Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC work awarded | |
| 2 | L2₹9.9 L+₹33,330 (3.49%)Rejected-Finance | L2 | Rejected-Finance Rejected being L2 firm/ contractor |
Tender Value
₹9.6 L
EMD Value
₹19,250
Closing Date
20 Aug 2021, 10:00 amClosed
Executive Engineer, Electrical Division, HP.PWD M
Executive Engineer, Electrical Division, HP.PWD Mandi
Laying additional oxygen, Vacuum , Air points in various wards of Shri Lal Bahadur Shastri Govt. Medical College and Hospital, Nerchowk Distt Mandi HP
2021_PWD_51120_1
PW/MED/TA/NIT/ e-notice/21-22-3221-31 dt 02.08.21
Open Tender
Electrical Works
Item Rate
60 days
Nerchowk
Please refer to bid document
11 documents required · 11 mandatory
₹350
Executive Engineer, Electrical Division, HP.PWD M
₹19,250
13 Oct 2021
13 Aug 2021
20 Aug 2021
13 Aug 2021
20 Aug 2021
13 Aug 2021
Amount
As per NFPA99 latest edition
TERMINAL / GAS OUTLETS
Oxygen
Surface mount, non interchangeable, self sealing outlets, outlets will consist of a roughing in assembly and a finishing assembly. A non removable positive- pin keying arrangement for each specific gas service. Installed in the mounting box a fully assembled brass secondary check valve.
Design of outlet will be such that it will have the feature to accept of probes & push button mechanism for quick release of adaptor. The secondary check valve automatically will form a positive seal to prevent a gas flow when the finishing assembly is removed. The secondary check valve to include 7’’ (17.78cm) of 1/2’’ Type K copper tubing with a label affixed which identifies the specific gas by name and colour. A plastic cap inserted at the end of the inlet tube. Rotation of the inlet tube will allow gas connection from the top or bottom. the finishing assembly will consists of a die cast chrome plated cover plate , a machined brass housing for the primary check valve, and a positive –pin keying device to prevent accidental installation into a roughing in assembly of a dismal gas. The finishing assembly incorporates a double seal arrangement which automatically engages when a hose adapter or patient treatment device is removed from the outlet.
The finishing assembly will have a colour coded (specific gas) keying disc to prevent connection of hose adapters or patient treatment device to the wrong gas service. The primary check allows absolutely no gas flow to take place until the keying devices are engaged. It will be manufactured in accordance with all applicable NFPA and CGA standards. The locking device will be in the probe instead of gas outlet.Matching probe for outlets – Imported as per NFPA -99 UL Listed Matching probes to the gas outlet mentioned above. That is adapter for Oxygen N2o, Air & vacuum / WAGD. Each adapter will have suitable barb or threads so that it can be connected to tube or flow meter /suction regulator. Adapter will have clear gas service embossed on it. It should be UL Listed.
Makes: Dragger, Becon Medeas, Aktive
Vacuum outlets (Specs same as Oxygen)
Humidifier Bottles with Probes
Ward Vacuum Unit 1000CC Jar
ULTIMED SOLUTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .