Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | L1 | Accepted-AOC lowest bid | |
| 2 | L2₹12.3 L+₹1.2 L (11.2%)Rejected-Finance | L2 | Rejected-Finance Higher bidder |
Tender Value
₹12.7 L
EMD Value
₹31,695
Closing Date
10 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst Executive Engineer
Office of the Asst Executive Engineer PWD Roads Sub Division Mananthavady, Wayanad PIN 670645
One year RC-Zone II-For various PWD Roads under Roads Section Thirunelly in Wayanad district- 1 Road stretches for a length of 3.700Km -One year RC-Zone II-For various PWD Roads under Roads section -Thirunelly in Wayanad district- 1 Road stre
2023_PWD_563131_1
PWD/RB/TR/3520/2023_5_1_1/2
Open Tender
Civil Works - Roads
Item Rate
365 days
WAYANAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,695
Yes
29 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
10 Mar 2023
2 Mar 2023
Amount
APPENDIX-A: Initial Rectification Works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD254012/2022-2023:Hiring Hydraulic excavator 1cum bucket capacity to remove accumulated earth and rock materials from the road as per the direction of Engineer in charge.
OD254013/2022-2023: Engaging tipper lorry 10 tone capacity for conveying excavated earth from the sides of road to a place of disposal
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
APPENDIX-B: Premonsoon Works
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
OD254008/2022-2023:Lifting the precast RCC covering slab from drain for removal of silt and placing the same slab in position after
OD254009/2022-2023: Engaging Mazdoor for various works
OD254010/2022-2023:Engaging woodcutter with tools and accessories required for cutting trees / branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without making any damages to nearby structures etc. complete
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
OD254011/2022-2023:Filling up potholes with bituminous readymix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of materials laying charges transportation to site etc.Complete rate is arrived for a bag of 25 kg. (Assuming a average of 30 bags of 25 kg readymix compound will be laid in potholes in a day)
APPENDIX-C: Preventive Maintenance Works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD254016/2022-2023: conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
APPENDIX-D: Emergency works
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
OD254014/2022-2023:Engaging woodcutter with tools and accessories required for cutting trees / branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without making any damages to nearby structures etc. complete
OD254015/2022-2023: Engaging Mazdoor for various works
VARKEY V J
Bidder Name
VARKEY V J
RAFEEQUE P.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_830093.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .