Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -5.00% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.4 L+₹4,597.63 (1.05%)Admitted-Finance | -4.00% | ₹4.4 L+₹4,597.63 (1.05%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹13,792.87 (3.16%)Admitted-Finance | -2.00% | ₹4.5 L+₹13,792.87 (3.16%) | L3 | Admitted-Finance |
| 4 | L3₹4.5 L+₹13,792.87 (3.16%)Admitted-Finance | -2.00% | ₹4.5 L+₹13,792.87 (3.16%) | L3 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.6 L
EMD Value
₹9,195
Closing Date
2 Jun 2026, 3:00 pmClosed
Executive Engineer-I(Wks)
Executive Engineer-I(Wks), SVPMC HQ
Renovation of motorable road starting from Shri.Arif house to Fire Brigade Quarters at Supply Line, Ward no.05.
2026_PMBC_23129_1
91/EE-I/Wks/MC/2026-27
Open Tender
Civil Works - Others
Works
90 days
ward no. 05
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,195
11 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.35 | cum | 5,053.43 | ₹1,768.7 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 3.5 | cum | 252.58 | ₹884.03 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.35 | cum | 9,693.48 | ₹3,392.72 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 21.91 | cum | 11,211.11 | ₹2,45,635.42 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.45 | cum | 15,443.75 | ₹6,949.69 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns | 26.24 | sqm | 558.03 | ₹14,642.71 |
| 7 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate | 7.5 | sqm | 874.01 | ₹6,555.08 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 49.5 | kg | 153.47 | ₹7,596.77 |
| 9 | 12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand) | 286.8 | sqm | 493.85 | ₹1,41,636.18 |
| 10 | Extra for making chequers of approved pattern on cement concrete floors, steps, landings, pavements etc. | 257.3 | sqm | 119.32 | ₹30,701.04 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
tenderdocument.pdf
Tender Documents • 1.03 MB
BOQ_24518.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .