Tender Value
₹19.6 Cr
EMD Value
₹20 L
Closing Date
13 Jul 2024, 10:00 pmClosed
Karnataka Urban Infrastructure Development and Finance Corporation Limited
Ramya SR
08025196124
Providing and laying balance 10.63 KM UGD System in Sagara CMC limit (Land Acquisition Stretch) and Construction of 0.62 MLD Capacity Sequence batch reactor SBR technology STP at LB Nagara (Zone 5) under NGT Fund
KUIDFC/2024-25/WS/WORK_INDENT19
KUIDFC/2024-25/WS/WORK_INDENT19
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
KUIDFC Managing Director Office Bengaluru
7 documents required · 7 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /STP project/ water supply project/ combined water supply & sewerage project of value not less than Rs. 9.82 Crores
Executed in any one year of the last five years (2019-20 to 2023-24) the following minimum quantities of works: 1. Earthwork excavation in all kinds of soil by mechanical OR manual means.-23,676 cum, 2.Cement concrete (Including RCC and PCC)-970 cum, 3.TMT Steel 52 MT, 4.Machine holes OR manholes of RCC OR brick masonry of varying depths-270 Nos. 5. RCC NP3 OR DI OR u-PVC OR Stone ware OR MS pipes of dia. in the range of 150 mm to 600 mm dia.-8.5 km., Note-The certificate should be issued by an officer not below the rank of Executive Engineer or Equivalent or Employer in case of Govt / Semi Govt. Authorities and General Manager in case of Public Sector Undertaking.
The tenderer or his identified subcontractor should possess required valid electrical works and should have executed similar electrical works totaling to Rs. 13.42 lakhs in any one year
The tenderer or his identified subcontractor should possess experience in Construction of SBR Type STP minimum 0.50 MLD Capacity in any one year
availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished
Liquid assets and/or availability of credit facilities of not less than Rs 6.55 Crore (credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the format
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value.
Achieved at least two financial years a minimum annual financial turnover (in all classes of civil engineering construction works only) of Rs. 39.28 Crores. (The Consolidated Annual Financial turnover certificate for the relevant financial years certified by Statutory Auditor along with UDIN number (also the audited financial statements for each of the financial years to be submitted)
Affidavit regarding correctness of information furnished and documents submitted
Existing commitments and on-going works to be completed during the next one year
₹7,500
₹20 L
6 Jun 2024
6 Jun 2024
15 Jul 2024
24 Jun 2024
25 Jun 2024
Providing and laying balance 10.63 KM UGD System in Sagara CMC limit (Land Acquisition Stretch) and Construction of 0.62 MLD Capacity Sequence batch reactor SBR technology STP at LB Nagara (Zone 5)
Providing Sewer Pipeline and Machineholes in left out areas including restoration of roads includes the following works
a) Site cleaning , Earth Excavation in all kind of soils,including cutting an...
Construction of cement concrete road of 500 m approach road to existing 9 MLD STP which includes the following :
a) Scarifying of existing granular surface
b) Providing and Construction of dry lean c...
Construction of 0.62 MLD capacity SBR technology STP at L B Nagar of Zone 5 which includes the following:
a) Construction of PTU
b) Construction of 5 m dia wetwell cum pump house
c) Construction of S...
Rehabilitation of existing sewer line and machineholes including restoration of roads:
a) Dismantling of asphalt road surfaces and damaged machineholes of 1.2 m dia of 1 m to 2 m depth - 116 Nos.
Crossing of pipeline through state highway / National highway by Trenchless technology (manual jacking method) at 5 locations, total 250 m length, depth upto 6 m at 5 locations, Jacking of 600 mm dia ...
Construction of cement concrete road of 300 m approach road to existing Wet Well 2 near Agadi Matt which includes the following :
a) Scarifying of existing granular surface
b) Providing and Construct...
Construction of cement concrete road of 200 m approach road to existing Wet Well 3 near Police Quarters which includes the following :
a) Scarifying of existing granular surface
b) Providing and Cons...
O & M for 1st year Operation and maintenance of the STP, which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all mate...
O & M for 2nd year Operation and maintenance of the STP, which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all mate...
O & M for 3nd year Operation and maintenance of the STP, which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all mate...
O & M for 4th year Operation and maintenance of the STP, which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all mate...
O & M for 5th year Operation and maintenance of the STP, which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all mate...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Sagar-UWM-DBOT-Tender Document-Final-05-06-2024.docx
Others - Request for Quotation • 0.43 MB
SECTION-7_General Technical Specifications_Sagara-03.06.2024-R1V0.docx
Others - General Technical Specifications • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].