the contractor, or procured by him and intended to be used for
the execution of the work or any part thereof paying or allowing for the same in account at the contract
rates to be certified by the Engineer-in-charge whose certificate thereof shall be final otherwise the
Engineer-in-charge may give notice in writing to the contractor or his representative requiring him to
remove such tools plant materials or stores from the premises within the time specified in the notice
and in if the contractor fails to comply with any such notice, the Engineer-in-charge may remove them
at the Contractor's expenses or sell them by auction or private sale on account of the contractor and his
risks in all respects without any further notice as to the date, time to place of the sale and the
certificate of Engineer-in-charge as to the expenses of any such removal and the amount of the
proceeds and the expenses of any such sale shall be final and conclusive against the contractor.
GC-23 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK :
If at any time from the commencement of work, the owner shall for any reasons whatsoever not require
the whole or part thereof a specified in the tender to be carried out, the Engineer-in- charge shall give
notice in writing of the contractor, who shall have no claim to any payment or compensation
whatsoever on account of any profit or advantage which he might have derived from execution of work
in full, but which he did not derive in consequence of the full amount of the work not having been
carried neither shall be have any claim for compensation by reason if any alternations having been
made in original specifications, drawings, designs and instructions which shall involve any curtailment
of the work as originally contemplated.
When the contractor is a partnership firm, the prior approval in writing of the S.M.C.shall be obtained
before any change is made in the constitution of the firm, where the contractor is an individual or a
Hindu Undivided Family business concern, such approval as aforesaid shall, likewise be obtained
before sub- contractor enters into any agreement with other parties where under the reconstituted
firm would have the right to carry out the work hereby undertaken by the contractor. In either case if
prior approval as aforesaid is not obtained, the contract shall be deemed to have been allotted in
contravention of sub- letting clause hereof and the same action may be taken and the same consequence
shall ensure as provided in the sub-letting clause.
GC-24 IN EVENT OF DEATH OF CONTRACTOR :
Without prejudice to any of the right or remedies under the contract, if the contractor dies, the
owner shall have the option of terminating the contract without compensation to the contractor.
GC-25 MEMBER OF THE OWNER NOT INDIVIDUALLY LIABLE :
No official or employee of the owner shall in any way be personally bound or liable for the acts
or obligations of the owner under the contract or answerable for any default or omission in the
observance or performance of the acts, matters or things which are herein contained.
GC-26 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS :
The contractor shall not be entitled to any increase on the Schedule of rates or any other rights or
claims whatsoever by reason of representation, explanation or statement or alleged representation,
promise or guarantees given or alleged to have been given to him by any person.
GC-27 CONTRACTOR'S OFFICE AT SITE :
The Contractor shall provide and maintain an office at the site for the accommodation of his agent and
staff and such office shall be opened at all reasonable hours to receive instructions, notice or other
communications.
GC-28 CONTRACTOR'S SUBORDINATE STAFF AND THEIR CONDUCT :
1. The contractor on award of the work shall name and depute a qualified Engineer, having experience
of carrying out work of similar nature, to whom equipment’s, materials, if, any, shall be issued and
instructions for work given. The contractor shall also provide to the satisfaction of Engineer in-
charge sufficient and qualified staff to superintend the execution of the work, competent sub-
agents, foremen and leading hands including those specially qualified by previous expeditions to a
supervise the type of works comprised in the contract in such manner as will ensure work of the best
quality and expeditions working, it, in the opinion of the Engineer-in-charge, additional properly
qualified supervision staff is considered necessary, if shall be employed by the contractor without
additional charge on account thereof. The contractor shall ensure to the satisfaction of the Engineer- in-
charge that sub - contractors, it any shall provide competent and efficient supervision over the work
entrusted to them.
2. If and whenever any of the contractor 's or sub-contractor agents, sub-agents, assistance, foremen or
other employees shall, in the opinion of Engineer-in-charge, be guilty of any misconduct or be
incompetent or insufficiently qualified or intelligent in the performance of their duties or that in opinion
of the owner or Engineer-in-charge, it is undesirable for administrative or any other reason for person or
persons to be employed in the works, the contractor, if so directed by the Engineer-in-charge, shall at
once remove person or persons from employment thereon. Any person or persons so removed shall not
again be reemployed in connection with the works without the written permission of the Engineer-in-
charge. Any person so removed from the works shall be immediately replaced at the expenses of
the contractor by acqualified and competent substitute. Should the contractor be required to repatriate
any person removed from the works he shall do so and shall bear all costs in connection therewith.
3. The contractor shall be responsible for the proper behavior of all the staff, foremen, workmen and
others shall exercise proper control over them and in particular and without prejudice to the same.
Generally, the contractor shall be bound to prohibit, and prevent any employee from trespassing or acting
in any way detrimental or prejudicial to the interest of the community or of the properties or occupiers
of land and properties in the neighborhood and in the event of such employees so trespassing, the
contractor shall be responsible therefore and relieve the owner of all consequent claims, actions for
damages or injury or any other grounds whatsoever. The decision of the Engineer-in- charge upon any
matter arising under this clause shall be final.
4. If and required by the owner, the contractor's personnel entering upon the owner's premises shall
be properly identified by badges of a type acceptable to the S.M.C. which must be worn at all times
on owner's premises.
GC-29 TERMINATION OF SUB-CONTRACTOR BY OWNER :
If any sub-contractor engaged upon the works at the site executes any work which in the opinion of
Engineer-in-charge is not in accordance with the contract documents, the S.M.C. may be give written
notice to the contractor request his to terminate such sub-contract and the contractor upon the receipt of
such notice shall terminate such sub-contract and the letter shall forthwith leave the works failing which
the owner shall have the right to remove such sub-contractors from the site.
No action taken by the owner under the above clause shall relieve the contractor of his liabilities
under the contract or give rise to any right to compensation, extension of time or otherwise.
GC-30 POWER OF ENTRY :
If the contractor shall not commence the work in the manner previously described in the contract
documents or if he shall, at any time, in the opinion of Engineer-in-charge.
(i) Fail to carry out works in conformity with the documents or
(ii) Fail to carry out the works in accordance with the time schedule.
(iii) Substantially suspend work or the works for a period of fourteen days without authority from
Engineer-in-charge or
(iv) Fail to carry out and execute the work to the satisfaction of the Engineer-in-charge or
(v) Fail to supply sufficient or suitable construction plant, temporary works, labour, materials or things
(vi) Commit breach of any other provisions of the contract on his part to be performed or observed or
persist in any of the above mentioned breaches of the contract for fourteen days after notice in writing
shall have been given to the contractor by the Engineer-in-charge requiring such breach to be remedied or
(vii) Abandon the work or
(viii) During the continuance of the contract becomes bankrupt, make any arrangement or compromise
with his creditors, or permit any execution to be levied or go into liquidation whether compulsory or
voluntary not being merely a voluntary liquidation for the purpose of amalgamation or
reconstruction then in any such case.
The owner shall have the power to enter upon the works and take possession thereof and of the
materials, temporary works, constructional plant and stock therein, and to revoke the contractor's
license to use the same and to complete the works by his agents, other contractor or workman or to
relate the same upon any terms and to such other person, firm or corporation as the owner in his absolute
discretion may think proper to employ, and for the purpose aforesaid to use or authorize the use of any
materials, temporary works, constructional plant, and stock as aforesaid, without making payment or
allowance to the Contractor for the said materials other than such as may be certified in written by the
Engineer-in-charge to be reasonable and without making any payment or allowance to the contractor for
the use of said temporary works, constructional plant and stock or being liable for any less or damage
thereto. If the owner shall be reason of his taking possession of the works or of the work being got
completed by other contractor incur excess certified by the Engineer-in-charge shall be deducted from
any money which may be due for the work done by the contractor under the contract and not paid
for. Any deficiency shall forthwith be made good and paid to the owner by the contractor and the owner
shall have power to sell in such manner and for such price as he may think fit all or any of the
constructional plant, materials etc. constructed by or belonging to and recoup and retain the said
deficiency or any part thereof out of the proceeds of the sale.
GC-31 CONTRACTOR'S RESPONSIBLITY WITH THE OTHER CONTRACTOR & AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor executing the
work of civil construction to work in close co-operation and co-ordinate the work with other
contractors or their authorised representative and the contractor will put a joint scheme with the
concurrence of other contractors showing the arrange-ments for carrying his portion of the work to the
Engineer-in-charge and get the approval. The Engineer-in-charge before approving the joint scheme
will call the parties concerned and modify the scheme if required. No claim will be entertained on
account of the above. The contractor shall conform in all respects with the provisions of any
statutory regulations, ordinances or by laws of any local or locally constituted authorities or public
bodies which may be applicable from time to time to works or any temporary works. The contractor
shall keep the owner indemnified against all penalties and liabilities of every kind arising out of
non-adherence to such statutes, ordinance, laws, rules, regulations, etc.
GC-32 OTHER AGENCIES AT SITE :
The Contractor shall have to execute the work in such place and condition where other agencies will
also be engaged for other works, such as site grading, filling and levelling, electrical and mechanical
engineering works, etc. No claim shall be entertained for works being executed in the above
GC-33 NOTICES :
Any notice under this contract may be served on the contractor or his duly authorised representative at
the job site or may be served by registered post direct to the official address of the contractor proof of
issue of any such notice could be conclusive of the contractor having been duly informed of all
contents therein.
GC-34 RIGHT OF VARIOUS INTERESTS :
The owner reserves the right to distribute the work between more than one contractor. Contractor shall
co-operate and afford reasonable opportunity to other contractors for access to the works for the
carriage and storage of materials and execution of their works.
Wherever the work being done by any department of the owner or by other contractor employed by
the owner is contingent upon work covered by this contract, the respective rights of the various
interests shall be determined by Engineer-in-charge to secure the completion of various portions of the
work in general harmony.
GC-35 PRICE ADJUSTMENT :
No adjustment in price shall be allowed as the time limit for completion of the project is less than One
GC-36 TERMS OF PAYMENT :
The payment of Bills shall be made progressively according to the rules and practice followed by the
Municipal Corporation. The progressive payment unless otherwise provided in the Contract
Agreement or subsequently agreed to by the parties, shall be made generally monthly on submission
of a bill by the Contractor in prescribed form in an amount according to the value of the work
performed less the aggregate of previous progressive payments and as required by clause GC-37
(Retention money) herein. All such progressive payment shall be regarded as payment by way of advance
against final payment.
Payment for the work done by the contractor will be based on the measurement at various stages of
the work, in accordance with the conditions at Clause GC-77 (Measurement of Work in Progress)
GC-37 RETENTION MONEY :
Pursuant to Clause GC-36 Terms of Payment) on all money due to the contractor for work done,
Municipal Corporation will hold as retention money of Seven percent (5% + 2%) of the value of work.
The retention money will not normally be due for payment until the completion of the entire work and
till such period the work has been finally accepted by the Municipal Corporation and completion
certificate issued by the Municipal Corporation in pursuant to Clause No.GC-83 (Completion
However, after the assurance of completion certificate, and Municipal Commissioner may at its own
discretion and having considered the Contractor's performance and diligence during the contract time
allow the retention money to converted into a Bond as stipulated in the Clause GC-10 (Performance
Bond Security Deposit).
GC-38 PAYMENT DUE FROM THE CONTRACTOR :
All costs, damages or expenses, for which under the Contract the Contractor is liable to the Municipal
Corporation deducted by the Municipal Corporation from any money due or becoming due to the
Contractor under the contract or from any other contract with the Municipal Corporation or may be
recovered by action at law or other-wise from the Contractor.
GC-39 CONTINGENT FEE :
1. The Contractor warrants that he has not employed any person to solicit or secure the contract upon
any agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty
shall give the Municipal Commissioner the right to cancel the contract or to take any other measure as
the Municipal Commissioner may deem fit. The warranty does not apply to commissions payable by
the contractor to establish commercial or selling agent for the purpose of securing business.
2. No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or
to any benefit that may rise therefrom.
GC-40 BREACH OF CONTRACT BY CONTRACTOR :
If the contractor fails to perform the work under the contract with due diligence or shall refuse or
neglect to comply with instruction given to him in by the Engineer-in-charge accordance with the
contract, or shall contravene the provisions of the contract, the S.M.C. may give notice in writing to the
contractor to make good such failure, neglect or contravention. Should the Contractor fail to comply with
such written notice within twenty eight (28) days or receipt, if the Municipal Commissioner shall think
fit, it shall be lawful for the Municipal Corporation, without prejudice to any other rights, the
contractor may have under the contract, to terminate the contract for all or part of the works, and to
make any other arrangements it shall deem necessary to complete the work outstanding under the
contract at the time of termination. In this event Article GC-15 (Subletting of work)and GC-16 (Sub-
Contracts for Temporary Works etc.)hereof shall be invoked and the performance Bond shall
immediately become due and payable to the Municipal Commissioner the value of the work done on the
date of termination and not paid for shall stand forfeited to the Municipal Corporation and the
Municipal Corporation shall have free use of any works which the contractor may have at the site at the
time of termination of the contract.
GC-41 DEFAULT OF CONTRACTOR :
1. The Municipal Corporation may upon written notice of default to the contractor terminate the
contract in circumstance detailed hereunder :
(a) If in the judgement of the Municipal Corporation the contractor fails to make completion of
works within the time specified in the completion schedule or within the period for which extension has
been granted by the Municipal Corporation /Engineer to the Contractor.
(b) If in the judgement of the Municipal Corporation the contractor fails to comply with any of the
provisions of this contract.
2. In the event the Municipal Commissioner terminates the contract in whole or in part as
provided in Article GC-48 (Termination of Contract), the Municipal Corporation reserves the right to
purchase upon such terms and in such manner as it may deem appropriate, plant similar to that terminated
and the contractor will be liable to the Municipal Corporation for any additional costs for such
similar and / or for liquidated damaged for delay until such reasonable time as may be required for the
final completion of works.
3. If this contract is terminated as provided in this paragraph GC - 30 (Power of entry) (1) the
Municipal Corporation in addition to any other rights provided in this clause, may require the
Contractor to transfer title and deliver to the Municipal Corporation under any of the following cases
in the manual and as directed by the Municipal Corporation. (a) Any partially completed information
and contract rights as the contractor has specifically produced or acquired for the performance of the
contract so terminated.
4. In the event the Municipal Corporation does not terminate the contract as provided in the
paragraph GC- 48 (Termination of Contract) the Contractor shall continue performance of the
contract, in which case the shall be liable to the Municipal Corporation for liquidated damages for
delay until the works are accepted.
GC-42 BANKRUPTCY :
If the Contractor shall become bankrupt or insolvent or have a receiving order made against him, or
compound with the creditors, or being the Municipal Corporation commence to be wound up, not
being a member's Voluntary winding up for the purpose of amalgamation or reconstruction, or carry
on its business under a receiver for the benefit of his creditors or any of them, the owner shall be at
liberty to either (a) terminate the contract forthwith by giving notice in writing to the contractor or
to the receiver or liquidator or to any person or organization in whom the contract may become vested
and to act in the manner provided in Article GC-41 (Default of Contractor) as though the last
mentioned notice had been the notice referred to in such Article of (b) to give such receiver liquidator
or other person in work the contract may become vested the option of carrying out the contract
subject to his providing a satisfactory guarantee for the due and faithfully performance of the contract
subject to his providing a satisfactory guarantee for the due and faithful performance of the contract
upto an amount to be agreed. In the event that the Municipal Corporation terminates the Contract in
accordance with this article, the performance Bond shall immediately become due and payable on
demand to Municipal Corporation.
GC-43 OWNERSHIP :
Works supplied pursuant to the Contract shall become the property of the Municipal Corporation
from whichever is the earlier of the following times, namely,
(a) When the works are completed pursuant to the Contract.
(b) When the Contractor has been paid any sum to which he may become entitled in respect thereof
pursuant to clause GC-36 (Terms of Payment).
GC-44 DECLARATION AGAINST WAIVER :
The condonation by the Municipal Corporation of any breach of breaches by the stipulations and
conditions contained in the contract shall in no way prejudice or effect to the constructed as a waiver of
the Municipal Corporation rights, powers and remedies under the contract in respect of any breach
GC-45 LAWS GOVERNING THE CONTRACT :
The contract shall be constituted according to and Subject to the laws of India and the State of
Gujarat and under the jurisdiction of the courts of Gujarat at Surat.
GC-46 OVERPAYMENT AND UNDERPAYMENT :
Whenever any claim forth payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any sum
then due or which at any time thereafter may become due to the contractor under this contract and failing
that under any other contract with the Municipal Corporation or from any sum due to the contractor
with the Municipal Corporation (which may be available with Municipal Corporation), or from his
retention money, or he shall pay the claim on demand. The Municipal Corporation reserves the
right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected no withstanding the fact that the amount of the final bill may be included by the Contractor.
It as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall
be recovered by the Municipal Corporation from the contractor by way of all the means prescribed
above or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or which
may at any time thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
GC-47 SETTLEMENT OF DISPUTES :
Except or otherwise specifically provided in the contract, all disputes concerning questions of fact
arising under the contract shall be decided by the Commissioner, subject to a written appear by the
Contractor to the Commissioner, and these decisions shall be final and binding to the contractor.
GC-48 TERMINATION OF THE CONTRACT:
1. If the Contractor finds it impracticable to continue operation owing to Force Majeure reasons or for
any reason beyond his and/or the Municipal Commissioner find site impossible to continue operation
when prompt notification in writing shall be given by the party affected to the other.
2. If the delay or difficulties so caused can not be expected to cease or become unavoidable or if
operations can not be resumed within six(6) months the party shall have the right to terminate the
contract upon Ten (10) days written notice to the other. In the event of such termination of the
contract, payment to the Contractor will be made as follows :
a) The Contractor shall be paid for all works approved by the Engineer and for any other legitimate
expenses due to him.
b) If the Municipal Commissioner terminates the contract owing to Force Majeure or due to any cause
beyond its control, the contractor shall additionally be paid for any work done during the said Six (6)
months period including any financial commitment made for the proper performance of the Contract
and which are not reasonable defrayed by payment under (a) above;
c) The Municipal Commissioner also release all bonds and guarantees at its disposal except is cause
where the total amount of payments made to the contractor exceeds the final amount due to him in which
where the total amount of payments made to the contractor exceeds the final amount due to him in which
case the contractor shall refund the excess amount within Sixty (60) days after termination and the
Municipal Commissioner thereafter shall release all bonds and guarantees, should the contractor fail to
refund the amount received in excess within the said period such amounts shall be deducted from the
bonds or guarantees provided.
3. On the termination of the contract for any cause the contractor shall see the orderly suspension
and termination of operations, with due consideration to the interests of the Municipal Corporation
with respect to completion, safeguarding or storing of materials procured for the performance of the
contract and the salvage and resale thereof.
GC-49 CHANGES IN CONSTITUTION :
Where the contractor is a partnership firm, the prior approval in writing of the Municipal Commissioner
shall be obtained any change is made in the constitution of the firm. Where the contractor is an
individual or an undivided family business concern such approval as aforesaid shall like wise be
obtained before the contractor enters into any partnership agreement where under the partnership firm
would have the right to carry out the works hereby undertaken by the contractor. If prior approval as
aforesaid is not obtained the contract shall be deemed to have been assigned in contravention of Article
GC-50 SUB-CONTRACTUAL RELATIONS :
All work performed for the contract by sub-contractor shall be pursuant to an appropriate agreement
between the contractor and sub-contractor which shall contain provisions to :
a) Protect and preserve the rights of the Municipal Corporation and the Engineer with respect to
the work to be performed under the sub-contract so that the sub-contractor thereof will not prejudice such
b) Require that such work be performed in accordance with requirements of the Contract
c) Require under such contract of which the contractor is a party, the submission to the
contractor of application for payment and claims for additional costs, extension of time, damages for
delay or otherwise with respect to the sub- contracted portions of the work in sufficient time, that the
contractor may apply for payment and comply in accordance with the contract Documents for like claim
by the Contractor upon the Municipal Corporation.
d) Waive all rights the contracting parties may have against one another for damages caused by fire
or other perils covered by the property insurance except such rights as they may have to the proceeds
so such insurance held by the Municipal Corporation as trustee and,
e) Obligate each sub-contractor specifically to consent to the provisions of this Article.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable
and which is chargeable to the contractor, the owner shall have the right to retain out of any payment
then due or thereafter to become due an amount sufficient to completely indemnify the owner
against such lien or claim or if such lien or claim be valid the owner may be or become due and
payable to the contractor. If any lien or claims remaining, unsettled after all payments are made, the
contractor shall refund or pay to the owner all money that the latter may be compelled to pay in
discharging such lien or claim including all cost and reasonable expenses.
GC-52 EXECUTION OF WORK :
The whole work shall be carried out in strict conformity with the provisions of the Contract Documents,
detailed drawings, specifications and the instructions of the Engineer-in-charge from time to time. The
Contractor shall ensure that the whole work is executed in the most substantial, proper and best
workmanship using materials of best quality in strict accordance with the specifications to the entire
satisfaction of the Engineer-in- charge.
GC-53 WORK IN MONSOON :
When the work continues in monsoon, the contractor shall maintain minimum labour force required, for
the work and plan and execute the construction and erection work according to the prescribed schedule.
No extra rate will be considered for such work in monsoon. During monsoon and entire
constructing period the contractor shall keep the site free from water at his own cost.
GC-54 WORK CLOSED ON SUNDAYS & HOLIDAYS & BETWEEN SUNSET AND SUNRISE:
No work shall be carried out on Sundays and Corporation Holidays and no work shall be carried out
between sunset and sunrise. Except with the special permission of Engineer-in-charge in writing
previously obtained and with holding such permissions shall be no ground of complaint on the part of
contractor or cause for compensation to them. Working period shall be maximum eight (8) hours per
GC-55 EXTRA SUPERVISION CHARGES TO BE BORNE BY CONTRACTOR :
Further to clause No.GC-54 when Engineer-in-charge feels necessary to give permission to contractor
for carrying out work for period of more than Eight hours working period in a day and/or to continue
work on Sunday and Corporation holidays. Extra Supervision charges arising due to overtime working of
Corporation's staff shall be borne by the contractor at prevailing rates from time to time. Such extra
supervision charges shall be deducted by Corporation from the running bill/s of the contractor at Surat
Municipal Corporation's description.
GC-56 DRAWING TO BE SUPPLIED BY THE OWNER :
The drawings attached with the tender documents shall be for general guidance of the contractor to
enable him to visualize the type of work contemplated and scope of work involved. Detailed working
drawings according to which the work is to be done shall be furnished from time to time as the work
progresses. The contractor shall study the drawings thoroughly in connection with other connected
details and discrepancy if any bring to the notice of the Engineer-in-charge before actually carrying
GC-57 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR :
Where drawings, date are to be furnished by the contractor they shall be as enumerated in special
condition of contract and shall be furnished within the specified time. Where approval of drawings
has been specified it shall be the Contractor's responsibility to have these drawings got approved
before any work is taken up with regard to the same. Any changes becoming necessary in these
drawings during the execution of the work shall have to be carried out by the contractor at no extra cost.
All final drawings shall bear the certification stamp as indicated below duly signed by both the contractor
and Engineer- in-charge.
"Certified true for ___________________________________project Agreement
Contractor Engineer-in-charge Drawings will be approved within three (3) weeks of the receipt of the
same by the Engineer-in-charge.
GC-58 SETTING OUT WORK :
The contractor shall set out the work on the site handed by the Engineer-in-charge and shall be
responsible for the correctness of the same. The work shall be carried out to the entire satisfaction of
Engineer-in-charge. The approval thereof or partaking by Engineer-in-charge in setting out work shall
not relieve contractor of any of his responsibilities.
The contractor shall provide at his own cost all necessary level posts, pegs, bamboos, flage, ranging,
rods, strings and other materials and labourers required for proper setting out of the work. The
Contractor shall provide, fix and be responsible for the maintenance of all stakes, temples level marks
profiles and similar other things and shall take and necessary precautions to prevent their removal or
disturbance and shall be responsible for the consequence for such removal or disturbance. The contractor
shall also be responsible for the maintenance of all existing Survey Marks, Boundary Marks, Distance
Marks and Centre line marks either existing or fixed by the Contractor. The Centre, longitudinal or
face lines and cross lines shall be marked by small masonry pillars. Each pillar shall have distance
mark at the centre for setting up the theodolite. The work shall not be started unless the setting out is
checked by Engineer-in-charge in writing but such approval shall not relive the contractor of his
responsibilities. The contractor shall provide all materials, labour and other facilities necessary for
checking at his own cost.
Pillars bearing geodetic marks on site shall be protected by the Contractor. On completion of the work
the contractor shall submit the Geodetic documents according to which the work has been carried out.
GC-59 RESPONSIBILITIES OF CONTRACTOR FOR CORRECTTNESS OF WORK:
The contractor shall be entirely and exclusively responsible for the correctness of every part of the
work and shall rectify completely and errors thereon at his own cost when so instructed by Engineer-in-
1. Materials to be supplied by Contractor :
Contractor shall procure and provide all the materials required for the execution and maintenance of
work including M.S. rods, all tools, tackle, construction plant and equipment except the materials to be
supplied by the owner detailed in the contract documents and for the transport thereof, owner, shall
made recommendations to the respective authorities if designed by the contractor but assumes no
responsibility or any nature. Owner shall insist for procurement of materials with ISI Marks supplied
by reputed firms on the DGS & D List. 2. If however the Engineer-in-charge feels that work is likely to
be delayed due to contractor's inability to procure the materials, the Engineer-in-charge shall have
the right to procure materials from the market and the contractor will accept these materials at the rates
decided by Engineer-in-charge
GC-60 MATERIALS TO BE SUPPLIED BY THE OWNER :
1. If the contract provides certain materials or stores to be supplied by the S.M.C. such
materials and stores shall be transported by the contractor at his cost from S.M.C's stores or Railway
Station. The sum due from contractor for the value of materials supplied by the owner will be
recovered from the R.A.Bill on the basis of actual consumption of materials in the work covered and for
which R.A.Bill has been prepared. After completion of the work contract has to account for the full
quantity of materials supplied to him.
2. The value of store materials supplied by the S.M.C. to the contract shall be charged at rates
shown in the contract document and in case any other material not listed in the schedule of materials
is supplied by the S.M.C., the same shall be charged at cost price including carting and other expenses
incurred in procuring the same. All materials so supplied shall remain the property of the owner and
shall not be removed from the site on any account. Any material remaining un-used at the time of
completion of work or termination of contract shall be returned to S.M.C.'s store or any other place
as directed by the Engineer-in-charge in perfectly good condition at contractor's cost. When materials are
supplied free of cost for us in work and surplus and unaccounted balances thereof are not returned
to the Municipal Corporation, recovery in respect of such balance will be effected at double the
applicable issue rate of the materials or the market rate whichever is higher.
GC-61 CONDITIONS OF ISSUE OF MATERIALS BY THE S.M.C.:
a) The materials specified to be issued by the S.M.C. to the contractor shall be issued by the
S.M.C.'s store or at Railway Station and all expenses for its shifting to site shall be borne by the
contractor. The materials will be issued during working hours and as per rules of S.M.C. from time to
b) Contractor shall bear all expenses for storage and safe custody at site of materials issued to
him before use in work.
c) Material shall be issued by the S.M.C.in Standard/non-standard sizes as obtained from
d) Contractor shall construct suitable godowns at site for storing the materials to protect the
same from damage due to rain, dampness, fires, theft etc.
e) The contractor should take the delivery of the materials issued by the S.M.C. after satisfying
himself that they are in good conditions. Once the materials are issued, it will be the responsibility of
the Contractor to keep them in good condition and in safe custody. If the materials get damaged or if
they are stolen, it shall be the responsibility of the contractor to replace them at his according to the
instructions of the Engineer-in-charge.
f) For delay in supply or for non supply of materials to be supplied by the S.M.C., on account of
natural calamities, act of enemies, other difficulties beyond the control of the S.M.C., the S.M.C.
carries non-responsibilities. In no case the contractor shall be entitled to claim any compensation for
loss suffered by him on this account.
g) None of the materials issued to the contractor, shall be used by the Contractor for manufacturing
items which can be obtained from manufacturer. The materials issued by the owner shall be used for the
work only and no other purpose.
h) Contractor shall be required to execute indemnity bond in the prescribed form for the same custody
and account of materials issued by the owner.
i) Contractor shall furnish sufficiently in advance a Statement of his requirements of quantities of
materials to be supplied by the S.M.C. and the time when the same will be required for the work, so as
to enable Engineer-in-charge to make arrangements to procure and supply the materials.
j) A daily account of materials issued by the owner shall be maintained by the Contractor showing
receipt, consumption and balance in head in the form laid down by Engineer-in-charge with all
connected paper and shall be always available for inspection in the site office. k) Contractor shall see that
only the required quantities of materials are got issued and no more. The contractor shall be
responsible to return the surplus materials in good condition at S.M.C.'s store at his own cost.
GC-62 MATERIALS PROCURED WITH ASSISTANCE OF THE OWNER :
Notwithstanding anything contained to the contrary in any of the clauses of this contract, where any
materials for the execution of the contract are procured with the assistance of the S.M.C. either by issue
from S.M.C. stock or purchase made under orders or permits or licenses issued by the Government, the
contractor shall hold the same materials as trustees for owner and use such materials economically and
solely for the purpose of contract and not dispose them off without the permission of S.M.C.and return, if
required by Engineer-in-charge, all surplus or unserviceable materials that may be left with him after the
completion of the contract or at its termination for any reason whatsoever on his being paid or credited
such prices as Engineer-in-charge shall determine having due regard to the conditions of the materials.
The price allowed to contractor shall not exceed the amount charged to him excluding the storage
charges if any. The decision of Engineer-in-charge shall be final and conclusive in such matters. In
the event of breach of the aforesaid condition, the contractor shall in terms of license of permits and/or
for criminal breach of trust be liable to compensate S.M.C. at double rate or any higher rates. In the event
of these materials at that time having higher rate or not being available in the market then any other rate
to be determined by the Engineer-in-charge and his decision shall be final and conclusive.
GC-63 MATERIALS OBTAINED FROM DISMANTLING :
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons
other than on account of bad or imperfect work, the materials obtained from dismantling will be the
property of the S.M.C. and will be disposed of as per instruction of Engineer-in-charge in the best
interest of the S.M.C.
GC-64 ARTICLE OF VALUE OR TREASURE FOUND DURING CONSTRUCTION:
All gold, silver and other minerals of any description and all previous stones, coins, treasures, relics,
antiquities and other similar things which shall be found in under or upon site shall be the property of
the owner and the contractor shall property preserve the same to the satisfaction of Engineer-in-charge
and shall hand over the same to the owner.
GC-65 DISCREPANCIES BETWEEN INSTRUCTIONS :
If there is any discrepancy between the various stipulations of the contract documents of instructions to
the contractor or his authorised representative or if any doubt arises as in the meaning of such
stipulation or instructions, the contractor shall immediately refer in writing to the Engineer-in-charge
whose decision shall be final and conclusive and no claim for losses caused by such discrepancy, shall
in any event be admissible.
Incase there is any discrepancy in measurements showing drawing and specifications, the same shown in
drawing shall be considered as final and will be binding upon the contractor.
GC-66 SCHEDULE OF QUANTITIES AND EXTRA ITEMS :
A. Schedule of Quantities :
Variations in the quantities of work in schedule of quantities shall not vitiate the contract. The rates
quoted for the individual items shall apply for the quantities of work increased or decreased by not
more than twenty percent for each of the items, should the quantities of work actually involved under
any item vary by more than thirty (30%)percent, the rate for such item of work shall be revised in
accordance with the procedures indicated under clause "Extra Items". The payment for the items will,
however, continue to be at the original rate till the revised rate decided.
B. Extra Items :
Extra Items of work shall not vitiate the contract. The contractor shall be bound to execute extra
items of work as directed by the Engineer-in-charge. The rates for extra items shall be derived
from the S.O.R.(R&B Division) Year 2024-2025 and quoted premium of tender. If the rate of extra
item is not available in S.O.R. it will be derived on prevailing market rate.
GC-67 ACTION WHEN NO SPECIFICATION IS ISSUED :
In case of any class of work for which no specification is supplied by the S.M.C. in the tender
documents, such work shall be carried out in accordance with I.S.S. do not cover the same, the work
should be carried out as per standard Engineering practice subject to the approval of Engineer-in-
GC-68 ABNORMAL RATES :
Contractor is expected to quote rate for each item after careful analysis of cost involved for the
performance of the completed item considering all specifications and conditions of contract. This will
avoid loss of profit or gain in case of curtailment or change or specification for any item. In case it is
notice that the rates quoted by a tenderer for any item is usually high or unusually low, it will be
sufficient cause for rejection of tender unless the S.M.C. is convinced about the reasonableness of
the rates on scrutiny of the analysis for such rate to the furnishing by the tenderer or demand.
GC-69 ASSISTANCE TO ENGINEER-IN-CHARGE :
Contractor shall make available to Engineer-in-charge free of cost all necessary instruments and
assistance in checking of any work made by the contractor for taking measurement of work.
GC-70 TEST OF QUALITY OF WORK :
1. All workmanship shall be of the best kind described in the contract document and in accordance
with the instructions of Engineer-in-charge and shall be subjected from time to time to such test at
contractor's cost as the Engineer-in-charge may directed at the place of manufacture of fabrication or on
site or at any such place. Contractor shall provide assistance, instruments labour and materials as are
normally required for examining measuring and testing any work workmanship as may be selected and
required by Engineer-in-charge.
2. All tests will be necessary in connection with the execution of work as decided by Engineer-in-charge
shall be carried out at an approved laboratory at contractor's cost.
3. The contractor shall furnish to Engineer - in - charge for approval when requested or if required by
the specification adequate samples of all materials and finished goods to be used in work and
sufficiently in advance to permit test and examination thereof. All materials furnished and finished
goods applied in work shall be exactly as per the approved samples.
4. All the testing charges shall be borne by the Contractor.
GC-71 ACTION AND COMPENSATION IN CASE OF BAD WORKMANSHIP :
If it shall appear to the Engineer-in-charge that any work has been executed with materials of inferior
description, or quality or are unsound or with unsound imperfect or unskilled workmanship or otherwise
not in accordance with the contractor shall, no demand in writing from Engineer-in-charge or his
authorised representative specifying the work, materials or articles companied of, notwithstanding
that the same may have been inadvertently passed, certified and paid for forthwith rectify or remove
and reconstruct the work, specified and in the event of failure to do so within a period to be specified
by Engineer- in-charge in his aforesaid demand, contractor shall be liable to pay compensation at the rate
of one (1) percent of the tendered cost of work for every Ten (10) days limited to a maximum of Ten
(10%) Percent of the value of work while his failure to do so continue and in the case of any such
failure the Engineer-in- charge may on expiry of the notice period rectify and remove and reexecute the
work or remove and replace with other at the risk and cost of the Contractor. The decision of the
Engineer-in- charge as to any question arising under this clause shall be final and conclusive.
GC-72 SUSPENSION OF WORK :
Contractor shall, if ordered in writing by Engineer-in-charge or his representative temporarily suspended
the work or any part thereof for such time (not exceeding two months) as ordered and shall not after
receiving such written order proceed with the work until he shall have received a written order to
proceed therewith the contractor shall not be entitled to claim compensation for any loss or damage
sustained by him by reason of temporary suspension of work as aforesaid. An extension of time for
completion of work will be granted to the contractor corresponding to the delay caused by such
suspension of work if the applied for the same provided the suspension was not consequent upon any
default or failure on the part of the contractor.
GC-73 OWNER MAY DO PART OF THE WORK :
When the contractor fails to comply with any instructions given in accordance with the provisions of
this contract, the S.M.C. has the right to carry out such parts of work as the S.M.C. may designate
whether by purchasing materials and engaging labour or by the agency of another contractor. In such
case the S.M.C.shall deduct from the amount which otherwise might become due to contractor the
cost of such work and materials with Ten (10%) percent added to cover all departmental charges and
should the total amount thereof exceed the amount due to contractor, contractor shall pay the
should the total amount thereof exceed the amount due to contractor, contractor shall pay the
difference to S.M.C.
GC-74 POSSESSION PRIOR TO COMPLETION :
The Engineer-in-charge shall have the right to take possession of or to use any completed or partly
completed work or part of work, such possession or use shall not be deemed to be an acceptance of
any work completed in accordance with the contractor. If such prior possession or use by
Engineer-in- charge delays the progress of work, equitable adjustment in the time of completion will be
made and the contract shall be deemed to be modified accordingly.
GC-75 COMPLETION CERTIFICATE :
As soon as the work has been completed in accordance with contract (except in minor respect that
do not effect their use for the purpose for which they are intended and except for maintenance thereof)
as per general conditions of contract and has passed the tests on completion, the Engineer-in-charge
shall issue a certificate (hereinafter called completion certificate) in which he shall certify the date on
which work has been completed and has passed the said tests and S.M.C. shall be deemed to have
taken over work on the date so certified. If work has been divided in various groups in contract, S.M.C.
shall be entitled to take over any group or groups before the other or others and there-upon the
Engineer-in-charge will issue a completion certificate which will, however, be for such group or
groups so taken over only. In order that contractor could obtain a completion certificate, he shall
made good, with all speed any defect arising from the defective materials supplied by contractor or
workmanship or any act or commission of contract that may have been discovered or developed after
the work or group of works has been taken over. The period allowed for carrying out such work will
be normally, one month. If any defect be not remedied within a reasonable time, S.M.C. may proceed to
do work at contractor's risk and expenses and deduct from the final bill such amount as may be decided
by S.M.C. If by reason of any default on the part of the contractor, a completion certificate has not
been issued in respect of every portion of work within one month after the date fixed by contractor
for completion of work, S.M.C. shall be at liberty to use work or any portion thereof in respect of which
a completion-certificate has been issued, provided that work or the portion thereof so used as aforesaid
shall be afforded reasonable opportunity for completion of this work for the issue of completion
GC-76 SCHEDULE OF RATES :
1. The price/rates quoted by the contractor shall be remain firm till the issue of final certificate and shall
be subject to price ADJUSTMENT CLAUSE GC-35. Schedule of rates shall be deemed to include
and cover all costs expenses and liabilities of every description and all risks of every kind to be taken in
executing, completing and handling overwork to owner by contractor. Contractor shall be deemed to
have known the nature, scope, magnitude and the extent of work and materials required through
contract documents may not fully and precisely furnish them. He shall make such provision in the
schedule of rates as he may consider necessary to cover the cost of such items of work and materials as
may be reasonable and necessary to completion work. The opinion of Engineer-in-charge as to the item
of work shall be final and binding on Contractor although the same may be not shown on or described
specifically in contract documents.
2. The Schedule of rates shall be deemed to include and cover the cost of all constructional plant,
temporary work, pumps, materials, labour and all other materials in connection with each item in
schedule of rates and the execution of work or any portion thereof furnished complete in every respect
and maintained as shown or described in the contract document or as may be ordered in writing during
the continuance of the contract.
3. The Schedule of rates shall be deemed to include and cover the cost of all royalties and free for the
articles and processes, protected by letters patent or otherwise incorporated in or used in connection with
work, also all royalties, and other payments in connection with materials of whatsoever kind for work
and shall include an indemnity to-owner which contractor hereby gives against all action, proceeding,
claims, damages, costs and expenses arising from the incorporation in use of work of any such articles,
processes or materials. Octroi of other Municipal or Local Board charges if levied on materials
equipment of machineries to be brought to site for use on work shall be borne by the contractor.
4. No exemption or reduction of custom duties excise duties, sales-tax or any other taxes or charges of
the Central or State Government any local body whatsoever will be granted to obtained. All of such
expenses shall be deemed to have been included in and covered by schedule of rates. Contractor will
also obtained and pay for all permits or other privileges necessary to complete work.
5. The schedule of rates shall be deemed to include and cover risk on account of delay or interference
with contractor's conduct of work which may occure from any cause including orders of S.M.C. in the
exercise of his power and no account of extension of time granted due to various reasons.
6. For work under unit rate basis no alteration will be allowed in the schedule of rates by reason of work
or any part of them being field, altered extended, diminished or omitted.
GC-77 PROCEDURE FOR MEASUREMENT OF WORK IN PROGRESS :
1. All measurements shall be in metric system. All the work in progress will be jointly measured by
the representative of Engineer-in-charge and contractor's authorised agent. Such measurements will be
got recorded in the measurement book by the Engineer or his authorised representative and signed by
contractor or his authorised agent in token of acceptance. If the contract or his authorised agent fails
to be present when even required by the Engineer-in-charge for taking measurements for any reasons
whatsoever, the measurement will be taken by the Engineer - in - charge or his authorised
representative not withstanding the absence of contract and these measurement will be deemed to be
correct and binding on contractor.
2. Contractor will submit a bill in approved performa in duplicate to the Engineer - in - charge of
the work giving abstract and detailed measurements of various items executed during a month as
mutually agreed. The Engineer-in-charge shall verify the bill and the claim, as far as admissible,
adjusted if possible, within 10 days of presentation of the bills.
3. In case of Tenders for completed items of work, contractor may be allowed 'Secured Advance' on
the Security of materials brought to site for execution of the constructed items of work the extent of 75%
of the value of materials of unperishable nature and an agreement be drawn up with contractor under
which the owner secured a lien on these materials and is safe guarded against losses due to any
reasons whatsoever. Recoveries of advance paid would not be postponed till the whole work is
completed but shall be adjusted from his work done or the materials used, the necessary deductions
being made when the items of work in which they are used and are billed for. When the mode of
measurement is not covered by contract for any item of work it shall be as per latest I.S.I.
GC-78 RUNNING ACCOUNT PAYMENT TO BE RECOVERDED AS ADVANCES :
1. All running account payments shall be regarded as payments by way of advance against the final
payment only and not as payment for work actually done and completed and shall not preclude the
requiring of bad, unsound and imperfect or unskilled work to be removed and taken away and
reconstructed or to be considered as an admission of the due performance of contract or any part thereof.
GC-79 NOTICE FOR CLAIM FOR ADDITIONAL PAYMENT :
If the contractor considers that he is entitled to extra payment or compensation or any claim whatsoever
in respect of work, he shall forthwith give notice in writing to the Engineer-in-charge about his extra
payment and/or compensation. Such notice shall be given to the Engineer-in-charge within Ten (10)
days from the happening of any event upon which contractor basis such claims and such notice shall
contain full particular of the nature of such claim with full details and amount claimed. Failure on
the part of the contractor to put forward any claim with the necessary particulars as above within the
time above specified shall be an absolute waiver thereof. No commission by S.M.C. to reject any such
claim and no delay in dealing therewith shall be waiver by S.M.C. of any rights in respect thereof.
GC-80 PAYMENT OF CONTRACTOR'S BILL :
1. The price to be paid by the S.M.C. to contractor for the work to be done and for the performance of
all the obligations under taken by the contractor under contract shall be based on the contract price and
payment to be made accordingly for the work actually executed and approved by the Engineer-in-
2. No payment shall be made for work costing less than Rs.5,000/-till the work is completed and a
certificate of completion given. But in case of work estimated to cost more than Rs.5,000/- contractor
on submitting the bill thereof will be entitled to receive a monthly payment, proportionate to the part
thereof, approved and passed by Engineer-in-charge whose certificate of such approval and passing of
the sum so payable shall be final and conclusive against contractor. This payment will be made after
making necessary deductions as stipulated elsewhere in the contract documents for materials,
security deposit, etc. The payment shall be released to the contractor within Thirty ( 30 ) days of
submission of the bill in case of running bill and with in two (02) months in case of final bill, contractor
shall present the bill duly pre-receipted on proper revenue stamp.
Payment due to Contractor shall be made by the by crossed Accounts payee cheque in Indian currency
forwarding the same to the registered office of the contractor. Owner shall not be responsible if the
cheque is mislaid or misappropriated by unauthorized person.
GC-81 FINAL BILL :
The final bill shall be submitted by Contractor within two (02) month of the date of physical
completion of work, Otherwise the Engineer-in-charge certificate of the measurement and of total
amount payable for work shall be finalized binding on all parties.
GC-82 RECEIPT FOR PAYMENT :
Receipt for payment made on account of work when executed by a firm must be signed by a person
holding power of attorney in this respect on behalf of contractor except when described in the tender as
a limited company in which case the receipt must be signed in the name of the company by one of
its principal officers or by some other person having authority to give effectual receipt for the
GC-83 COMPLETION CERTIFICATE :
1. When the contractor fulfil his obligation as per terms of contract he shall be eligible to apply for
completion certificate. Contractor may apply for separate completion certificate in respect of each
such portion of work by submitting the completion documents alongwith such application for
completion certificate.
The Engineer-in-charge shall normally issue to contractor the completion certificate within 2 (Two)
month after receiving an application thereof from contractor after verifying from the complete
documents and satisfying himself that work has been completed in accordance with and as set out in
the construction and erection drawings and the contract document. Contractor after obtaining the
completion certificate is eligible to present the final bill for work executed by him under the terms of
2. Within 2 (Two) month of completion of work in all respect contractor shall be furnished with a
certificate by the Engineer-in-charge of such completion but no certificate shall be given nor shall work
be deemed to have been executed, until all (1) scaffolding, surplus materials and rubbish is clearing off
site completely (2) until work shall have been measured by the Engineer-in-charge whose measurement
shall be binding and conclusive and (3) until all the temporary works, labour and staff colonies etc.
constructed are removed and the work site cleaned to the satisfaction of the Engineer-in-charge. If
contractors shall fail to comply with the requirements as aforesaid or before date fixed for the
completion of work, the Engineer-in-charge may at the expenses of contractor remove such scaffolding,
surplus materials and rubbish and dispose of the same he thinks fit.
3. The following documents will form the completion documents :
(a) Technical documents according to which work was carried out.
(b) Construction drawings showing therein the modifications and corrections made during the course of
execution signed by Engineer-in-charge.
(c) Completion certificate for "Embedded" or "Covered" up work.
(d) Certificate of final levels as set out for various works.
(e) Material appropriation statement for the materials issued by owner for work and list of surplus
materials returned to S.M.C.'s store duly supported by necessary documents.
4. Upon expiry of the period of defects liability and subject to Engineer-in-charge being satisfied
that work has been duly maintained by contractor during the defects liability period as fixed
originally, or as external subsequently and the contractor has in all respects made up by subsidence
and performed all his obligations under contract, the Engineer- in-charge shall (without prejudice to
the rights of owner in any way) give final certificate to that effect. The Contractor shall not be
considered to have fulfilled the whole of his obligation until final certificate shall have been given
by the Engineer-in-charge notwithstanding previous entry upon and taking possession, working or using
of the same or any part thereof by owner.
5. Final Certificate only Evidence of Completion :
Except the final certificate no other certificate or payments against a certificate or an general account
shall be taken to be an admission by owner of the due performance of contract or any part thereof or of
occupancy validity of any claim by the contractor.
GC-84 TAXES, DUTIES, OCTROI, ETC. :
The Contractor shall be liable to payment of all the Central/ State/Local Bodie's Levies, taxes or duties
etc. The SMC shall neither bear it nor reimburse at any time but will ensure deduction of
Central/State/Local levies and taxes at Source at the rate provided under the relevant statutes from time
to time inforce. Further the work contract tax or sale tax shall be borne by the Contractor as per Rules and
Regulations of Government.
1% Construction Cess will be deducted from respective R.A. Bill and Final bill in accordance with
the prevailing norms of Govt. of Gujarat.
GC-85 INSURANCE :
Contractor shall at his own expenses carry and maintain with reputable Insurance Companies to the
satisfaction of owner as follows :
1. Employees State Insurance Act :
Contractor agrees to and does hereby accept full and exclusive liability for compliance with all
obligations imposed by the Employees' State Insurance Act 1948, and Contractor further agree to
defend, indemnify and hold owner harmless from any liability or penalty which may be imposed by the
Central or State Government of Local authority by reasons of any asserted violation by contractor or
Sub-Contractor of the Employees' State Insurance Act, 1948 and also from all claims, suits or
proceedings that may be brought against owner arising tender, growing out of or by reasons of the work
provided for by this contract whether brought by employees of Contractor, by third parties or by Central
or State Government authority or any administrative Sub-division thereof. Contractor agrees to fill in
with the Employees State Insurance Corporation, the declaration from and all forms which may be
required in respect Contractor's or Sub-contractor's employees these aggregate remuneration is Rs.
400/-p.m. or less and who are employed in work provided for or those covered by E.S.I from time to
time under the agreement. The Contractor shall deduct and secure the agreement of the Sub-
contractor to deduct the employees' contribution as per the first Schedule of the Employees' State
Insurance Act from wages. Contractor shall remit and secure the agreement of Sub-contractor to remit to
the State Bank of India Employees' State Insurance Corporation Accounts, the employees contribution as
required by the Act Contractor agrees to maintain all cares and record as required under the Act in
respect of employees and payments and contractor shall secure the agreements of the sub-contractors to
maintain such records, any expenses incurred for the contributions or maintaining records shall be to
contractor's or sub- contractor' account. Owner shall retain such sum as may be necessary from the
contract value until contractor shall furnish satisfactory proof that all contribution as required by the
Employees' State Insurance Act 1948 have been paid.
2. Workman's Compensation And Employees Liability Insurance :
Insurance shall be effected for all contractors employees engaged in the performance of this contact.
If any part of work is sublet, contractor shall require the sub-contractor to provide workman’s'
compensation and employer's liability insurance which may be required by owner.
3. Other Insurance required under law or regulation by owner :
Contractor shall also carry and maintain any and all other insurance which may be required under any
law or regulation from time to time. He shall also carry and maintain any other insurance which may
be required by owner.
GC-86 DAMAGE TO PROPERTY :
1. Contractor shall be responsible for making good to the satisfaction of owner any loss of and any
damage to all structures and properties belonging to owner or being executed or Procured by owner or of
other Agencies within the premises of all work of owner, if such loss or damage is due to fault and / or
the negligence or will full act or omission of contractor, his employees, agent representatives or Sub-
2. Contractors shall indemnify and keep owner harmless of all claims for damage to properties
other than S.M.C's property arising under or by reasons of this agreement if such claims result from the
fault and / or negligence or willful act of omission of contractor, his employees, agents, representatives
or sub-contractors.
GC-87 LABOUR LAWS AND REGULATIONS :
1. The contractor shall be responsible for the strict compliance of and shall ensure strict
compliance by his sub contractor employees and agents of all labours and others laws, rules or
regulations having the force of law affecting the relationship of employer and employee between
the contractor/ sub-contractor and their respective employees.
2. No labour below the age of eighteen (18) year be employed on work.
3. Contractor shall pay to the labours engaged on work according the law.
4. The Contractor and sub-contractors o f the contractor shall obtain proper authority designated
in this behalf under any application law, rules or regulations (including but not restricted to the
factories Act and Contract Labour Abolition and Regulation Act 1970, ) in so far as applicable) any and
all such licences, consents, Registration and / or other authorisation as shall from time to time be
or become necessary for relating to the execution of work or any part of portion thereof or the storage
or supply of any materials or otherwise in connection with the performance of the contract and
shall at all times observance by the sub- contractors, employees and agents of all terms and
conditions of the said licences, consents, regulation and other authorisation and laws, rules and
regulations applicable thereto.
GC-88 CONTRACTOR TO INDEMNIFY OWNER :
1. The Contractor shall indemnify and keep indemnified the owner and every member, officer
and employee of owner from and against all action, claims, demands and liabilities whatsoever and in
respect of the breach of any of the above clauses and/or against any claim, action or demand by any
workman/ employee of the contractor or any sub-contractor and or from any liability and way to any
workman / employee of the contractor or any sub-contractor under any law, rule or regulations
having the force of law, including but not limited to claims against the owner under the workman
compensation Act 1923. The employees' Provident Funds Act 1952 and/or the Contract Labour
(Abolition and Regulations) Act,
2. Payment of claims and damages :
If owner has to pay any money in respect of such claims or demands as aforesaid, the amount
so paid and the cost incurred by the owner shall be charged to and paid by contractor without any
dispute notwithstanding the same may have been paid without the consent or authority of the Contractor.
3. In every case in which by virtue of any provision applicable in the workman's Compensation
Act 1923 or any other Act, be obliged to pay compensation to workman employed by Contractor the
amount of compensation so paid, and without prejudice to the rights of S.M.C. under sec.(12) Sub-
section (2) of the said Act, S.M.C. shall be at liberty to recover such amount from any surplus due to
the contractor or the security deposit. S.M.C. will not be bound to contest any claim made under
section (12) Sub-section (2) of the said Act except or written request of Contractor and upon the
contesting of such claim.
4. The Contractor shall protect adjourning sites against structural decorative and other damages
that could be caused to adjourning premises by the execution of these works and made good at his
cost, any such damage, so caused.
GC-89 IMPLEMENTATION OF APPRENTICE ACT 1964 :
Contractor shall comply with the provisions of the Apprentice Act 1964 and the orders issued
thereunder from time to time. If the fails to do so, it will be a breach of contract. Contractor shall also be
liable for any particular liability arising on account of any violation of the provisions of the Act by
GC-90 HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS :
Contractor shall comply with all the rules and regulations of the local sanitary authorities or as framed by
owner from time to time for the protection of health and sanitary arrangements of all labour directly
or indirectly employed on the work of this contract.
GC-91 SAFETY CODE :
Contractor shall adhere to safe construction practice and guard against hazardous and unsafe working
conditions and shall comply with owner's safety rules and set fourth herein.
1. First Aid and Industrial Injuries :
1.1 Contractor shall maintain first aid facilities for its employees and chose of his sub-contractor.
1.2 Contractor shall make outside arrangements for ambulance service and for the treatment of
industrial injuries. Name of those providing these services shall be furnished to Engineer-in-charge
prior to start of construction, and their telephone numbers shall be prominently posted in contractor's
1.3 All injuries shall be reported promptly to Engineer- in-charge, and a copy of Contractor's
report covering each personal injury requiring the attention of a physician shall be furnished to
2. General Rules :
2.1 Carrying, striking, matches, lighters inside the project area & smoking within the job site is
strictly prohibited Violators of smoking rules shall be discharged immediately. Within the
operation area, not hot work shall be permitted without valid gas safety, fire permits. The Contractor
shall also be held liable and responsible for all lapses of his sub-contractors/ employees in this
3. Scaffolding :
3.1 Suitable scaffolding shall be provided for workmen for all works that can not safely be done
from the ground or from solid construction except such short period work as can be done safely from
ladders. When a ladder is used, an extra mazdoor shall be engaged for holding the ladder and if the latter
is used for carrying materials as well, suitable foothold sand handholds shall be provided on the
ladder and the same shall be given inclination not steeper than 1 to 4 (1 horizontal and 4 vertical).
3.2 Scaffolding or staging more than 3.6 M (12') above the ground or floor, swing or suspended
from an overhead support or erected with stationary support shall have a guard rail properly attached,
bolted, braced and otherwise fixed at least 1.0 M (3') high above the floor or platform of scaffolding or
staging and extending along the entire length of the outside ends thereof with only such openings as may
be necessary for the delivery of materials. Such scaffolding or staging shall be so fastened as to prevent
it from swaying from the building or structure.
4. Maintenance of Safety Devices :
4.1 All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in some conditions and no scaffold, ladder or equipment shall be altered or removed
while it is in use. Adequate washing facilities should be provided at or near place or work.
5. Display or Safety Instructions :
5.1 These safety provisions should be brought to the notice of all concerned by display on a
notice board at a prominent place at the work-spot. The person responsible for compliance of the safety
code shall be named therein by the Contractor.
6. Enforcement of Safety Regulations :
6.1 To ensure effective enforcement of the rules and regulations relating safety precautions, the
arrangements made by the contractor shall be open to inspection by the welfare Officer, Engineer-in-
charge of safety Engineer of the owner or their representatives.
7. No Exemption :
7.1 Notwithstanding the above clause 1.0 to 13.0 there is nothing to exempt the contractor from the
operations of any other Act or rules in force in the Republic of India.
7.2 In addition to the above, the Contractor shall abide by the safety code provision as per
C.P.W.D. Safety Code framed from time to time.
GC-92 ACCIDENTS :
It shall be the contractor's responsibility to protect against accidents on the work. He shall indemnify
the Municipal Corporation against any claim for damage or for injury to persons or property resulting
from, and in the course of work and also under the provision of the Workman's Compensation Act. On
the occurrence of an accident arising out of the works which results in death or which is so serious as
to be likely to result in death, the contractor shall within twenty four hours of such accident, report in
writing to the Engineer-in-charge, the facts stating clearly and is sufficient details the circumstances of
such accident and the subsequent action. All other accidents on the works involving injuries to persons
or damage to property other than that of the contractors shall be promptly reported to the Engineer-
in-charge stating clearly and in sufficient details and facts and circumstances of the accidents and
the action taken. In all cases the contractor shall indemnify the Municipal Corporation against all loss
of damage resulting directly or indirectly from the Contractor's failure to report in the manner
aforesaid. This includes penalties or fine consequency of failure to give notice under the
workman's compensation Act or failure to confirm to the provisions of the said. Act in regard to such
In the event of an accident in respect of which compensation may become payable under the
workmen’s compensation Act VIII of 1923 including all modification thereof whether such compensation
may become payable by the contractor or by the Municipal Corporation as principal employer, the
Engineer-in-charge may retain out of money due and payable to the contractor such sum or sums of
money as may, in the opinion of the Engineer-in-charge be sufficient to meet such liability. On receipt
of award from the labour commission in regard to quantum of compensation, the difference in amount
will be adjusted.
GC-93 It is clarified that if the contractor makes his own arrangements for water required for
construction and labour camp etc. by drilling bore. No water charges will be recovered from the
contractor. On the other hand, even if the contractor is not taking connection and makes other
arrangement to use Municipal water by tanker or tapping water from near private connection even so
water charges shall be recovered as per relevant condition of the tender.
GC-93 (A) PRICE VARIATION CLAUSE:
No PRICE VARIATION difference will be paid to the contractor for Labour, Materials, P.O.L.
(Fuel) or any other material for the work
GC-93 (B) STAR RATE & DIFFERENCE FOR REINFORCEMENT STEEL & CEMENT:
No star rate or basic rate difference will be paid to the contractor for cement, steel reinforcement
or any other material for the work
GC-94 GOODS AND SERVICE TAX (GST):
GST (Goods and Service Tax) has come in existence from 1st July, 2017. Contractor/
Successful Bidder is bound to pay any amount of GST prescribed by the Govt. of India as per the
terms of Contract agreed upon during the course of execution of this contract.
During the execution of contract, if there is any change in rate of GST (Goods & Service
Tax) by the Government, the same shall be reimbursed / recovered separately by SMC, subject to
the submission of original receipt / proof for the amounts actually remitted by the successful
tenderer / Contractor to the competent authority alongwith a certificate from chartered accountant
of contractor / successful bidder certifying that the amount of GST paid to the Government and the
same shall be intimated / submitted / claimed within 30 (Thirty) days from the date of payment.
Remittance of GST within stipulated period shall be the sole responsibility of the successful bidder /
Contractor, failing which, SMC may recover the amount due, from any other payable dues with
SMC and decision of Municipal Commissioner shall be final and binding on the Contractor /
Successful Bidder in this regard. Further, the non-payment of GST to the Government may lead to
the termination of contract and forfeiture of Security Deposit / Performance Guarantee amount.
If imposition of any other new taxes / Duties / Levies / Cess or any other incidentals etc. or
any increase in the existing Taxes / Duties / Levies / Cess or any other incidentals etc. (Excluding
GST) are imposed during the course of the contract, in no case SMC shall be liable for the same.
GC-95 SECURED ADVANCES:
No Secured advances shall be paid.
GC-96 SUBMISSION / COMPULSION BY CONTRACTOR
The contractor registered with S.M.C. or any other Govt. organisation is required to employ minimal
technical staff as detailed in the certificate issued to him. If contractor does not employ same technical
staff over works entrusted to him, should submit photo-identity and education qualification of technical
staff appointed at site.
"The contractor shall have to keep the record of the labourers employed for the concerned work. The
contractor should provide attendance card, identification card, pay slip etc to the labourers employed.
Further, the amount of E.S.I. & Provident Fund should be deducted from the salary of the labourers
employed and such amount should invariably be deposited to the concerned Government Departments. In
addition, the amount of social security under E.P.F. & M.P. act 1952 shall be recovered every month &
such amount should invariably be deposited directly to the concern Government Departments. In the
same context, the details regarding such amount deposited to the concern Govt. Deptt. and labourers
employed shall be furnished to the office of Traffic Cell Department of S.M.C. every month.In case of
failure, such amount shall be deducted/recovered from the running bill directly in accordance with the
details given by contractor regarding labourers employed and as per the prevailing rules of
Government.In absence of detail, an adhoc suitable amount of the total amount of work done shall be
Government.In absence of detail, an adhoc suitable amount of the total amount of work done shall be
recovered directly from the running bills. On submission of evidence of recovery of such amount, the
amount recovered/deducted shall be released in the next bill after due sanction of Competent Authority of
GC-97 SPECIAL RISK
If during the contract, there shall be outbreak of war (whether war is declared or not), major epidemic,
earthquake, or similar occurrence in any part of the world beyond the control of either party to the
contract which whether financially or otherwise materially affects the execution of the contract, the
contractor shall unless and until, the contract is terminated under the provisions of this article, use his best
endeavors to complete the execution of the contract, provided always that the Corporation shall be
entitled at any time after the onset of such special risks, to terminate the contract by giving written notice
to the contractor and upon such notice being given this contract shall terminate but without prejudice to
the rights of either party in respect of any antecedent breach thereof. If any of the works, or materials to
be deli subjected to damage or distribution by reasons for the special risks, the contractor shall be entitled
to payment for such damage or destroyed materials and to any costs involved in making good damages or
destroyed materials as may be required by the Municipal Corporation.
The contractor shall not be liable for payment of compensation for delay or for failure to perform the
contract for reasons of Force Majeure such as acts of public enemy, acts of Government fires, floods,
cyclone, epidemics, quarantine restrictions, lockouts, strikes, freight embargoes and provided that the
contractor shall within Ten (10) days from the beginning of such delay notify the Engineer-in-charge in
writing the cause of delay. The Municipal Commissioner shall verify the facts and grant such extension as
the facts justify.
GC-98 SECURITY DEPOSIT
The person/persons whose tender may be accepted (hereinafter called the contractor, which expression
shall unless excluded by or repugant to the context include his heirs, executors, administrators and
assignees) shall (within 15 days of the receipt by him of the notification of the acceptance of his tender
otherwise 0.065% per day of S.D. amount will be charged as penalty) deposit with Municipal
Commissioner in cash or Government securities endorsed to the Commissioner sum sufficient which
will make up the security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sump within the period specified above is not
paid the tender contract already accepted shall be considered as cancelled. The security deposit lodged
by contractor shall be refunded after the expiry of the Defects Liability period as shown in the attached
Memorandum after deducting dues, ifany, which become liable to be recovered from the contractor
under the terms and conditions of this Agreement.
GC-99 COMPENSATION OF THE DELAY
The time allowed for carrying out the work as entered in the ender shall be strictly observed by the
contractor and shall be reckoned from the date on which the order to commence work is given to the
contractor. The work shall through out the stipulated period of the contract be proceeded with, all
due diligence (time being deemed to be the assence of the contract on the part of the contractor) and the
contractor shall pay as conpensation a percentage amount (shown in the attached Memorandum) of the
tendered cost of the whole work as shown by the tender for every day that the work remains
uncommenced or unfinished after the proper days, And further to ensure good progress during the
execution of the work the contractor shall be bound, in all cases in which the time allowed for any work
exceeds one month, to complete parts of the work during the period shown in the attached
In the event of the contractor failing to comply with these conditions he shall be liable to pay as
compensation, the amount mentioned above for every day that the due quantity of work remained
incomplete provided always that the total amount of compensation to be paid under the provision of this
incomplete provided always that the total amount of compensation to be paid under the provision of this
clause shall not exceed 10 percent of the Tendered cost of the work as shown in the tender.
GC-100 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FOREFITED
In any case in which under any clause of or clauses this contract the contractor shall have tendered
himself liable to pay compensation amounting to the whole of this security deposit (whether paid in
one sum or deducted by instalments) or in the case of abandonment of the work owing to serious
illness or death of the contractor or any other causes, the Commissioner on behalf of the Corporation
shall have power to adopt of the following courses, as he may deem best suited to the interest of
Municipal Corporation .
(a) To rescind the contract (of which rescission notice in writting to the contractor under the hand of
the Commissioner shall be conclusive evidence) and in that case that security deposit of the
contractor shall stand forefeited and be absolutely at the disposal of Municipal Corporation .
(b) To employ labour paid by the related Zone and to supply material to carry out the works, or any
part of the work debitting, the contractor with errectness of which cost and price the certificate of
Executive Engineer shall be final and conclusive against the contractor and crediting him with the value
of the work done,in all respects in the same manner and at the same rates as if it had been carried out by
the contractor under the terms of his contract, and in that case the certifate of the Executive Engineer
as to the value of the work done shall be final and conclusive agains the contractor.
(c) To order that the work of the contractor be in measured up and to take such part thereof as
shall be unexecuted out of his hands, and to give it to another contractor to complete, in which case any
expenses which may be incurred in excess of the sum which would have been paid to original ontractor,
if the whole work had been executed by him (as to the amount of which excess expenses the certificate
in writing of the Executive Engineer shall be finl and conclusive) be borne & paid by the original
contractor shall be deducted from any money due to him by Municipal Corporation under the
contract or otherwise from his security deposit or the proceeds of sale thereof, or a sufficient part
Action when the progress of any perticular portion of the work if unsatisfactory
In the event of any of the above courses be adopted by the Commissioner the contractor shall have no
claim to compensation for any loss sustained by him by reason of his purchased or procured any
materials or entered into any engagements, or made any advances on account of or with a view to the
execution of the work or the performance of the contract.And in case the contract shall be reseinded
under provision aforesaid, the contractor shall not be entitled to recover, or be paid any sum for any
work thereto actually performed by him under this contract unless and until the Executive Engineer
shall have certified in writing the performance of such work and the amount payable to him in respect
thereof, and he shall only be entitled to paid the Particular amount so certified.
GC-101 COMPENSATION TO LOSS
Contractor remains liable to pay compensation if action not taken under clause(3) If the progress of any
particular portion of the work is unsatisfactory the Commissioner shall notwithstanding that the general
progress of the work is satisfactory in accordance with clause 2, be entitled to take action under clause
3 (b) after giving the contractor 10 day's notice in writing and contractor will have no claim for
compensation for any loss sustaind by him owing to such action.
GC-102 Power to take possession of require to removal of, or self contractor's plan
In any case in which any of the powers conferred upon the Commissioner by clause 3 and 4 hereof shall
have become exercisable and same shall not have been exercised the non-exercise thereof shall not
constitute a waiver of any of the conditions hereof such powers shall notwithstanding be exercisable
in any future case default by the contractor for which by any cluase or clauses hereof he is declared
liable to pay compensation mounting to the whole of his security deposit require or and the liability of
the contractor for past and future compensation shall remain unaffected.
In the event of the Commissioner taking action under sub-caluse (a) or (c) of clause 3, he may, be he so
desire to take possession of all or any tools, plant materials and stores in or upon the works, or the site
thereof or belonging to the contractor, or procured by him and intended to be used for the execution of
the work of any part thereof, paying or allowing for the same in account at the contract rates, or in the
case of contract rates not being applicable, at current market rates,to be cartified by the Executive
Engineer whose certificate thereof shall be final. In the alternative the Commissioner may by notice in
writing to the contractor or his clerk of the works. Foremen or other authorised agent require him to
remove such tools, plant, materials, or stores from the premises within a time specified in such notice;
&in the event of the contractor failing to comply with any such requisition, the Commissioner may
remove them at the contractor's expense or sell them by action or private sale at the risk and account of
the contractor in all respects, and certificate of the Executive Engineer as to the expense of any such
removal, and the amount of the proceeds and expense of any of any sale shall be final and conclusive
against the contractor.
GC-103 EXTENSION OF TIME
If the Contractor shall desire an extension of the time for completion of the work on the ground of
his having been unavoidably hindered in its execution or on any other ground, he shall apply in
writing to the Commissioner within 30 days from the date on which he was hindered as aforesaid on or
which the cause for asking for extension occurred and the Commissioner may, if in his opinion, there
are reasonable grounds for granting an extension, grant such extension as he thinks necessary or
proper. The decision of the Commissioner in thismatter shall be final.
GC-104 FINAL CERTIFICATION
On completion of the work the contractor shall be furnished with a certificate by the Executive Engineer
(hereinafter called the Engineer- in- charge) of such completion, but no such certificate shall be given nor
shall the work be considered to complete until the contactor shall have removed from the premises on
which the work shall have been executed all scaffolding, surplus materials and rubbish, and shall
have cleaned of the dirt from all woodwork, doors, windows,walls, floors or other parts of any building,
in or upon which the work has been executed,or of which he may have had possession for the purpose
of executing the work,nor until the work shall have been measured by the Engineer-in-charge or w here
the measurement have been taken by his subordinates until they have received the approval of the
Engineer-in- charge, the said measurement being binding and conclusive against the contractor.
If the contractor shall fail to comply with the requirements of this clause as to the removal of
scaffolding, surplus materials and rubbish. And cleaning off dirt on or before the date fixed for the
completion of the work, the Engineer-in-charge may, at the expense of the contractor remove such
scaffolding surplus material and rubbish, and dispose off the same as he thinks fit and clean off such
dirt as aforesaid; and contractor shall forthwith pay the amount off all expenses so incurred,but shall
have no claim in respect of any such scaffolding or surplus materials as aforesaid except for any sum
actually realized by the sale thereof.
GC-105 PAYMENT ON INTERMEDIATE CERTIFICATE TO REGARDED AS ADVANCE.
No payment shall be made for any work, on estimated to cost less than rupees one thousand, till after the
whole of the said work shall have been completed & a certificate of completion given. But in the case of
works estimated to cost more than rupees one thousand, the contractor shall, on submiting a monthly bill
therefore be entitled to received payment proportionate to the percentage shown in the attached
Memorandum of the part of the works than approved and passed by the Engineer-in-charge, whose
certificate of such approval and passing of the sum so payable shall be final and conclusive against the
All such intermediate payment shall be regarded as payment by way of advance against the final
payments only & not as payments for work actually done and completed and shall not preclude the
Engineer-in-charge from requiring bad, unsound imperfect of unskilful work to be removed & taken away
& reconstructed, or re-erected. nor shall any such payment be considered as an admission of the due
performance of the contract or any part thereof in any respect of the accruing of and claim; nor shall it
conclude, determine or affect in any way the Powers of the Engineer-in-charge as to the final settlement
and adjustment of the accounts or otherwise, or in any other way very or affect the contract. The final bill
shall be submitted by the contractor within one month of the date fixed for the completion of the work,
otherwise the Engineer-in-charge's certificate of the measurement and of the total amount payable for the
otherwise the Engineer-in-charge's certificate of the measurement and of the total amount payable for the
work shall be final and binding on all parties.
GC-106 PAYMENT AT REDUCED RATE ON ACCOUNT OF ITEM OF WORK NOT
ACCEPTED AS COMPLETED TO BE THE DISCRETION OF THE ENGINEER-IN-CHARGE
The rates for serveral items of the work agreed to within, shall be valid only when the item concerned is
accepted as having been completed fully in accordance with the sanctioned specifications. In cases where
the items of works are not accepted at so completed the Engineer-in-charge may make payment on
account of such items at such reduced rates as he may consider reasonable in the prepartion of final or on
CLAUSE-1 & EXP.0 Time for Bills to be submitted
A bill may be submitted by the contractor once in each month on or before the date fixed by the
Engineer-in-charge for all works executed in the previous months, and the Engineer -in- charge shall take
or cause to be taken the requisite measurement for the purpose of having the same verified, and the claim,
so far as it is admissible shall be adjusted if possible within fifteen days from the presentation of the bill.
If the contractor does not submit the bill within the time fixed as aforesaid, Engineer-in-charge may
depute a subordinate to measure up the said work in the presence of the contractor or his duly authorised
agent whose counter signature to the measurement list shall be sufficient warrant, and the Engineer-in-
charge may prepare a bill from such list which shall be binding on the contractor in all respects.
GC-107 BILLS TO BE ON PRINTED FORMS
The contractor shall submit all bills on the printed forms to be had on application at the office of the
Engineer-in-charge. The charges to be made in the bills shall always be entered at the rates specified in
the tender or in the case of any extra work ordered in pursuance of these conditions, and not mentioned or
provided for in the tender at the rates hereinafter provided for such work.
GC-108 STORES SUPPLIED BY SMC
If the specification or estimate of the work provides for the use of any special description of materials to
be supplied from the Municipal Store or if it is required that the contractor shall use certain stores to be
provided by the Engineer-in-charge (such materials and stores and the prices to be charged thereof as
hereinafter mentioned being so far as practicable for the convenience of the contractor but not so as in
any way to control meaning or effect of the contract specified in the schedule or memorandum hereto
annexed) the contractor shall be supplied with such materials and stores as may be required from time to
time to be used by him for the purpose of the contract only and the value of the full quantity of materials
and stores so supplied shall be set off deducted form any sums then due, or thereafter to become due to
the contractor under the contract, or otherwise or from the security deposit, or the proceeds of sale thereof
shall be deposit is held in Governement securities the same or a sufficient portion there of shall in that
case be sold for the purpose. All material supplied to the contactor shall remain the absolute property of
Municipal Corporation and shall on no account be removed from the site of the work, and shall at all
times be opened to inspection by the Engineer-in-charge. Any such materials unused and in perfectly
good condition at the time of completion or determation of the contract shall be returned to the related
zone store, if the Engineer-in-charge so requires by a notice in writing given under his hand, but the
contractor shall not be entitled to return any such materials except with such consent and he shall have no
claim for compensation on account of any such materials supplied to him as aforesaid but remaining
unused by him or for any wastage in or damage thereto.
GC-109 WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWINGS ORDERS ETC.
The contractor shall execute the whole and every part of the work in the most substantial and workman
like manner, and both as regards materials and in every other respect in strict accordance with the
specifications. The contractor shall also conform exactly, fully and faithfully to designs, drawings and
instructions in writing relating to the work signed by the Engineer-in-charge and lodged in his office and
to which the contractor shall be entitled to have access for the purpose of inspection at such office, or on
the site of the work during office hours, and the contractor shall, if he so requires, be entitled at his own
expense to make or cause to be made copies of the specifications and of all such designs, drawings and
instruction on aforesaid.
GC-110 ALTERNATION ON SPECIFICATIONS AND DESIGN NOT TO INVALIDATE
CONTRACTORS. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE TO
RATES OF THE SMC
The Engineer-in-charge shall have power to take any alteration in, or addition to the original
specifications, drawings, designs and instruction that may appear to him to be necessary or advisable
during the progress of the work, and the contractor shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him in writing signed by the Engineer- in-
charge and such alteration shall not invalidate the contract and any additional work which the contractor
may be directed to do in the manner above specified as part of the work shall be carried out by the
contractor on the same conditions in all respect on which he agreed to do the main work and at the same
rates as are specified in the tender for the main work. And if the additional and altered work includes any
class of work for which on rates is specified in this contract than such class of work shall be carried out at
the rates entered in the schedule of rates of Municipal Corporation or at the rates mutually agreed upon
between the Engineer-in-charge and the contractor whichever are lower if the additional or altered work
for which no rate is entered in the schedule of Rates of Municipal Corporation is ordered to be carried out
before the rates are agreed upon then the contractor shall, within seven days of the date of receipt by him
of the order to carry out the work, inform the Engineer-in-charge of the rate which it is his intention to
charge for such class of work and if the Engineer-in-charge does not agree to this rate he shall by notice
in writing be at liberty to cancel his order to carry out such class of work, and arrange to carry it out in
such manner as he may consider advisable provided always that if the contractor shall commence the
work or incure any expenditure in regards thereto before the rates shall have been determined as lastly
herein before mentioned, then in such case he shall only be entitled to be paid in such case he shall only
be entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the date of
the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-
in-charge. In the event of a dispute, the decision of the Commissioner will be final.
Where, however, the work shall have to be executed according to the designs; drawings and
specifications recommended by the contractor and accepted by the competent authority the alteration
above referred to shall within the scope of such designs drawings and specification appended to the
Extension of time in consequence of additions or alterations. The time limit for the completion of work
shall be extended in the proportion that the increase in its cost occasioned by alterations or addition the
cost of the original contract work, and the certificate of the Engineer-in-charge as to such proportion shall
GC-111 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORKS TO BE
If at any time after the execution of the contract documents the engineer-in-charge shall for any reason
whatsoever, require the whole or any part of the work as specified in the tender to be stopped for any
period or shall not require the whole or part of the work to be carried out at all or to be carried out by the
contractor, he shall give notice in writing of the fact to the contractor who shall thereupon suspend or
stop, the work totally or partially, as the case may be. In any such case, except as provided hereunder, the
contractor shall have no claim to any payment or compensation whatsoever on account of any profit or
advantage which he might have derived from the execution of the work in full but which he did not so
derive in consequence of the full amount of the work nor having been carried out, or on account of any
loss that he may be put to on account of materials purchased or agreed to be purchased, or for
unemployment of labour recruited by him. He shall not also have any claim for compensation by reason
of any alteration having been made in the original specifications, drawings, designs and instructions may
involve any curtailment of the work as originals contemplated. Where which however, materials have
already been purchased or agreed to be purchased by the contractor, before receipt by him of the said
notice, the contractor shall be paid for such materials at the rate determined by the Engineer-in-charge,
provided they are not in excess of requirements and are of approved quality and/or shall be compensated
for the loss, if any that he may be put to in respect of materials agreed to be purchased by him, the
amount of such compensation to be determined by the Engineer-in-charge, whose decision shall be final.
If the contractor suffers any loss on account of his having to pay labour charges during the period during
which to stoppage of work has been ordered under this clause the contractor shall on application be
entitled to such compensation on account of labour charges as the Engineer-in-charge, whose decision
shall be final, may consider reasonable, provided that the contractor shall not be entitled to any
compensation on account of labour charges if, in the opinion of the Engineer-in-charge, the labour could
have been employed by the contractor elsewhere for the whole or part of the period during which the
stoppage of the work has been ordered as a foresaid.
GC-112 ON CLAIM TO COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN
SUPPLY OF MATERIALS BY SMC.
The contractor shall not be entitled to claim any compensation from Municipal Corporation for the loss
suffered by him on account of delay by Municipal Corporation in the supply of materials entered in
schedule A' where such delay is caused by
(1) Difficulties relating to the supply of Railway wagons & availability of Government controlled
(2) Force Majeure.
(3) Act of God.
(4) Act of the Nation's enemies or any other reasonable cause beyond the control of Municipal
In the case of such delay in the supply of material the Municipal Corporation shall grant such extension
of time for the completion of the work as shall appear to the Commissioner to be reasonable in
accordance with the circumstances of the case. The decision of the Commissioner as to the extension of
time shall be accepted as final by the contractor.
The contractor is to set out and levi the work & will be responsible for the accuracy of same. He is to
provide and maintain measuring and surveying instruments including steel tapes, theodolite and dumpy
level at all times for proper carrying of the work and for the use of Executive Engineer and his
representative including skilled attendance.
The Contractor is to cover up and protect the works from the weather, and is suspend all `wet'
operations during weather which, in the Executive Engineer opinion, will be detrimental to the work.
Samples of each class of material and workmanship shall be submitted by the Contractor for the
approval of Executive Engineer and after such approval these samples shall be deposited at any
place the Executive Engineer may appoint and the Contractor shall be required to perform all the works
of this contract in accordance with the samples.
On completion, all work must be cleaned down; rubbish removed and the works and land cleaned of
rubbish; surplus materials and other accumulations, and everything left in a clean and ordinary
The contractor shall provide, erect and maintain proper sheds and temporary buildings for the storage
and protection of materials and goods and for the execution of work which may be fabricated or
brought on the site.
The contractor is to set out and level the works and will be responsible for the accuracy of the same. He
shall also be responsible for the correctness of the positions, levels, dimensions and alignment of all parts
of the structures as shown in the drawings supplied to him.If at any time any error shall appear during
the progress of any part of the work, the contractor shall at his own expense rectify such error if
called upon to the satisfaction of the Executive Engineer.
The contractor shall permit the execution of the work not provided for in the tender by artists;
tradesman, or others engaged by the Municipal Corporation . The contractor shall allow all reasonable
facilities and the use of his scaffolding and water for the execution of such work, but is not required
to provide any special scaffolding for the execution of such work except by special arrangement with
Municipal Corporation .
GC-120 TIME LIMIT FOR UNFORESEEN CLAIM
Under no circumstance whatsoever shall the contractor be entitled to any compensation from Municipal
Corporation on any account unless the contractor shall have submitted a claim in writing to the Engineer-
in-charge within one month of cause of such claim occurring.
GC-121 ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK:
If at any time before the security deposit is refunded to the contactor, it shall appear to the Engineer-in-
his subordinate in charge of the work that any work has been executed with unsound imperfect, or
unskillful workmanship or with materials of inferior quality; or that any materials or articles provided by
him for the execution of the work are unsound, or of a quality inferior to that contracted for, or other-
wise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact
in writing to the contractor and them not withstanding the fact that the work, materials or articles
complained of may have been inadvertently passed, certified and paid for, the contractor shall be bound
forthwith to rectify, or remove and reconstruct the work so specified in whole or in part as the case may
require, or if so required shall remove the materials or articles so specified and provide other proper and
suitable materials or articles at his own charge and cost; and in the event of his failing to do so within a
period to be specified by the Engineer-in-charge in the written intimation aforesaid, the contractor shall
be liable to pay compensation at the rate of one percent on the amount of the tender for every day not
exceeding ten days, during which the failure so contimate and in the event of any such failure as aforesaid
the Engineer-in-charge may rectify or remove and execute the work or remove and replace the materials
or articles complained or as the case may be at the risk and expense in all respects of the contractor,
should the Engineer-in-charge consider that any such inferior work or materials as described above may
be accepted or made use of it; shall be within his discretion to accept the same at such reduced rates along
with the appropriate penalty as the Commissioner may deem fit.
The period to be counted from that date of final completion and handing over of the work to the
Municipal Corporation during which the contractor is so liable for any defects in the work shall be the
Defects Liability Period shown in the attached Memorandum.
GC-122 WORK TO OPEN BE INSPECTION
Contractor is responsible agent to be present. All works under in course of execution or executed in
pursuance of the contract shall at all time be open to the inspection and supervision of the Engineer-in-
charge and his subordinates, and the contractor shall at all times during the usual working hours, and at
all other times at which reasonable notice of the intention of the Engineer-in-charge or his subordinate to
visit the work shall have been given to the contractor, either himself be present to receive orders and
instructions, or have a responsible agent duly accredited in writing present for that purpose. Orders given
to the contractor's duly authorised agent shall be considered to have the same force and effect as if they
had been given to the contactor himself.
GC-123 NOTICE TO BE GIVEN BEFORE WORK IS CONVERED UP
The contactor shall give not less than five day's notice in writing to the Engineer-in- charge or his
subordinate in charge of the work before covering up or other wise placing beyond the reach of
measurement any work in order that the same may be measured; and correct dimensions thereof taken
before the same is so covered up or placed beyond the reach of measurement any work without the
consent in writing of the Engineer- in- charge or his subordinate in charge of the work, and if any work
shall be covered up or placed beyond the reach of measurement without such notice having been given or
consent obtained, the same shall be uncovered at the contractor's expense, and in default thereof no
payment or allowance shall be made for such work or for the materials with which the same was
GC-124 Contractor Liable For Damage Done, And Or Imperfection For Three Months After
If the contactor or his workmen; or servants shall break, deface injure or destroy any part of a building in
which they may be working, or any building, road, fence enclosure or grass land or cultivated ground
continuous to the premises on which the work of any part thereof is being executed; or if any damage
shall be done to the work for any cause whatever while if is in progress or if any imperfection become
apparent in it within the Defect liability period mentioned above by Engineer- in- charge the contactor
shall make good the same at his own expense, or in default the Engineer in charge may cause the same to
be made good by other workmen and deduct the expenses (of which certificate of Engineer-in- charge
shall be final) from any sum that may be due or thereafter became due to the contractor or from his
security deposit or the proceed of sale thereof or of a sufficient portion thereof.
GC-125 CONTRACTOR TO SUPPLY PLANT, SCAFFOLDING ETC
The contractor shall supply at his own cost all materials ( except such special materials, if any, as
supplied from the Pubub works department Stores in accordance with the contract).plant tools,
appliances implements, ladders, cordage, scaffolding and any temporary works which may be
required for the proper execution of the work, in the original; altered or substituted from, and whether
included in these specification or, other documents forming part of the contract or referred to in these
conditions or not and which may be necessary for the purpose of satisfying or complying with the
requirements of the Engineer-in-charge as to any matter on which under these conditions he is
entitle to be satisfied, or which he is entitled to require together with carriage thereof. To and from
the work. The contractor shall also supply without charge the requisite number of persons with the
means and materials necessary for the purpose of setting out works and counting, weighing and
assisting in the measurement or examination at any time and from time to time of the work or
materials, Failing this the same may be provided by the Engineer-in-charge at the expense of the
contractor and the expense may be deducted from any money due to the contractor under the
contract, or from his security deposit or the proceeds of sale thereof or of a sufficient portion thereof.
The contractor shall provide all necessary fencing and lights required to protect the public from
accident; and shall also be bound to bear the expenses of every suit. Action or other legal proceedings,
at law, that may be brought by any person for Injury sustained owing to negligence of the above
precautions, and to pay damages and costs which may be awarded in any such suit action or
proceedings, to any such person, or which may with the consent of the contractor be paid in
compromising any claim by any such person.
The contractor shall make his own arrangement for drinking water for the labour employed by him.
GC-127 LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN OR OUTSIDE WORK
Compensation for all damage done intentionally or unintentionally or by contractor's labourers whether
in or beyond the limits of municipal property shall be estimated by the Engineer-in-charge or such
other office as he may appoint & estimates of Engineer-in-charge subject to the decision of the
Commissioner on appeal be final & the contractor shall be bound to pay the amount of the assessed
compensation of demand failing which the same will be recovered from the contractor as damage from
the security deposit or deducted by the Engineer-in-charge from any sum that may by due or become
due from Mahanagar Seva Sadan to the contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal proceedings that may be
brought by any person from injury sustained by him owing to negligence of precautions to prevent the
spread of fire & he shall also pay any damages and cost that may be awarded by the court in
GC-128 WORK ON SUNDAY
No work shall be done on Sunday without the sanction in writing of the Engineer-in -charge.
Contract may be rescinded by and security deposit forfeited for subletting it without approval or for be
inging a public officer or if contractor becomes in solvent:
The contract shall not be assigned or subject without the written approval of the Engineer- in-charge,
and if the contactor shall assign or sublet his contract or attempt to do so or become insolvent or
commence any proceedings to be adjudicated an insolvent or make any composition with his creditors, or
attempt to do the Engineer-in-charge may, by notice in writing rescind the contract. Also if any bribe,
gratuity gift, loan, perquisite, reward or directly advantage, pecuniary or otherwise, shall either or
indirectly be given, promised, or offered by the contractor, or any of his servants agents to any public
officer or person in the employ of Municipal Corporation in any way relating to his office or
employment, or if any such officer or person shall become in any way directly or indirectly interested
in the contract the Engineer- in-charge may be notice in writing rescind the contract. In the event of
contract being rescinded, the security deposit of the contractor shall thereupon stand forfeited and be
absolutely at the deposit of the Mahanagar Seva Sadan & the same consequences shall ensue as if the
contract had been rescinded under clause-3 hereof and in addition the contactor, shall not be entitled
to recover or be paid for any work thereto for, actually performed under the contract.
GC-130 SUM PAYABLE BY WAY OF COMPENSATING TO BE CONSIDERED AS
REASONABLE COMPENSATION WITHOUT REFERENCE ACTUAL LOSS
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Municipal Corporation without
reference to the actual loss or damage sustained and whether any damage has or has not been
GC-131 CHANGES IN THE CONSTITUTION OF FIRM TO BE NOTIFIED.
In the case of a tender by partners any change in the constitution of a firm shall be forthwith notified
by the contractor to the Engineer-in-charge for his information.
GC-132 WORKS TO BE UNDER THE DIRECTION OF EXECUTIVE ENGINEER
All works to be executed under the control shall be executed under the directions and subject to the
approval in the respects of the Executive Engineer who shall be entitled to direct at what point or
points and in what manner they are to be commenced, and from time to time carried on.
GC-133 DECISION OF THE COMMISSIONER TO BE FINAL
Except where otherwise specified in the contract decision of the Commissioner shall be final conclusive
and binding on all parties to the contract upon all questions relating to the meaning of the specification
designs, drawings and instructions here in before mentioned and as to the quality of workmanship, or
materials used on the work, or as to any ot her question, claim, right, matter, or thing whatsoever in any
way arising or relating to the contract, designs, drawings, specifications, estimates, instructions,
orders or these conditions, or otherwise concerning the works or the execution or failure to execute the
same, whether arising, during the progress of the work or after the completion or abandonment
GC-134 LUMP SUM IN ESTIMATES:
When the estimate on which a tender is made includes lump sums in respect of parts of the work the
contractor shall be entitled to payment in respect of the item of work involved or the part of the work in
question at the same rates as are payable under this contract of such items of if the part of the work in
question is not in the opinion of the Engineer-in-charge capable of measurement the Engineer-in-
charge may at his discretion pay the lump sum amount entered in the estimate, and the certificate in
writing of the Engineer-in-charge shall be final and conclusive under the provision of the clause.
GC-135 ACTION WHERE NO SPECIFICATION
In the case of any class of work of which there are on such specifications as are mentioned in Rule
such work shall be carried out in accordance with the Municipal or Gujarat Government P.W.D.
specifications, and in event of there being no Municipal or Government P.W.D. specifications, then in
such case the work shall be carried out in all respects in accordance with the instructions & requirement
of the Engineer- in-charge.
GC-136 DEFINITION OF WORKS
The expression "works" or "Work" where used in these conditions shall, unless there be something in
the subject or context repugnant to such construction be constructed to mean the work of works the
contracted to be executed under or in virtue of the contract, whether temporary or permanent, and
whether original altered, substituted or additional.
GC-137 REFUND OF QUARRY FEES AND ROYALTIES
All quarry fees and royalties shall be paid by the contractor All octroi taxes shall also be paid
contractor according to the Municipal rules in force at the time and no refund shall be given
Certificate for refund of quarry fees and royalties in admissible under existing rules shall be given
by the Municipal to the contractor after successful completion of the contract. For the levy of water
charges for construction work, please see the attached Memorandum.
GC-138 COMPENSATION UNDER WORKMEN'S COMPENSATION ACT
The contactor shall be responsible for and shall pay any compensation to his workmen payable under the
workmen's Compensation Act 1923 ( VIII of 1923 ) or any statutory modification thereof for injuries
caused to workmen.
GC-139 CLAIM FOR QUANTITIES OF WORK ENTERED IN THE TENDER ESTIMATE
Quantities shown in the tender are approximate and no claim shall be entertained for quantities of work
executed being either more or less then those entered in the tender of estimate.
GC-140 CLAIM FOR COMPENSATION DELAY IN STARTING THE WORK
No. compensation shall be allowed for any delay caused in the starting of the work on account of any
acquisition of land and in the case of clearence work, for any delay in accordance to estimate.
GC-141 CLAIM FOR COMPENSATION FOR DELAY IN THE EXCAVATION OF WORK
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow pits or compartments. The rates are inclusive for hard or cracked soil
excavation in mud, sub- soil water or water standing in borrow pits, and no claim for an extra rate
shall be entertained, unless otherwise expressly specified.
GC-142 ENTERING UPON OR COMMENCING ANY PORTION OF WORK
The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the work
failing such authority the contractor shall have no claim to ask for measurements for payment of work,
GC-143 MINIMUM AGE OF PERSONS EMPLOYED THE EMPLOYMENT OF DONKEYS
AND OR OTHER ANIMALS & THE PAYMENT OF FAIR WAGES
(i) No contractor shall employ any person who is under the age of 12 years.
(ii) No contractor shall employ donkeys or other animals with breching of string or thin rope.
The breeching must be atleast three inches wide and should be of tape (Nawar).
(iii) No animals suffering from sores, lameness or emaciation or which isimmature shall be
employed on the work.
(iv) The Engineer-in-charge or his agent is authorised to remove from the work any person or animal
found working which does not satisfy these conditions and no responsibility shall be accepted by
Municipal Corporation for any delay caused in the completion of the work by such removal.
(v) The contractor shall pay fair & reasonable wages to the workmen employed by him in the
contract undertaken by him in the event of any dispute arising between the contractor and his
workmen onthe grounds that the wages paid are not fair and reasonable, the dispute shall be referred
without delay to the Executive Engineer who shall decide the same.
The decision of the Executive Engineer shall be conclusive and binding.
On the contractor but such decision shall not in any way affect the condition in the contract
regarding the payment to be made by Municipal Corporation at the sanctioned tender rates.
GC-144 METHOD OF PAYMENT
Payment to contractors shall be made by cheques drawn on any Bank in Surat, provided the amount
exceeds Rs.10. Amounts not exceeding Rs.10 will be paid in cash.
GC-145 ACCEPTANCE OF CONDITION COMPULSORY BEFORE TENDERING FOR
Any contractor who does not accept these conditions shall not be allowed to tender for works.
GC-146 CLAUSE HEADINGS
The clause headings in these conditions are for purposes of reference only and are not to be deemed to
from part of this contract.
Disputes if any, shall be discussed and mutually settled and in case of disagreement the same shall be
referred to Commissioner/Standing Committee. After referring to Commissioner/Standing Committee if
the said dispute is not solved, the same shall be referred to the court subject to Surat Jurisdiction only.
GC-148 THE FOLLOWING CONDITION ARE BEING INCLUDED IN THIS TENDER AND
SHALL BE CONSIDERED AS A PART OF TENDER DOCUMENT.
(i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
(i) In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
extent may be refunded to the contractor while releasing the payment of final bill. In short, the S.D. to be
retained by the Corporation after payment of final bill shall be equal to 2% of the amount of final bill as
per the prevailing norms or as per the norms decided from time to time.
(ii) If there is increase in amount of work more than 5% of the Contract value. The Additional S.D. shall
be recovered from the running bill. When the total of any of work done by the Contractor up to running
bills under consideration is more than 5% of the contract value. However, such S.D. shall be recovered
in the round figure of Rs. 1000/- i.e. the amount of work done when it exceeds 5% of the contract value it
shall be refunded of to the nearest multiple of Rs.25000/- such additional S.D. shall be recovered for the
works amount to Rs. 5 Lacs or more at the rate of 4% of the additional amount.
(iii) In many cases, the contractors are stopping the work half-way due to number of reason and when
the department has to take actions in accordance to clause 3(a) or (b) or (c) of the contract the
remaining work has to be carried out by advertising the tender for the remaining work and the whole
administrative process right from inviting tenders to finalising the tender etc.
In such cases a fixed amount of Rs.1000/- should be reversal from the original contract towards the
cost of advertisement and other administrative charges incurred by the department in finalising the
contract for the remaining work. In case a separate advertisement is issued for a single work actual cost of
advertisement shall be recovered such recovery shall be in addition to the recovery to be made under
clause-3 or such other relevant clauses.
In continuation of clause No.46(i) if any contractor found employing person or persons under the age of
12 years, during course of the construction at any stage, legal actions shall be taken against him as
stipulated in Child Labour (Prohibition & Regulation) Act 1986 and also, a penalty of Rs.20,000/-
(Rupees Twenty thousand) shall be imposed which shall be deposited with District Collector in Child
Labour Rehabilitation cum Welfare Fund.
GC-150 EVALUATION OF SUBMITTED QUALIFICATION OFFER BASED ON
SUBMISSIONSMADE BY THE TENDERER
The tenderer shall be fully responsible for correctness of submissions made whether same has been
examined and approved by employer or not. In the event of misrepresentation or suppression of the
matter/ fact by the tenderer, the action will be taken on the wrong tenderer as per procedure/ provision
outlined in the tender document. Price bid will be opened of those tenderers, whose post qualification
bids meet requirements of the qualifying criteria as laid down in tender
GC-151 RESPONSIBILITY OF CONTRACTOR UNDER CONSTRUCTION AND
DEMOLITION WASTE (C & D WASTE) RULES
Contractor shall remove all condtruction and demolition waste (C & D waste) and clean the area
every day, or depending upon (1) The type & schedule of the work, (2) The quantity and type of
waste generated, appropriate storage and collection facility shall be developed at site. Reasonable
timeframe shall be worked out in consultation with engineer in charge of the project, for storage
& usage of C & D waste.
If it's found that contractor is irregular and showing negligence to management of C & D waste,
them if deem fit, engineer in charge would arrange to dispose the said C & D waste through an
authorized C &D waste contractor/agency of surat municipal corporation and all the expenditure
made towaers disposal of this C & D waste shall be recovered from the contractor as per the
prevailing charges.
Contractor shall have to bear the expenses towards management of C & D waste as per the
prevailing norms, no extra payment shall be entertained for the same.
Contractor shall keep record of generation and disposal of construction and demolation waste (C
& D waste) and proof of its disposal as per the provision of C & D waste rules and he has to
submit alone with running bills.
If contractor fails to upkeep and maintain records of C & D waste generation- disposal records
etc., Than it shall be calculated as per the provision of the standing committee resoluction no
1621/2016, dt.01/10/2016 and charges shall be recovered from due of contractor with surat
municipal corporation.
Contractor shall also ensure use of recycled products made from SMC authorized C & D waste agency as
far as possible to promote the C & D waste management project.
SIGNATURE OF THE CONTRACTOR EXECUTIVE ENGINEER
SURAT MUNICIPAL CORPORATION
ADDITIONAL INSTRUCTION FOR CEMENT AND STEEL :
Surat Municipal Corporation shall not issued cement and reinforcement steel to be used for this work.
The cement and reinforcement steel required for the above said work shall be procured by contractor at its own
The brands for cement shall be as mentioned in the table below.
The cement to be used shall be 53 The reinforcement steel i.e. HYSD bars shall
grade Cement and out of following be only of following makes and shall be
brands only: Thermo-Mechanically treated (TMT).
1. Ultrateck 2. Rastriya Ispat Nigam Ltd. (RINL)
2. Ambuja 3. TATA
3. Sanghi 4. Electrotherm(India) ltd.
4. Hathi 5. National
5. Siddhi 6. JSW steel Ltd.
6. J.K.laxmi 7. Ramswaroop
9. Mono Steel India Ltd.
The brands for structural steel to be used shall be of make TATA, Jindal, SAIL or Asian.
All structural steel shall conform to I.S. 226-1975. The steel shall be free from the defects mentioned in I.S. 226-
1975 and shall have a smooth finish. The material shall be free from loose mill scale, rust pits or other defects
affecting the strength and durability. Rivet bars shall conform to I.S. 1148-1992.
When the structural steel is supplied by the contractor test certificates of the manufacturers shall be
obtained according to I.S. 226-1975 and other relevant Indiand Standards.
Coloured galvanized Roofing sheet shall be of TATA or Jindal make trafford sheet
WASTAGE OF CEMENT AND REINFORCEMENT STEEL :
As the contractor is to bring the cement and steel, the question of considering the wastage on the basic of
issue rate does not arise i.e. no saparate payment shall be made for any kind of wastage in the materials. The
payment for reinforcement bar will be made on theoritical weight basis. The weight shall be computed on the
basis of the length of the steel used in the work multiplied by the standard unit weight of MS/HYSD/TMT bar as
mentioned in IS code No.1786.
The steel consumption eighter less than 7.5% of the standard consumption shall be penalised either at
the double existing corporation issue rate or the prevailing market rate, whichever is more.
Similarly, for cement also, the less consumption beyond 5% shall be penalised at the double existing
corporation issue rate or the prevailing market rate, whichever is more.
Basic Rate for the month of AUGUST-2026 (1) High strenth TMT steel is Rs. 58,000/- Per MT(Without GST)
(2) High strenth TMT CRS steel is Rs. 61,000/- Per MT(Without GST) (3) Cement is Rs. 5,640/- Per
MT(Without GST)
Any of the above mentioned brands of Cement and Reinforcement steel shall only be used by the contractor at the time of
TESTING OF CEMENT AND STEEL :
It should be specifically noted that the cement and steel brought by the contractor at site of work shall be used only
after the same is tested at the approved laboratory as per the direction of the Engineer- in-charge. Such approved
laboratory may be located at Surat, Baroda, Ahmedabad or Mumbai.
All the charge for the transport and testing of the samples shall have to be borne by the contractor. The frequency of
testing such material shall be in accordance to the relevant Indian Standards as directed by Engineer-in-charge.
Executive Engineer,
Surat Municipal Corporation.
Signature of the Contractor:
1. General Description of work : NAME OF WORK: ANNUAL RATE
CONTRACT FOR REPAIRING AND
MAINTAINANCE WORK IN VARIOUS
MUNICIPAL SCHOOL BUILDINGS IN
CENTRAL ZONE (SOUTH)
2. Estimated Cost : Rs. 56,79,379.67 + GST
3. Earnest Money Deposit : Rs.
4. Security Deposit :-
(i) Initial Security Deposit Rs. 2 % of tender amount
(ii) To be Deduced From R.A. Bill Rs. 2% of each and every Bill amount
Total Deposit : Rs. 4% of Tender Amount
5. Time allowed for the completion of work : 12 (Twelve) months (Including monsoon)
from date fixed in written order to
6. Compensation for delayed work under GC : Zero Point two percent (0.2%) of the contract
20A price per day maximum up to ten percent (10%)
of the contract price.
7. The progress of work should confirm to the
following schedule
10% of the work in : 25% of the time.
40% of the work in 50% of the time.
70% of the work in 75% of the time.
100% of the work in 100 % of the time
8. Percentage to be retained from running : 5% (Five Percent) (refer GC-10)
9. Defect Liability Period : 12 (Twelve) Months From the date of actual
completion of work.
10. Water Charges : CONDITION FOR THE WATER SUPPLY
& ELECTRIC SUPPLY on next page.
12. Construction Cess will be deducted from : 1% of Work Done Amount in R.A.Bills and
respective R.A. Bill and Final bill in Final Bill
accordance with the prevailing norms of
Govt. of Gujarat.
13 Goods and Service Tax (GST) As per GC
EXECUTIVE ENGINEER
Signature of the Contractor: SURAT MUNICIPAL CORPORATION
SURAT MUNICIPAL CORPORATION
CONDITION FOR THE WATER SUPPLY & ELECTRIC SUPPLY
FOR WATER CHARGE (As per City Engineer Note No.386, dtd.30/7/2012)
In case of Municipal Network or distribution center available or not at nearby area
Contractor has to make his own arrangement for construction work whether from private
boring or tankers. Contractor has to submit test report of water weather it is of good quality for
construction work or not and contractor has to inform about it within 30 days of starting the work.
If the contractor makes his own arrangement for water required for construction and labour camp etc.
by drilling own bore or tankers, no water charges will be recovered from the contractor .
If contractor wants to use Municipal Water he has to follow procedure within below:
1.Contractor has to apply for water connection by Municipal Licensed plumber in prescribed form.
2.Contractor has follow all procedure with his own expenses.
3.According to rule Municipal Corporation issue bill to contractor for consumption of water and
contractor has to paid it within stipulated time and contractor has submit one copy of bill and
payment receipt to concern department. If contractor fail to pay the bill the amount of bill/paid
receipt can be recover from contractor's bill.
4.If Municipal Corporation network is not available then Contractor can make arrangement of
water tanker from nearby distribution center after depositing required amount.
5.After completion of work contractor has to can-celled the water connection and inform the
concern department.
6.If network and distribution center/network are both not available in that case contractor has to
make his own arrangement for good quality construction water and has to follow the option-1.
7. if contractor is taking water connection or even if the contractor is not taking connection and makes
other arrangement to use Municipal Water by tanker or tapping water from near private connection,
water charges shall be recovered at the rate of 3% (Three Percent) of the civil items in which water
(2) The contractor shall make his own arrangement at his cost for electric supply required for
operating various plants and machineries required for the works and for general lighting purpose for
site, office, labour colony etc.
The energy bills shall also be paid by the contractor.
EXECUTIVE ENGINEER
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
IMPORTANT INSTRUCTION-A TO THE CONTRACTOR
(1) This tender document containing Page No. 01 to 234 duly signed by the tenderer, should be furnished to
Corporation treasury along with the amount of earnest money deposit as mentioned in tender notice. If
any of the drawings or papers removed from the tender, the tender shall be rejected and E.M.D. shall be
(2) The tenderer who wants to propose something in written, he should write it on his letter pad or another paper.
Anything written on tender papers shall not be considered by Corporation and Contractor shall not be
intend to do so.
(3) Following Certificate shall be enclosed with tender.
(a) Solvency Certificate amounting of 20% of tender amount.
(b) Registration Certificate of required class given by Government or Semi-Government organisation.
(c) Ternover Certificate and Income-Tax clearance certificate..
(d) List of work done by Contractor with its volume.
(e) GST No. along with registration certificate under GST
(f) P.F. No. along with registration certificate
EXECUTIVE ENGINEER,
SURAT MUNICIPAL CORPORATION,
SIGNATURE OF THE CONTRACTOR.
(1) The work shall be carried out strictly accoriding the specifications given in Bombay
Public Works Department Hand Book Vol.1 and II (The latest edition) whenever applicable as
directed by Executive Engineer.
(2) The work shall have to be started by the contractor at as many places as ordered by the
Executive Engineer.
(3) If during excavation or carrying out of any item of the work, any electric pole, electric cable,
telephone cables, telegraph cable, gas line, drain connection pipeline,water service pipeline,
sewer main, water mains,etc. is/are damaged by the contractor shall be liable to pay the full
expenditure required and to repair the same or charges for the same (as the case may be )
decided by the electric company, Gas Company, Government Authority or the Surat Municipal
Corporationwhich ever may be.
(4) The work shall be carried out in workman like manner, and best skilled worker should be
employed. If any defect in the work is found out the contractor shall have to rectify within the
time fixed by Executive Engineer. If he fails to rectify the defect Executive Engineer after
giving due notice shall rectify the defect at the risk and cost of the contractor.
(5) All the work shall be done strictly according to the instruction of Executive Engineer.
(6) No compensation shall be paid if the work is stoped due to defective work or as per the
instruction from Engineer-in-charge due to any reasons.
(7) The rates given in the schedule shall hold good for all works done under this contract without
reference to quantities or location of work.
(8) The contractors are particularly directed to observe from the specification what is to be
included in the items and rates for the serveral portion of the work frame out all their rates for
items accordingly.
(9) The date of starting of the work is considered to be the date specificied in the final work order.
(10) If any Clause of Arbitration is there in tender document is deleted here with.
(11) The project under this tender may be executed under strict supervision of P.M.C. if deployed
by S.M.C. Contractor shall carryout the instructions of P.M.C.
(12) Third Party Inspection shall be deployed by S.M.C.
(13) The contractor shall submit the advance Pour Card in prescribed form for the type of work which
he planned to carryout with the skilled / unskilled labour deployed by him for the work.
(14) The contractor shall establish concrete cube testing machine and other equipments required for
quality checking of materials as per instructions of PMC/ Engineer-In-charge.
(15) The contractor shall use the materials of the specified brands only. Request for equivalent brands
will be considered only if specified brand is not available in market.
(16) ACCIDENT LIABILITIES:
The Contractor shall be responsible for all liabilities under workman compensation act, as under:
(a) On occurrence of accident, resulting in death of workman employed by the Contractor which
is so serious as is likely to result in death of such workman who meet with accident, the
Contractor shall within 24 hours of accident, will intimate in writing to Engineer-in-charge of
such incidence. The Contractor shall indemnify client, against all looses/damages sustained by
the client resulting directly or indirectly from his failure to give such intimation to client
including penalties/fins if any, payable by client as a consequence of client's failure to give
notice under workman’s compensation act or otherwise to conform the provision of this act in
regard to such accidents.
(b) In case when such compensations as above becomes payable under workman’s compensation
act, whether by contractor or by client as principal employer, it shall be law full for the Engineer-
in-charge to retain out of money due and payable to the Contractor, such sum or sums of money
as may in the opinion of the Engineer-in-charge be sufficient to meet such a liability, the opinion
of the Engineer-in-charge shall be final in regard to all matters arising under this clause.
(17) INSURANCE:
The Contractor shall take "All Contract Risk Insurance Policy" for the estimated cost of this work
"Work's Man Compensation Policy" for all workers and labours of contractor and client working
site and "Third Party Insurance Policy" to fully cover all third party type risk. The insurance
policy so taken by the Contractor for such purposes shall be in the joint name of the Contractor
and the client and the policy shall be deposited with the client.
Contractors shall have to use maximum machinery for the work as per the direction of Engineer-
In-Charge. If possible, space for stacking the surplus excavated earth will be provided by SMC.
Otherwise the contractor shall arrange for the same at no extra cost to SMC.
(18) Contractor has to fixed display board describing the necessary information / particulars of work
at specific location and shall submit the evidence to engineer-in-charge along with
photographs.otherwise , 0.25% to 1.0% of tender amount as per description of engineer-in-charge
shall be kept hold,while making payment to the contractor until the evidences as stated above is
submitted. No extra payment shall be payable for fixing display boards.
(19) The Contractor shall paint building numbers & Flat numbers as per guideline of SMC without
any extra payment.
(20) PLEASE READ CAREFULLY
Following details pertaining to work progress is mandatory.
(A) Bar chart: Contractor shall submit barchart showing schedule of execution of various
activities within stipulated time limit
(B) Material Management : Contractor shall provide following details
Source of materials i.e. yellow earth, Coarse aggregate, Grit, fine aggregates,
bricks, cement, steel etc.
Supply schedule : According to bar chart, the flow diagram of materials.
(1) Man power management :
The contractor shall submit details of manpower of various categories (skilled &
unskilled labours) to be deployed for the work as under.
Minimum no. of skilled and unskilled labors to be deployed on the work
List of supervisors & engineers for supervision & quality control of the work.
(21) All the applicant contractors are required to have their own employers code number under EPF
Act, 1952 and are required to comply the applicable provisions of said statute regularly and
(22) Further the contractors for services are required to produce the certified copies of paid challans in
respect of employees/workers employed by said contractor in respect of work allotted by Surat
Municipal Corporation, along with copies of Pay Roll and Muster Roll. If the same are not
produced, the bills will not be released.
(23) Neutral Technology option:
If Contractor wish to submit a Bid with Neutral Technology construction then contractor
has to submit detail methodology and Subsidised Material used in constrcution with detail
specification of each and every material. Contractor have also to submit detail total
estimate with rate justification of each and evey non-conventional item in a seperate offer
The contractor has to provide following certificates for any non-conventional materials /
technology from CBRI (Central Buliding Rsearch Institute) or IIT (Indian Institute of
Technology) or International Affiliate Institution
1. Certificate of minimum life of structure of 50 years
2. Certificate of testing of materials which includes
Fire resistance capacity of the structure
Thermal and energy efficienct certificate
Stability certificate of resistance to the natural Disasters like Flood, Earth
quake, Cyclone.
The material / Technology should be Eco-friendly.
Executive Engineer
SIGNATURE OF THE CONTRACTOR Surat Municipal Corporation
SPECIAL CONDITIONS OF CONTRACT
Clause given under these special conditions shall be read in conjunction with conditions of
the contract and in case of any conflict the provisions of special conditions will
override the provisions of general conditions of contract.
The tenderer shall acquaint himself with the access to site, availability of local
facilities such as transport, materials, labour and shall price his tender accordingly.
1.2 ROAD INFRASTRUCTURE :
The bidder shall acqaint himself with the access to site. The successful tenderer shall
have make road and other infrastructure facility for the easy access to the site at his own
All the safety and entry rules shall be strictly followed. The contractor is fully
responsible for the safety of his staff and workmen and must equip them with safety
appliances and tools.
1.4 TIME SCHEDULE :
The work shall be executed strictly as per the time schedule/bar chart submitted
alongwith price bid offer. The entire job/project has to be completed within a period of
(Twelve) months (Including monsoon) from the Date of placement of order .The time limit
includes the time limit required for testing, rectification, if any, retesting and completion in all
respect to the entire satisfaction of the Engineer-in-charge. The timely completion of this
project is very very important for the citizen of Surat City, and hence weightage will be
given on strict compliance of work as per the sanctioning schedule of work/bar chart.
1.5 Penalty for delay :
If the contractor fails to complete the whole project by the stipulated completion date, he
shall also pay liquidated damages at one fifth of one percent i.e. 0.2% of tender amount per
day of delay in completion and handing over the work to the Surat Municipal Corporation.
The amount of liquidated damages shall however be subjected to maximum of ten (10)
percent of the tender amount. Delays in excess of one hundred days will be a cause for
termination of contract and for feiture of all per performance security.
1.6 Scope of Supply of material :
(a) Supply of material :
All materials, consumables, testing applicances, tools, tackles and spares etc. necessary
for the successful execution completion, and maintenance till handing over to S.M.C. shall be
procured and provided by the tenderer. No materials will be supplied by the owner. Except
mention in Schedule -`A.
Contractor shall have to make his own arrangement for water required for construction,
testing and for his labour/employees too.
Power required for the constructions, erection and other allied job shall be arranged by the
contractor at his own cost.
The Contractor shall have to make his own arrangement for getting electric power. The
S.M.C. will issue only recommendation letter to the contractor if required. No
compensation shall be paid for delay in getting power supply.
Cement required for the construction shall be arranged by the contractor at his own cost.
All types of TMT reinforcement steel shall be arranged by the contractor at his own cost.
1.7 Construction of Stores and site office :
Suitable areas will be allocated by the S.M.C. to the Contractor to build storages for storing
his equipments, plant, materials etc. and also to build his site offices. He will be solely
responsible for watching and guarding of his stores, offices etc.
The contractor shall cover all his equipments and materials at site with requisite insurance
against theft, larceny, decoity, fire tempest, flood earthequake etc.
On completion of the works undertaken by the contractor, he shall remove all temporary
works erected by him and have the site cleaned as directed by the Engineer. The S.M.C.
reserves the right to ask the contractor any time during the tenure of the contract to vacate the
land by giving 7 day's notice on security reasons or on national interest or otherwise.
1.8 Labour and supervisory Camps:
No land will be provided by the S.M.C. to the Contractor for constructing his labour
and supervisory camps and other service facility. Contractor shall make his own
arrangements outside the site boundary.
1.9 Construction Equipments :
The contractor shall make his own arrangement to procure all constructional plant and
equipments for his own. He shall also state the type and number of different equipments
with their capacities in good working conditions which he will use on the site to ensure
completion of the work in the specified time.
All materials, construction plants and equipments once brought by the contractor to site are
not to be removed from there without the written authority of the Engineer-in-charge.
Also, the Contractor shall have adequate stock of spare parts for the equipment on the site
and work shall not be delayed on this account. Similarly all temporary works built by the
Contractor for the main construction undertaken by him, are not be dismantled and removed
without the written authority of the the Engineer-in- charge.
1.10 Co-operation with other contractors :
The contractor shall execute his work in phased manner as directed by the Engineer from
time to time so as not to obstruct or retard the work being executed simultaneously by other
The contractor shall be responsible for provision of safety arrangement and protective
clothing for all operators on the site whether or not engaged in actual operation of
supervision. The contractor shall also be responsible for safety arrangmenets of all
equipment used for construction and shall employ trained workmen conversent with
safety regulation. The contractor shall use only tested equipment and tools and shall
periodically renews tests to the satisfaction of the Engineer. All test certificate shall be made
available to the Engineer at the site of the work. If at any time, in the opinion of the Engineer,
this provision is not completion with, the Contractor shall forthewith replace such
equipment and tools.
The contractor shall display notices and arrange proper fencing at such places where
hazardous work is being carried out. The contractor shall provided at his own expense on the
works to the satisfaction of the Engineer at such places, proper and sufficient fire tighting, first
and applicances etc. which shall at all times be available for use.
1.12 The contractor shall have to take photographs during various stages of construction
activity for each of the work at no extra cost. The photograph shall be of size 4" x 6" on mat
paper. The number of photographs shall be not be less than
1.13 No mobilisation advance will be paid.
1.14 It is further to clarify that, the retention money deducted from each running bill will be
released at the time of final bill. The security deposit remitted by the contractor will be
released after the completion of defect liability period.
1.15 No compensation of any item shall be paid in case any of the item is omited i.e. not executed
1.16 It is clarify once again that, the serviceable materials obtained during
dismentaling/clearing of the site or the extra excavated stuff shall have to be carted by the
contractor at the places shown by the Engineer-in-charge any where within city limit.
1.17 Out of the amount payable/creditable to contractor's account, the Central Government/State
Government tax/taxes shall be deducted at source in accordance with the relevant laws/rules
from time to time prevailling.
1.18 Surat Municipal Corporation shall not provide `C' form for tax purpose.
Executive Engineer
Surat Municipal Corporation
Signature of the Contractor:-
IMPORTANT INSTRUCTION-B TO TENDERER
Affix Latest Passport Size Photo of
Specimen Signature of the Bidder.
[2] AFFIX LATEST PASSPORT SIZE PHOTOGRAPH OF ALL PARTNERS IN CASE OF PARTNERSHIP
Specimen Signature of all partners incase of partnership agency.
Submission of Registered
2._____________________________ Agreement is compulsory
in case of partnership
3. Submission of income tax clearance certificate of last three years is compulsory for tenderer submitting
4. Submission of sale tax certificate, with proof of residence is compulsory for tenderer.
5. In case of Government royalty applicable to tenderer, it is compulsory to submit a receipt of royalty
payment with tender.
6. The Photograph and specimen signature of contractor will be cross checked, whenever contractor receives
payment in account section of SMC.
7. The specimen signature of contractor will be cross checked by Account Department of SMC, in case of
representative of Contractor alongwith letter of authority of a person who signed an agreement, receives
8. In case of octroi applicable to the goods of supplier/tenderer, the tenderer/suppler has to submit an attested
copies of Xerox of all octroi receipts.
EXECUTIVE ENGINEER,
SURAT MUNICIPAL CORPORATION
SIGNATURE OF THE CONTRACTOR.
SPECIFICATIONS OF MATERIALS
Note:- Consider latest revision of the said I.S. wherever its applicable.
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalies, salts, organic matter and
other deleterious material which will either weaken the mortar or concrete or cause effloresence or
attack the steel in R.C.C. Container for transport, storage and handling of water shall be clean.
Water shall conform to the standards specified in I.S. 456-1978.
1.2 If required by the Engineer-in-charge it shall be tested by comparision with distilled water.
Comparision shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S. 269-1976. Any indication of unsoundness, change in time of setting
by 30 minutes or more or decrease of more than 10 percent in strength of mortar prepared with
water sample when compared with the results obtained with mortar prepared with distilled water
shall be sufficeint cause for rejecttion of water under test.
1.3 Water for curing mortar, concrete or masonary should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise interfere
with the hardening of mortar or concrete during curing or those which produce objectionable stains or
other unsightly deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Portable water shall generally be found suitable for curing mortar or concrete.
2.1 Lime shall be hydraulic lime as per I.S. 712-1973. Necessary tests shall be carried out
as per I.S. 6932 (Parts I to X)
2.2 The following field tests for limes are to carried out ---
a] A very rough idea can be formed about the type of lime by its visual examination i.e. fat
lime bears pure white colour, lime in form of porous lumps of dirty white colour, indicates
quick lime, and solid lumps the unbrunt lime stone.
b] Acid tests for determining the carbonate content in lime. Excessive amount of impurities and
rough determination of class of lime.
2.3 Storage shall comply with I.S. 712-1973. The slaked lime, if stored, shall be kept in a
weather proof and damp proof shed with impervious floor and sides to protect it against rain,
moisture, weather and extraneous materials mixing with it. All lime that has been damaged in any
way shall be rejected and all rejected materials shall be removed from site of work.
2.4 Field testing shall be done according to I.S. 162-1974 to show the acceptaibility of materials.
3.1 Cement shall be ordinary portland cement of 53 grade as per I.S. 12269/87 (with latest
ammendment) namely Ambuja, Ultra tech, Sanghi, Hathi, Sidhdhi, J.K.Laxmi.
M-4 WHITE CEMENT :
4.1 The white cement shall conform to I.S. 8042-1978.
M-5 COLOURED CEMENT :
5.1 Coloured cement shall be with white or grey portland cement as specified in the item of the
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed
10% of cement used in the mix. The mixture of pigment and cement shall be properly ground to have a
uniform colour and shade. The pigments shall have such properties as to provide for durability under
exposure to sun-light and weather.
5.3 The pigment shall have the properly such that it is neigher affected by the cement not
detrimental to it.
6.1 Sand shall be natural sand, clean, well graded, strong, durable and gritty particles free
from injurious amounts of dust, clay, kankar nodules, soft or flaky particles, shale, alkaly, salts,
organic mater, loam, mica or other deleterious substances and shall be got approved from the
Engineer-in-charge. The sand shall not contain more than 8% of silt as determined by field tests. If
necessary the sand shall be washed to make it clean.
6.2 Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse shall be as under ---
I.S.Sieve % by weight I.S.Sieve % by weight
Designation passing sieve Designation passing sieve
6.3 Fine Sand : The finess modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
I.S.Sieve % by weight I.S.Sieve % by weight
Designation passing thru’ Designation passing thru’
M-7 STONE DUST :
7.1 This shall be obtained from crushing hard black tray or equivalent, it shall not contain
more than 8% of silt as determined by field test with measuring cylinder. The method of determining
silt contents by field test is given as under.
7.2 A sample of stone dust to be tested shall be placed without drying in 200 mm measuring
cylinder. The quantity of the sample shall be such that it files the cylinder upto 100 mm mark. The
clean water shall be added upto 150 mm mark. The mixture shall be stirred vigorously and the content
allowen to settle for 3 hours.
7.4 The height of silt visible as settled layer above the stone dust shall be expressed as percentage
of the height of the stone dust below. The stone dust containing more than 8% silt shall be washed
so as to bring the silt content within the allowable limit.
7.5 The fineness modulus of stone dust shall not be less than 1.80.
M-8 STONE GRIT :
8.1 Grit shall consist of crushed or broken stone and be hard, strong, dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent proper adhesion of mortar.
Grit shall generally be cubical in shape and as far as possible flaky elongated pieces shall be
avoided. It shall generally comply with the provisions of I.S. 383-1970. Unless a special stone of a
particularly quarry is metnioned, grit shall be obtained from the best black trap or equivalent hard
stone as approved by the Engineer-in-charge. The grit shall have no deleterious reaction with
8.2 The grit shall conform to the following gradation as per sieve analysis :
I.S.Sieve % passing thru’ I.S.Sieve % passing thru’
Designation sieve Designation sieve
8.3 The crushing strength of grit will be such as to allow the concrete in which it is used to
build-up the specified strenght of concerte.
8.4 The necessary tests for grit shall be carried out as per the requirements of I.S. 2338 (Parts I
to VIII)1963, as per instruction of the Engineer-in-charge. The necessity of test will be decided by
the Engineering-in-charge.
9.1 Cinder is well brunt furnace residue which has been fused or ssintered into lumps of varying
9.2 Cinder aggregates shall be well burnt furnace residue obtained from furnace using
coal fuel only. It shall be sound clead and free from clay, dirt, ash or other deleterious matter.
9.3 The average grading for cindar aggregates shall be as mentioned below :-
M-10 LIME MORTAR :
10.1 LIME : Shall conform to specification M-2. WATER : Water shall conform to specification
M-1. SAND : Sand shall conform to specification M-6.
10.2 PROPORTION OF MIX Mortar shall consist of such proportions of slaked lime and
sand as may be specified in the item. The slaked lime and shall shall be measured by volume.
10.3 PREPARATION OF MORTAR Lime mortar shall be prepared by wet process as per
I.S. 1625-1971. Power driven mill shall be used for preparation of lime mortar. The slaked lime shall
be placed in the mill in an even layer and ground for 180 revolutions with sufficient water.
Water shall be added as required during grinding (care being taken not to add more water) that
will bring the mixed material to a consistency of stiff paste. Thoroughly wetted sand shall then be
added evenly and the mixture ground for another 180 revolutions.
10.4 STORAGE : Mortar shall always be kept damp, protected from sun and rain till used up,
covering it by trapaulin or open sheds.
10.5 USE : All mortar shall be used as soon as possible after grinding. It should be used on the day
on which it is prepared. But in no case mortar made earlier than 36 hours shall be permitted for
M-11 CEMENT MORTAR :
11.1 Water shall conform to specification M-1. Cement shall conform to specification M-3. Sand
shall conform to M-5.
11.2 PROPORTION OF MIX : 11.2.1 Cement and sand shall be mixed to specified proportions,
sand being measured by measuring boxes. The proportion of cement shall be by volume on the basis
of 50 Kg./Bag of cement being equal to 0.0342 cu.m. The mortar may be hand mixed or machine
mixed as directed.
11.3 PREPARATION OF MORTAR : 11.3.1 In hand mixed mortar, cement and sand in the
specified proportions shall be thoroughly mixed dry on a clean impervious platform by turning over
atleast 3 times or more till a homogeneous mixture of uniform colour is obtained. Mixing
platform shall be so arranged that no deleterious extraneous material shall get mixed with mortar
or mortar shall flow out. While mixing, the water shall be gradually added and thoroughly
mixed to form a stiff plastic mass of uniform colour so that each particle of sand shall be completely
covered with a film of wet cement. The water cement ratio shall be adopted as directed.
11.4 The mortar so prepared shall be used within 30 minutes of adding water. Only such
quantity of mortar shall be prepared as can be used within 30 minutes.
M-12 STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
12.1 Coarse agrregate shall be of machine crushed stone of black trap or equivalent and be hard,
strong, dense, durable, clean and free from skin and coating likely to prevent proper adhesion of
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned aggregates shall be machine crushed from the best black trap or equivalent
hard stone as approved. Aggregrate shall have no deleterious reaction with cement. The size of
the coarse aggregate for plain cement concrete and ordinary reinforced cement concrete shall
generally be as per the table given below. However, in case of reinforced cement concrete the
maximum limit may be restricted to 6 mm. less than the minimum lateral clear distance between
bars or 6mm. less than the cover whichever is smaller.
I.S. Sieve Percentage passing for single I.S. Sieve Percentage passing for single
Designation sized aggregates of nominal size Designation sized aggregates of nominal
NOTE:- This percentage may be varied somewhat by the Engineer-in-charge when
considered necessary for obtaining better density and strength of concrete.
12.3 The grading test shall be taken in the beginning and at the change of source of materials.
The necessary tests indicated in I.S. 383-1970 and I.S. 456-1978 shall have to be carried out to
ensure the acceptability. The aggregates shall be stored separately and handled in such a manner as to
prevent the intermixng of different aggregates. If the aggregates are covered with dust, they shall be
washed with water to make, them clean.
M-13 BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
13.1 Aggregrate for Design Mix Concrete : Coarse aggregate shall be of machine crushed stone of
black trap or equivalent hard stone and be hard, strong, dense, durable,clean and free from skin and
coating likely to prevent proper adhesion of mortar.
13.2 The aggregates shall generally be cubical in shape, unless special stones of particular
quarries are mentioned, aggregrates shall be machine crushed from the best, black trap or
equivalent hard stones as approved. Aggregate shall have no deleterious reaction with cement.
13.3 The necessary tests indicated in I.S. 383-1970 and I.S. 456-1978 shall have to be carried
out to ensure the acceptability of the material.
13.4 If aggregate is covered with dust it shall be washed with water to make it clean.
M-14 BRICK BATS AGGREGATE :
14.1 Brick bat aggregate shall be broken from well burnt or slightly over burnt and dense
bricks. It shall be homogeneous in texture, roughly cubical in shape, clean and free from dirt of
any other foreign material. The brick bats shall be of 40 mm to 50 mm size unless otherwise
specified in the item. The underburnt or overburnt brick bats shall not be allowed.
14.2 The brick bats shall be measured by volume by suitable boxes as directed.
15.1 The bricks shall be hand or machine moulded and made from suitable soils and kiln
burnt. They shall be firee from cracks and flaws not nodules of free lime. They shall have
smooth rectangular faces with sharp corners and shall be of uniform colour. The bricks shall be
moulded with a frog of 100mm x 40 mm and 10mm to 20mm deep on one of its flat sides. The
bricks shall not break when dropped on the ground from a height of 600 mm.
15.2 The size of modular bricks shall be 190mm x 90mm x 90mm.
15.3 The sie of conventional bricks shall be as under --- 225 x 110 x 75mm.
15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall
be permitted in the conventional size adopted in a particular work.
Length : 3.00 mm
Width : 1.50 mm
Height : 1.50 mm
15.5 The crushing strength of the bricks shall not be less then 35 Kg./Sq.Cm. The average water
absorption shall not be more than 20% by weight. Necessary tests for crushing strength and
water absorption etc. shall be carried out as per I.S. 3495 (Part I to IV)-1976.
M-15A FLYASH BUILDING BRICKS :
The Flyash building bricks shall conform to Grade-5 of IS-13757. The frog of the 80 to 100 mm x
mm x 10 to 20 mm size.
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 230 mm x 110 mm x 70 mm. Only bricks of one standard size
shall used on one work. The following tolerances shall permitted in the conventional size adopted in
a particular work:
Length : + 4 mm
Width : + 2 mm
Height : + 2 mm
The physical characteristic of bricks shall be as follows.
The minimum compressive strength of Flyash building bricks shall not be less than 70 Kg/Sq.Cm. and
the test shall be conform to IS-3495 (Part-I).
The averages water absorption not more than 20 percentage by weight and the test shall conform to IS-
3495(Part-3). Sampling of Flyash building bricks and criteria for conformity shall be as per I.S.:5454.
16.1 The stone shall be of the specificied variety such as Granite/Trap stone/Quarzite or any
other type of good hard stones. The stones shall be obtained only from the approved quarry and
shall be hard, sound, durable and free from defects like cavities, cracks, sand holes, flaws,
injurious viens, patches of loose or soft materials etc. and weathered portions and other
structural defects or imperfections tending to affect their soundness and strength. The
stone with round surface shall not be more than 5% of dry weight. When tested in accordance with
I.S. 1134-1974. The minimum crushing strength of the stone shall be 200 Kg./Sq.Cm. unless
otherwise specified.
16.2 The samples of the stone to be used shall be got approved before the work is started.
16.3 The khanki facing stone shall be dressed by chisel as specified in the item for khanki
facing in required shape and size. The face of the stone shall be so dressed that the bushing on
the exposed face shall not project by more than 40 mm. from the general wall surface and on face to
be plastered it shall not project by more than 19 mm nor shall it have depressions more than
mm from the average wall surface.
M-17 LATERITE STONE :
17.1 Laterite stone shall be obtained from the approved quarry. It shall compacted in texture,
sound, durable and free from soft patches. It shall have a minimum crushing strength of
Kg/Sq.Cm. in its dry condition. It shall not absorb water more 20% of its own weight, when
immersed for 25 hours in water. After quarrying, the stone shall be allowed to weather for some
time before using in work.
17.2 The stone shall be dressed into rectangular blocks so that all faces are from waviness and
unevenness and the edges true and square.
17.3 Those type of stone in which white clay occurs should not be used.
17.4 Special corner stones shall be provided where so directed.
M-18 MILD STEEL BARS/TMT BARS :
18.1 Mild steel bars reinforcement TMT Bars for R.C.C. work shall FE 415/500 conform to I.S.
1786/85 (with latest ammendment) and shall be of tested quality. It shall also comply with the
relevant part of I.S. 456-1978 and revised latest I.S. Code.
18.2 All the reinforcement shall be clean and free form dirt, paint, grease, mill scale or loose or
thick rust at the time of placing.
18.3 For the purpose of payment the bar shall be measured correct upto 10 mm length and weight
payable worked out as per the rate specified below :
i] 6mm 0.22 Kg/Rmt. viii] 20mm 2.47 Kg/Rmt.
ii] 8mm 0.39 kg/Rmt. ix] 22mm 2.98 kg/Rmt.
iii] 10mm 0.62 kg/Rmt. x] 25mm 3.85 kg/Rmt.
iv] 12mm 0.89 kg/Rmt. xi] 28mm 4.83 kg/Rmt.
v] 14mm 1.21 kg/Rmt. xii] 32mm 6.31 kg/Rmt.
vi] 16mm 1.58 kg/Rmt. xiii] 36mm 7.31 Kg/Rmt.
vii] 18mm 2.00 Kg/Rmt. xiv] 40mm 9.86 Kg/Rmt.
M-19 HIGH YIELD STRENGTH STEEL DEFORMED BARS :
19.1 High yield strength steel deformed bars shall be either cold twisted or hot rolled and shall
conform to I.S. 1786/85 (with latest ammendment) and following makes TATA, SAIL, RINL,
Electrotherm,Ramasroop,National,JSW.
19.2 Other provision and requirements shall conform to specification No. M-18 for Mild
M-20 HIGH TENSILE STEEL WIRES :
20.1 The high tensile wires for use in prestressed concrete shall conform to I.S. 2090-1983.
20.2 The tensile strength of the high tensile steel bars shall be as specified in the item. In absence
of the given strength and minimum strength shall be taken as per para 6-1 of the I.S. 1785-1962.
Testing shall be done as per I.S. requirements.
20.3 The high tensile steel shall be free from loose mill scale, rust, oil, grease or any other harmful
matter. Cleaning of steel bars may be carried out by immersion in solvent solution, wire brushing
or passing through a pressure box containing carborundum.
20.4 The high tensile wire shall be obtained from manufactures in coils having diameter not less
than 350 times the diameter of wire itself so that wire springs back straight on being uncoiled.
M-21 MILD STEEL BINDING WIRE :
21.1 The mild steel wire shall be of 1.63mm or 1.22mm (16 or 18 guage) diameter and shall
conform to I.S. 280-1978.
21.2 The use of black wire will be permitted for binding reinforcement bars. It shall be
free from rust, oil, paint, grease, loose mill scale or any other undesirable coating which may prevent
adhesion of cement mortar.
M-22 STRUCTURAL STEEL :
22.1 All structural steel shall conform to I.S. 226-1965. The steel shall be free from the defects
mentioned in I.S. 226- 1975 and shall hae a smooth finish. The material shall be free from loose
mill scale, rust pits or other defects affecting the strength and durability. Rivet bars shall conform
22.2 When the steel is supplied by the contractor test certificates of the manufacturers
shall be obtained according to I.S. 226-1975 and other relevant Indiand Standards.
M-23 GALVANISED IRON SHEETS :
23.1 The galvanised iron sheets shall be plain or corrugated sheets of gauge as specified in
item. The G.I. Sheets shall conform to I.S. 277-1977. The sheets shall be undamaged in carriage
and handling either by rubbing off of zinc coating or otherwise. They shall have clean
and bright surface and shall be free from dents, bends, holes, rust or white powdery deposit.
23.2 The length and width of G.I. sheets shall be as directed as per site condition.
M-23-A G.I.VALLEYS GUTTER, RIDGES :
23-A.1 The G.I. ridges and hips shall be of plain galvanised sheets class-3 of the thickness as
specified in item. These shall be 600 mm width and properly bent up to shape without damage to the
sheets in process of bending.
23-A.2 Valleys gutters and flashings shall be also of galvanised sheet of thickness as specified in
item. Valleys shall be 900 mm. wide over all and flashing shall be 380 mm wide over all. They
shall be bent to the required shape without damage to the sheet in the process of bending.
M-24 ASBESTOS CEMENT SHEETS :
24.1 Asbests cement sheets plain, corrugated or semi-corrugated shall conform to I.S. 459-1970.
The thickness of the sheets shall be as specified in the item. The sheet shall be free from all defects
such as cracks, holes, deformities, chipped edges or otherwise damaged.
24.2 Ridges and Hips :
24.2.1 Ridges and hips shall be of same thickness as that of A. C. sheets. The types of ridges shall be
suitable for the type of sheets and locations.
24.2.2 Other accessories to be used in roof such as flashing pieces, eaves filler pieces, valley
gutters, north light and ventilator curves, barge boards etc. shall be of standard manufacture and
shall be suitable for the type of sheets and location.
M-25 MANGALORE PATTERN ROOF TILES :
25.1 The Mangalore pattern tiles shall conform to I.S. 654-1972 for Class `AA' or `A' type as
specified in item. Samples of the tiles to be provided shall got approved from the Engineer-in-
charge. Necessary tests shall be carried out as directed.
M-26 SHUTTERING :
26.1 The shuttering shall be either of wooden planking of 30mm minimum thickness with or without
steel lining or of steel plates stiffened by steel angles. The shuttering shall be supported on battens and
beams and props of vertical ballies properly cross bracked together so as to make the centering rigid. In
places of ballie props, bricks pillar of adequate section built in mud mortar may be used.
26.2 The form work shall be sufficiently strong and shall have camber, so that it assumes correct
shape after deposition of the concrete and shall be able to resist forces caused by vibration of concrete,
live load of men working with it and other incidental loads associated with it. The shuttering shall have
smooth and even surface and its joints shall not permit leakage of cement grout.
26.3 If at any stage of work during or after placing concrete in the structure, the form work sags or
bulges out beyond the required shape of the structure, the concrete shall be removed and work
redone with fresh concrete and adequately rigid form work.The complete form work shall be got
inspected by and approved from the Engineer-in-charge, before the reinforcement bars are placed in
26.4 The props shall consists of bullies having 100mm minimum diameter measured at mid
length and 80mm at thin end and shall be placed as per design requirement. These shall rest
squarely on wooden sole plates 40 mm. thick and minimum bearing area of 0-10 sq.m. laid on
sufficiently hard base.
26.5 Double wedges shall further be provided between the sole plate and wooden props so as to
facilitate tightening and easing of shuttering without jerking the concrete.
26.6 The timber used in shuttering shall not be so dry so as to absorb water from concrete and swell
or bulge nor so green or wet so as to shrink after erection. The timber shall be properly sawn and
planed on the sides and the surface coming in contact with concrete. Wooden form work with metal
sheet lining or steel plates stiffened by steel angles shall be permitted.
26.7 As far as practicable, clamps shall be used to hold the forms together and use of nails and
spikes avoided.
26.8 The surface of timber shuttering that would come in contact with concrete shall be well
wetted and coated with soap solution before the concreting is done. Alternatively coat of raw
linseed oil or oil of approved manufacture may be applied in place of soap solution. In case of
steel shutteirng either soap solution or raw linseed oil shall be applied after thoroughly cleaning the
surface. Under no circumstances black or burnt oil shall be permitted.
26.9 The shuttering for beams and slabs shall have camber of 4mm per metre (1 in 250) or as
directed by the Engineer-in-charge so as to offset the subsequent deflection. For cantilevers,
the camber at free end shall be 1/50 of the projected length or as directed by the Engineer-in-charge.
M-27 EXPANSION JOINTS - PREMOULDED FILLER :
27.1 The item provideds for expansion joints in R.C.C. frame structures for internal joints, as
well as exposed joints, with the use of premoulded bituminous joint filler.
27.2 Premoulded bituminous joint filler, i.e. performed stirp of expansion joint filler shall not get
deformed or broken by twisting, bending or other handing when exposed to atmospheric
condition. Pieces of joint filler that have been damaged shall be rejected.
27.3 Thickness of the pre moulded joint filler shall be 25 mm unless otherwise specified.
27.4 Premoulded bituminous joint filler shall conform to 1.5 1838-1961.
M-28 EXPANSION JOINTS - COPPER STRIPS AND HOLD FASTS :
28.1 The item provides for expansion joints in R.C.C. frame structure for internal joints as well
as for exposed joints with the use of necessary copper strip and holdfasts.
28.2 Copper sheet shall be 1.25 mm thick and of 1.25 mm with `U' shape in the middle, copper
strip shall have holdfast of 3 mm diameter copper rod fixed to the plate soldered on strip at intervals
of about 30 cm. or as shown in the drawing or as directed. The width of each flange (horizontal side)
of the copper plate to be embedded in the concrete work shall be 25 mm Depth of `U' to be provided in
the expansion joint, in the copper plate shall be of 25 mm.
M-29 TEAK WOOD :
29.1 The teak wood shall be of good quality as required for the item to be executed. When the
kind of wood is not specifically mentioned, good Indian teak wood as approved shall be used.
29.2 Teak wood shall generally be free from large, loose, dead or cluster knots, flaws, warps, twists,
shakes, bends or any other defects. It shall generally be uniform in substance and of straight fibres
as far as possible. It shall be free from rot, decay, harmful fungi and other defects of harmful nature,
which will affect the strength, durability or its usefullness for the purpose for which it is required.
The colour shall be uniform as far as possible. Any effort like painting, using any adhesive or resinous
materials made to hide the defects shall render the pieces liable to rejection by the Engineer-in-charge.
29.3 All scantlings, planks etc. shall be sawn in straight lines and planes in the direction of grains
and of uniform thickness.
29.4 The tolerances in the dimensions shall be allowed at the rate of 1.5 mm per face to be planed.
29.5 First Class Teak Wood :
First clas teak wood shall have no individual hard and sound knots, more than 6 sq.cm. in size and the
aggregate area of such knots shall not be more than 1% of area of piece. The timber shall be closed
29.6 Second Class Teak Wood :
No individual hard and sound knots shall be more than 15 sq.cm. in size and aggregate area of such
knots shall not exceed 2% of the area of piece.
M-29-A NON-TEAK WOOD :
The non teak wood shall be chemically treated, seasoned as per I.S. Specifications and of good
quality. The type of wood shall be got approved before collecting the same on site. Fabrication
of wooden members shall be started only after approval. For this purpose wood of Bio, Kalai, Sires,
Saded, Behda, Jamun, Sisoo will be used for door frames whereas only Kalai, Siras, ,Halda,
Kalam etc. will be permitted for shutters after proper seasoning and chemical treatment.
The non teak wood shall be free from large, loose dead of cluster knots, flows, shakes, warps,
bends, or any other defect. It shall be uniform in substance and of straight fibres as far as possible.
It shall be free from rots, decay, harmful fungi and other defects of similar nature which will
affect the strength, durability or its usefullness for the purpose for which it is required. The colour of
the wood shall be uniform as far as possible. The scantalings, planks etc. shall be sawn in straight lines
and planes in the direction of grain and of uniform thickness.
The department will use the Agency to produce a certificate from the Forest Department in the event of
a dispute and the decision of the Department shall be final and binding to the contractor.
The tolerance in the dimension shall be allowed at 1.5 mm. per face to be planed.
M-30 WOODEN FLUSH DOOR SHUTTERS (SOLID CORE) :
30.1 The solid core type flush door shutters shall be of decorative or non-decorative type as
specified in the drawing. The size and thickness of the shutter shall be as specified in drawings or
as directed. The timber species for core shall be used as per I.S. 2202-(Part-I)-1980. The timber
shall be free from decay and insect attack. Knots and knot holes less than half the width of cross-
section of the members, pitch streaks and harmless pin holes shall be permissible except in the
exposed edges of the core members. The commercial plywood, cross bands shall conform to I.S.
30.2 The face panel of the shutters shall be formed by gluing by the hot press process on both faces
of the core with either plywood or corss bands, and face veneers. The lipping, rebating, opening
of glazing, venetion etc. shall be provided if specified in the drawing.
30.3 All edges of the door shutters shall be square. The shutters shall be free form twist or
warp in its plane. Both faces of the shutters shall be sand papered to smoot even texture.
30.4 The shutters shall be tested for ---
i] End Immersion Test : The test shall be carried out as per I.S. 2202 (Part-I) 1980. There
shall be no delamination at the end of the test.
ii] Glue Adhesion Test : The flush door shall be tested for glue adhesive test in accordance
with I.S. 2202(Part-I)-1980. The shutters shall be considered to have passed the test if no
delamination occurs in the glue lines in the plywood and if no single delamination more than 80 mm.
in length and more than 3 mm. in depth has occured in the assembly glue lines between the
plywood face and the style and rail. Delamination at the corner shall be measured continously
around the corner. Delamination at the knots knot, hole and other permissible wood defects
shall not be considered in assessing the sample.
30.5 The tolerance in size of solid core type flush door as under:-
In nominal thickness # 1.2 mm. In nominal height # 3 mm. The thickness of the shutters shall be
uniform throughout with a permissible variation of not more than 0.8 mm. when measured at any two
M-31 ALUMINIUM DOORS, WINDOWS, VENTILATORS :
31.1 Aluminium alloy used in the manufacture of extruded window sections shall conform to
I.S. desgnation HEA-WP of I.S. : 733-1975 and also to I.S. Designation WVG - WP OF I.S. : 1285-
1975. The sections shall be as specified the drawing and design. The fabrication shall be done as
31.2 The hinges shall be cast or excluded aluminium hinges of same type as in window but or
31.3 The hinges shall normally be of 50 mm projecting type non projecting type of hinges
may also be used if directed. The handles of door shall be of specified design. A suitable lock for
the door operable either from outside shall be provided. In double shutter door, the first closing
shall have a concealed aluminium alloy bolt at top and bottom.
M-32 ROLLING SHUTTERS :
32.1 The rolling shutters shall conform to I.S. 6248-1979. Rolling shutters shall be supplied of
specified type with accessories. The size of the rolling shutters shall be specified in the drawings. The
shutters shall be constructed with interlocking lath sections formed from cold rolled steel strips not
less than 0.9 mm. thick and 80 mm. wide for shutters upto 3.5 m. Width not less than 1.25 mm. thick
and 80 mm. wide for shutters 3.5 m. in width and above unless otherwise specified.
32.2 Guide channels shall be of mild steel deep channel section and of rolled pressed or built up
(fabricated) jointless construction. The thickness of sheet used shall not be less than 3.15 mm.
32.3 Hood covers shall be made of M.S. sheets not less than 0.92 mm. thick. For shutters having
width 3.5 mts. and above, the thickness of M.S. sheet for the hood covers shall be not less than
32.4 The spring shall be of best quality and shall be manufactured from tested high tensile
spring steel wire or strip of adequate strength to balance the shutters in position. The spring pipe
shaft etc. shall be supported on strong M.S. or malleable C.I. brackets. The brackets shall be fixed on
the or under the lintel as specified with rawl plugs and screws bolts etc.
32.5 The rolling shutters shall be of self rolling type upto 8 sq.m. clear area without ball bearing
and upto 12 sq.m. clear area with ball bearing. If the rolling shutters are of larger then gear
operated type shutters shall be used.
32.6 The locking arrangement shall be provided at the bottom of shutter at both ends. The
shutters shall be opened from outside.
32.7 The shutters shall be completed with door suspension, shafts, locking arrangements,
pulling hooks, handles and other accessories.
M-33 COLLAPSIBLE STEEL GATE :
33.1 The collapsible steel gate shall be in one or two leaves and size as per approved drawings or as
specified. The gate shall be fabricated from best quality mild steel channels, flates etc. Either steel
pulleys or ball bearings shall be provided in every double channel. Unless otherwise specified
the particulars of collapsible gate shall be as under ---
i] Pickets : These shall be of 20 mm. M.S. channels of heavy sections unless otherwise shown on
drawings. The distance centre to centre of pickets shall be 12 cms. with an opening of 10 cms.
ii] Pivoted M.S. flats shall be 20 mm. x 6 mm.
iii] Top and bottom guides shall be from tee or flat iron of approved size.
iv] The fittings like stoppers, fixing hold fasts, locking cleats, brass handles and cast iron
rollers shall be of approved design and size.
M-34 WELDED STEEL WIRE FABRIC :
34.1 Welded steel wire fabric for general purpose shall be manufactured from cold drawn steel
`as drawn' or galvanised steel conforming to I.S. 226-1975 With longitudinal and transverse wire
seurely connected at every intersection by a process of electrical resistance welding and conforming
to I.S. 4948-1974. It shall be fabricated and finished in a workman like manner and shall be free from
injurious defects and shall be ruest proof. The type of mesh shall be oblong or square as directed. The
mesh sizes and sizes of wire for square as well as oblong welded steel wire fabric shall be as directed.
The steel wire fabric in panels shall be in one whole piece in each panel as far as stock sizes permit.
M-35 EXPANDED METAL SHEETS :
35.1 The expanded metal sheets shall be free from flaws, joints, welds, broken, stands,
laminations and other harmful surface defects Expanded metal steel sheet shall conform to I.S. 412 -
1975 except that blank sheets need not be with guaranteed mecanical properties. The size of the
diamond mesh of expanded metal and dimensions of strands (width and thickness) shall be as
specified. The tolerance on nominal weight of expanded metal sheets shall be of + 10 per cent.
35.2 Expanded metal in panels shall be in one whole piece in each panel as far as stock sizes
permit. The expanded metal sheets shall be coated with suitable protective coating to prevent corrosion.
M-36 MILD STEEL WIRE (Wire Gauze Jali) :
36.1 Mild steel wire may be galvanised, as indicated. All finished steel wire shall be well
cleanly drawn to the dimensions and size of wire as specified in item. The wire shall be sound, free
from slits, surface flaws, rough jagged and imperfect edges and other harmful surface defects and
shall conform to I.S. 280-1978.
37.1 The Plywood for general purpose shall conform I.S. 303-1975. Plywood is made by
cementing together thin boards or sheets of wood into panels. There are always an old number of
layers 3, 5, 7, 9 ply etc. The plies are placed so that the grain of each layer is at right angles to the
grain in the adjacent layers.
37.2 The chief advantage of plywood over a single board of the same thickness is the more
uniform strength of the plywood along the length and width of the plywood and greater resistance
to cracking and slitting with change in moisture content.
37.3 Usually synthetic resins are used for gluieg. Phenolic resins are usually cured in a hot
press which compresses and simultaneously heats the plies between hot plates which maintain a
temperature of 90 degree C. to 140 degree C. and a pressure of 11 to 14 Kg./Sq.cm. on the wood. The
time of heating may be any thing from 2 to 60 minutes depending upon thickness.
37.4 When water glue are used the wood absorbs so much Water that the finished plywood must be
dried carefully, When synthetic resins are used as adhesive the finished plywood must be exposed
to atmosphere of controlled humidity until the proper amount of moisture has been absorbed.
37.5 According to I.S. : 303-1975 the plywood for general purpose shall be of three grades namely
BWR.WWR and CWR depending upon the adhesives used for bonding the veneers and it will be
further classified into six types namely AA, AB, AC, BB, BC and CC based on the quality of the two
faces, each face being of three kinds namely A, B and C. After pressing, the finished plywood should
be reconditioned to a moisture content not less than 8 percent and not more than 16 percent..
37.6 THICKNESS OF PLYWOOD BOARDS
Board Thickness
38.1 All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air holes
blisters and other defects. The kind of glass to be used shall be as mentioned in the item or
specification or in the special provisions or as shown in detailed drawings. Thickness of glass panes
shall be uniform. The specifications for different kinds of glass shall be as under ----
38.2 Sheet Glass :
38.2.1 In the absence of any specified thickness or weight in the item or detailed specifications of
the item of work, sheet glass shall be weighing 7.5 Kg./Sq.m. for panes upto 600 mm. x 600 mm.
38.2.2 For panes larger than 600 mm. x 600 mm. and upto 800 mm. x 800 mm. glass weighing not
less than 8.75 Kg./Sq.m. shall be used. For bigger panes upto 900 mm. x 900 mm. glass
weighing not less than 11.25 Kg./Sq.m. shall be used.
38.2.3 Sheet glass shall be patent flattened glass of best quality and for glasing and framing purposes
shall conform to I.S. 761-1960. Sheet glass of the specified colours shall be used, if so shown on
detailed drawings or so specified. For important buildings and for panes with any dimensions over
mm. plate glass of specified thickness shall be used.
38.3.0 Plate Glass :
38.3.1 When plate glass is specified it shall be "Polished Patent Plate Glass" of best quality.
It shall have both the surface ground flate and parallel and polished to obtain clear undistured
vision and reflection. The plate glass shall be of the thickness mentioned in the item or as shown in
the detailed drawing or as specified. In the absence of any specified thickness, the thickness of
plate glass to be supplied shall be 6 mm. and a tolerance of 0.20 mm. shall be admissible.
38.4.0 Obscured Glass :
38.4.1 This type of glass transmits light so that vision is partially or almost completely
obscured. Glass shall be plain rolled, figured, ribbed or fluted, or frosted glass as may be specified
as required. The thickness and type of glass shall be as per details on drawings or as specified or
38.5.0 Bajari Glass :
Glass shall be with bajari pattern embedded in a sheet of plane glass. It should be of best quality as
approved by Engineer-In-Charge. Thickness of glass shall not be less than 4 mm. bajari glass shall be of
type and thickness as specified.
M-39 ACRYLIC SHEETS :
39.1 Acrylic sheets shall be of thickness as specified in the item and of a specified shape and
size as the case may be Penels may be flat or curved. It should be light in weight. It shall be colourless
or coloured or opaaue as specified in the item. Colourless sheet shall be as transparent as the finest
optical glass. Its light transmission rate shall be about 95%. Transparancy shall not be affected for the
sheets of larger thickness. It shall be extremely resistant to sunlight, weather and low
temperatures. It shall not show any significant yellowing or change in physical properties or loss of
light transmission over a longer period of use.
The sheet shall be impact resistant also. Sheets should be available in complete range of
standard transparent, translucemtn and opaque colours. Sheets should be available in complete range of
standard transparent, translucent and opaque colours. Sheets shall be of such quality
that they can be cut, bent and jointed as desired. Solution for the joints shall be used as per the
requirement of manufacture.
M-40 (A) PARTICLE BOARD :
40.1 The particle boards used for face panels shall of best quality free from any defects. The
particle boards shall be made with phenolmaldehyde adhesive. The particle boards shall conform
to I.S. 3087-1965. "Specification for wood particle board for general purpose." The size and the
thickness of the particle board shall be as specified.
M-40 (B) CEMENT BONDED PARTICLE BOARD :
1. The particle board should confirm to IS-14276-1995 or latest.
2. It should be free from any cracks and flacks.
3. Cement bonded Particle board may be replaced by any other equivalent material as suggested
Engineer-In-Charge
M-41 EXPANDED POLYSTYRENE OR FRAMES STYROPER SLEBS :
41.1 The expanded polystyrene ceiling boards and tiles shall be of approved make and shall be of
size thickness, finish and colour and indicated. It shall be of high density and suitable for use as
insulting material. The insulting material shall be like slab of thermocole etc.
M-42 RESIN BONDED FIBRE GLASS
42.1 The resin bonded fibre glass tiles or rools shall be of approved make and shall be sizes, thickness
and finish as indicated.
42.2 For test of Mineral wood thermal insulation Blanket I.S. 3144-1965 followed.
42.3 Insulation wool blanket shall be with the following coverings on one or both sides as
(1) Bituminised bessian kraft paper suitable for use in position where moisture has to be excluded.
(2) Hessain cloth or Kraft paper for keeping out dust.
(3) G. I. wire netting, suitable or surfaces to be plastered over.
M-43 FIXTURES & FASTENINGS :
i] The fixtures and fastenings, that is, butt, hingers, tee and strap hinges, sliding door bolts,
tower bolts, door latch, bath-room latch, handles, door stoppers, casement window fasteners,
casement stays and ventilator catch shall be made of the metal as specified in the item or its
specifications.
ii] They shall be of iron, brass, aluminium, chromium plated iron, chromium plated brass,
copper oxidised iron, copper oxidised brass or anodised aluminium as specified.
iii] The fixtures shall be heavy, medium or light type. The fixtures and fastenings shall be
smooth finished and shall be such as will ensure ease of operation.
iv] The samples of fixtures and fastenings shall be got approved as regards quality and shape
before providing them in position.
v] Brass and anodised aluminium fixtures and fastenings shall be bright finished.
i] Holdfasts shall be made from mild steel flat 30 cm. length and one of the holdfasts shall be
bent at right angle and two nos. of 6 mm. dia. hooles shall be made in it for fixing it to the frame with
screws. At the other end, the holdfast shall be forked and bent at right angles in opposite
i] Railway standard heavy type butt hinges shall be used when so specified.
ii] Tee and strap hinges shall be manufactured from M.S. sheet.
Sliding Door Bolts (Aldrops) :
i] The aldrops as specified in the item shall be used and shall be got approved.
Tower Bolts (Barrel Type) :
i] Tower bolts as specified in the item shall be used and shall be got approved.
i] The size of door latch shall be taken as the length of latch.
Bathroom Latch :
i] Bathroom latch shall be similar to tower bolt.
i] The size of the handles shall be determined by the inside grip length of the handles.
Handles shall have a base plate of length 50 mm. more than the size of the handle.
Door Stoppers :
i] Door stoppers shall be either floor door stopper type or door catch type. Floor stopper shall be
of overall size as specified and shall have a rubber cushion.
i] Door catch shall be fixed at a height of about 900 mm. from the floor level such that one part of
the catch is fitted on the inside of the shutter and other part is fixed in the wall with necessary
wooden plug arrangements for appropriate fixity. The catch shall be fixed 20 mm. inside the face of
the door for easy operation of catch.
Wooden Door Stop With Hinge :
i] Wooden door stop of size 100 mm. x 60 mm. x 40 mm. shall be fixed on the door frame with
a hinge of 75 mm. size and at a height of 900 mm. from the floor level. The wooden door stop shall be
provided with 3 coats of approved oil paint.
Casement Window Fastner :
i] Casement window fastener for single lead window shutter shall be left or right handed as
Casement Stays (Straigot Peg.Stay) :
i] The stays shall be made from a channel section having three holes at appropriate position so
that the window can be opened either fully or partially as directed.
Size of the stay shall be 250 mm. to 300 mm. as directed.
Ventilator Catch :
i] The pattern and shape of the catch shall be as approved.
i] The base and socket plate shall be made from minimum 3 mm. thick plate, and projected pivot
shall not be less than 12 mm. dia. and 12 mm. length and shall be firmly riveted to the base plate case
of iron pivot and in single piece base in the case of brass pivot.
44.1 Oil Paints :
Oil paints shall be of the specified colour and shade, and shall be of Asian, ICI, Nerolac, Dulux
or equivalent as approved by Engineer-In-Charge. The ready mixed paints shall only be used. However,
if ready mixed paint or specified shade or tint is not available white ready mixed paint with approved
stainer will be allowed. In such a case, the contractor shall ensure that the shade of the paint so
allowed shall be uniform. All the paints shall meed with the following general requirements ---
i] Paint shall not show excessive setting in a freshly opened full can and shall easily be
redispressed with paddle to a smooth homogeneous state. The paint shall show no curdling,
livering, caking or colour separation and shall be free from lumps and skins.
ii] The paint as received shall brush easily, possess good levelling properties and show no
running or sagging tendencies.
iii] The paint shall not skin within 48 hours in a three quarters filled closed container.
iv] The paint shall dry to a smooth uniform finish free from roughness, grit uneveness and other
Ready mixed paid shall be used exactly as received from the manufacturers and generally according to
their instructions and without any admixtures whatsoever.
44.2 Enamel Paints :
The enamel paint shall satisfy in general requirements as mentioned in specification of oil paints.
Enamel paints shall conform to I.S. 2933-1975.
M-45 FRENCH POLISH :
The french polish of required tint and shade shall be prepared with the below mentioned
ingredients and other necessary materials :
i] Denatured spirit of approved quality.
The french polish so prepared shall conform to I.S. 348-
M-46 MARBLE CHIPS FOR MARBLE MOSAIC TERRAZZO :
46.1 The marble chips shall be of approved quality and shades. It shall be hard, sound, dense and
homogeneous in texture with crystalline and coarse grains. It shall be uniform in colour and free
from stains, cracks, decay and weathering.
46.2 The size of various colours of marble chips ranging from the smallest upto 20 mm. shall be
used where the thickness of top wearing layers is 6 mm. in size. The marble chips of approved
quality and colours only as per grading as decided by the Engineer-in-charge shall be used for
marble mosaic tiles or works.
46.3 The marble chips shall be machine crushed. They shall be free from foreign matter, dust etc.
Except as above the chips shall conform to I.S. 2114-1962.
M-47 FLOORING TILES :
A] Plain Cement Tiles –
47.1.1 The plain cement tiles shall be of general purpose type. These are the tiles in the manufacture
of which no pigments are used. Cement used in the manufacture of tiles shall be as per Indian
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TB_04 SCHOOL MAINTENANCE.pdf
PB_04SCHOOL MAINTENANCE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].