Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-Finance H NO 12 18 BAGATPURA OLD DC ROAD SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | ₹16.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹17.7 LAccepted-Finance BHIWANI | BHIWANI | HARYANA | 127021 | ₹17.7 L | L2 | Accepted-Finance L2 |
Tender Value
₹17.0 L
EMD Value
₹33,915
Closing Date
15 Apr 2026, 5:00 pmClosed
Pawan Kumar
DIV Sonepat
ROUGH COST ESTIMATE FOR CONSTRUCTION OF INTERNAL ROADS, PROVIDING INTERNAL WATER SUPPLY, SEWERAGE and SWD SCHEME IN THE AREA OF MUKHYA MANTRI AWAS YOJANA SITE, SECTOR - 13 and 14 PART, U/E, GOHANA (INCLUDING FIVE YEARS MAINTENANCE COST)- DEPOSIT WO
2026_HBC_513677_1
2026D64C9141 58E1 432B 9C12 134E6CB44638243HSV
Open Tender
Civil Works
180 days
Gohana
2 documents required · 2 mandatory
₹500
₹33,915
Yes
25 May 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
15 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | - | P.Cum | - | - |
| 2 | [10.6]Providing and laying of screed of 40 mm thick cement concrete 1:4:8 to be laid below the topping. [Through Rate] | - | P.Sqm | - | - |
| 3 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] | - | P.Sqm | - | - |
| 4 | [10.9]Providing and laying of Conglomerate floor 25 mm thick cement concrete 1:2:4 on 100 mm cement concrete 1:8:16 and 100 mm sand or stone filling. [Through Rate] | - | P.Sqm | - | - |
| 5 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate] | - | P.Sqm | - | - |
| 6 | [11.4.2]10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) [Through Rate] | - | P.Sqm | - | - |
| 7 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | P.Sqm | - | - |
| 8 | [11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [Through Rate] | - | P.Sqm | - | - |
| 9 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | P.Sqm | - | - |
| 10 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] | - | P.Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_592498.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid