| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹98.1 LAccepted-AOC | ₹98.1 L | l1 | Accepted-AOC l1 |
| 2 | l2₹1.0 CrRejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | ₹1.0 Cr | l2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | K S Bigili L1 | DAISY JOSE L2 |
|---|---|---|---|---|---|
| 1.00Appendix A Construction of Bridge | |||||
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 104 | sqm | 410.81 ₹42,724.24 | 430.2 ₹44,740.80 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5.28 | cum | 2,331.43 ₹12,309.95 | 2,441.42 ₹12,890.70 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 27.5 | cum | 701.69 ₹19,296.48 | 734.79 ₹20,206.73 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 16.5 | cum | 1,589.42 ₹26,225.43 | 1,664.4 ₹27,462.60 |
| 1.00 | OD47722/2025-2026:Ring Bund Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top
width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and
filled in between with puddle clay to form bund for an average height 2.00m including labour
dismantling the bund after completion of the work etc. complete. | 189 | cum | 535.02 ₹1.0 L | 560.26 ₹1.1 L |
| 1.01 | 60.2.5:BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine and pump set above 25HP and up to 30HP, including conveyance to site and errection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 1,280 | hour | 1,064.23 ₹13.6 L | 1,114.43 ₹14.3 L |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 417.18 | cum | 238.64 ₹99,556.07 | 249.9 ₹1.0 L |
| 1.01 | OD33544/2024-2025:Supplying and stacking well matured straight 6m long coconut post having avg diameter on
25cm for driving down through various strata below bed level including cost coveyance
labour charges etc complete. | 1,728 | metre | 147.94 ₹2.6 L | 154.92 ₹2.7 L |
| 1.01 | OD33546/2024-2025:Driving down coconut pile to lines and levels through soft to medium clay soil strata including
all hire charges and labour and all other appliances necessary for pile driving down after
pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m
Details for 90m length. | 1,728 | metre | 228.14 ₹3.9 L | 238.9 ₹4.1 L |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
24 Feb 2026, 2:00 pmClosed
Superintending Engineer,MICC,EKM
office of the Superintending Engineer,MICC,EKM
Construction of bridge across Kaippettypuzha thode in ward 16 of Karumalloor Grama Panchayath in Kalamassery Constituency
2026_Irrig_837124_1
IRR/IA/TR/824/2025_5_1_1/1
Open Tender
Civil Works - Bridges
270 days
Karumalloor Grama Panchayath
pls refer tender documents
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
7 May 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
17 Feb 2026 - 24 Feb 2026
Appendix A Construction of Bridge
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD47722/2025-2026:Ring Bund Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.5:BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine and pump set above 25HP and up to 30HP, including conveyance to site and errection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD33544/2024-2025:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.
OD33546/2024-2025:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD33547/2024-2025:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1409580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 3.22 MB
BOQ_1409580.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid