| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAdmitted-Finance | ₹5.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹1.4 Cr (26.1%)Admitted-Finance | ₹7.0 Cr+₹1.4 Cr (26.1%) | L2 | Admitted-Finance |
| 3 | L3₹7.2 Cr+₹1.7 Cr (30.5%)Admitted-Finance REGD OFFICE 3 1742 NEAR EVERY DHARAM KANDA SIRSA ROAD MANSA 151505 PUNJAB | MANSA | MANSA | PUNJAB | 151505 | ₹7.2 Cr+₹1.7 Cr (30.5%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SKA INFRA PROJECT PRIVATE LIMITED L3 | M/s JAI LAXMI ROAD BUILDERS L2 | M/s Sonam Wangchuk Govt Contractor L1 |
|---|---|---|---|---|---|---|
| 1.00Providing and applying tack coat with bitumen emulsion using bitumen pressure distributor @2.5 Kg/10 Sqm on prepared primed and bituminous surface cleaned with mechanical broom confirming to Section 503 of MoRT&H specification for Road Bridge Works (5th Revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (For Correction work) | ||||||
| 1.10 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 5,048.18 | Sqm | 38 ₹1,91,830.84 Lowest | 55 ₹2,77,649.9 | 70 ₹3,53,372.6 |
| 1.20 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 3,104.07 | Sqm | 38 ₹1,17,954.66 Lowest | 55 ₹1,70,723.85 | 85 ₹2,63,845.95 |
| 2.00Providing, laying and compaction of DBM layer compacted thickness 50 mm confirming to section 505 of MoRT&H specification for road bridge work (5th revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (Correction work) | ||||||
| 2.10 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 252.41 | Cum | 22,500 ₹56,79,225 | 16,250 ₹41,01,662.5 | 15,000 ₹37,86,150 Lowest |
| 2.20 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 155.2 | Cum | 22,500 ₹34,92,000 | 16,250 ₹25,22,000 Lowest | 16,500 ₹25,60,800 |
| 3.00Providing and applying tack coat with bitumen emulsion using bitumen pressure distributor @2.5 Kg/10 Sqm on prepared primed and bituminous surface cleaned with mechanical broom confirming to Section 503 of MoRT&H specification for Road Bridge Works (5th Revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (For BC work) | ||||||
| 3.10 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 50,481.76 | Sqm | 32 ₹16,15,416.32 Lowest | 55 ₹27,76,496.8 | 70 ₹35,33,723.2 |
| 3.20 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 31,040.63 | Sqm | 32 ₹9,93,300.16 Lowest | 55 ₹17,07,234.65 | 80 ₹24,83,250.4 |
| 4.00Providing, laying and compaction of BC layer compacted thickness 30 mm over Dense Bituminous layer confirming to section 507 of MoRT&H specification for road bridge work (5th revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring | ||||||
Tender Value
₹3.7 Cr
EMD Value
₹4.5 L
Closing Date
23 Jul 2026, 6:00 pmClosed
Chief Engineer Project Himank
HQ CE (P) Himank, Choglamsar, Leh-Ladakh
Providing HMP ready mix, laying by paver and compaction for resurf wks with BC 30mm thk incl, cleaning of rd surf and applying tack coat on existing surf before laying BC for resurf wk, berm filling btwn Km 0.00 to Km 19.775 on P-M-HS road
2026_BRO_775718_1
Himank/04/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Km 0.00 to Km 19.775 on rd P-M-HS
As per tender documents
5 documents required · 5 mandatory
₹0
₹4.5 L
Yes
HQ CE (P) Himank
8 Aug 2026
1 Jul 2026
25 Jul 2026
2 Jul 2026
23 Jul 2026
16 Jul 2026
2 Jul 2026 - 15 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and applying tack coat with bitumen emulsion using bitumen pressure distributor @2.5 Kg/10 Sqm on prepared primed and bituminous surface cleaned with mechanical broom confirming to Section 503 of MoRT&H specification for Road Bridge Works (5th Revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (For Correction work) | |||||
| 1.1 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 5,048.18 | Sqm | - | - |
| 1.2 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 3,104.07 | Sqm | - | - |
| 2Providing, laying and compaction of DBM layer compacted thickness 50 mm confirming to section 505 of MoRT&H specification for road bridge work (5th revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (Correction work) | |||||
| 2.1 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 252.41 | Cum | - | - |
| 2.2 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 155.2 | Cum | - | - |
| 3Providing and applying tack coat with bitumen emulsion using bitumen pressure distributor @2.5 Kg/10 Sqm on prepared primed and bituminous surface cleaned with mechanical broom confirming to Section 503 of MoRT&H specification for Road Bridge Works (5th Revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring road (For BC work) | |||||
| 3.1 | Alt 4201 – 4500 Mtr (Km 0.000 to Km 12.250) | 50,481.76 | Sqm | - | - |
| 3.2 | Alt 4501 – 4800 Mtr (Km 12.250 to Km 19.775) | 31,040.63 | Sqm | - | - |
| 4Providing, laying and compaction of BC layer compacted thickness 30 mm over Dense Bituminous layer confirming to section 507 of MoRT&H specification for road bridge work (5th revision) for resurfacing works between Km 0.000 to Km 19.775 on Phobrang-Marshimik La-Hotspring | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
FinalTD.pdf
Tender Documents • 6.13 MB
BOQ_868668.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .