| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹64.7 LAccepted-AOC | ₹64.7 L | 1 | Accepted-AOC AOC |
| 2 | 2₹69.2 LRejected-Finance | ₹69.2 L | 2 | Rejected-Finance Rejected |
| 3 | 3₹72.1 LRejected-Finance 452 6 KRISHAN NAGAR TEHSIL CAMP PANIPAT 132103 | PANIPAT | HARYANA | 132103 | ₹72.1 L | 3 | Rejected-Finance Rejected |
| 4 | 4₹76.8 LRejected-Finance N A | ₹76.8 L | 4 | Rejected-Finance Rejected |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹81.7 L
EMD Value
₹1.6 L
Closing Date
10 Dec 2025, 5:00 pmClosed
Vikas Dhiman
Municipal Corporation Yamunanagar
Strengthning of CC Road with Mastic Asphalt, Road Widening with IPB and P/L of NP-2 Pipe from Shop of Pankaj Tyre (Palika Bazar) to Valmiki Mandir Via Govt Primery School in Ram Pura Colony, Ward No.-09, M.C Yamunanagar Jagadhri (Recall)
2025_HRY_485604_1
2025008C61FA DE1E 4A5A B029 26866F9DEDD4288ULB
Open Tender
Civil Works
170 days
Yamunanagar
2 documents required · 2 mandatory
₹5,000
₹1.6 L
Yes
17 Feb 2026
26 Nov 2025
11 Dec 2025
26 Nov 2025
10 Dec 2025
26 Nov 2025
26 Nov 2025 - 28 Nov 2025
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.52]Cement rendering on plaster 1 mm thick [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.23.1]Water Bound Macadam Grading - II 1. Water Bound Macadam (63mm to 45 mm) Grading I with screening Type “A” (13.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.37]Mastic Asphalt Providing and laying 25 mm/ 50 mm thick mastic asphalt wearing course with paving grade bitumen 85/25 or VG - 30/40 @ 10.2%, fine aggregates, course aggregates, lime filler @ 17.92% of total, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping at an approximate spacing of 10 cm centre to centre in both directions, pressed into surface when the temperature of surfaces is not less than 100C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 of MORT&H specifications (5th Revision, 2013) [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[20.62.2]Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS : 5382 and testing of SPIGOT AND SOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer - in -charge. 2. 250 mm i/d [Through Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.16.1.2]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.2. All kind of soil Pipes, cables etc, exceeding 80 mm dia but not exceeding 300 mm dia. [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_563637.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid