| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M S DHERENDRA KUMAR PANDEY L1 | M/S RAM NATH SHUKLA L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift ,proper disposal and labour and T&P etc.complete work as directed by Engineer-in-Charge | 164.47 | M3 | 60 ₹9,868.2 Lowest | 70 ₹11,512.9 |
| 1.02 | Dismentaling Brick work or stone work and cement concrete in lime or cement mortar and including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 3.92 | M3 | 300 ₹1,176 Lowest | 300 ₹1,176 Lowest |
| 1.03 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 32.73 | M3 | 500 ₹16,365 Lowest | 600 ₹19,638 |
| 1.04 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge. | 644.17 | M3 | 60 ₹38,650.2 Lowest | 60 ₹38,650.2 Lowest |
| 1.05 | Centering and shuttering for C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 205.76 | M2 | 300 ₹61,728 Lowest | 300 ₹61,728 Lowest |
| 1.06 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 94.78 | M2 | 800 ₹75,824 Lowest | 800 ₹75,824 Lowest |
| 1.07 | Plain cement concrete in 1:3:6 in foundation with Coarse Sand having F.M. Not less than 2, crushed Stone aggregate of nominal size of 20 mm to 40 mm, mechanicaly mixed, placed in foundation and properly compacted including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 354.25 | M3 | 9,700 ₹34,36,263.8 Lowest | 10,200 ₹36,13,390.8 |
| 1.08 | Providing & Laying C.C. (1 : 2 : 4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 276.29 | M3 | 10,500 ₹29,01,034.5 Lowest | 10,500 ₹29,01,034.5 Lowest |
| 1.09 | Providing & laying First Class Brick Work 1:4 CM and coarse sand including with cost of material, T&P etc. as directed by Engineer-in-Charge | 357.65 | M3 | 6,400 ₹22,88,947.2 Lowest | 6,400 ₹22,88,947.2 Lowest |
| 1.10 | Struck Deep Cement Pointing 1:2 C.M. with coarse sand including with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge | 860.61 | M2 | 90 ₹77,454.9 Lowest | 100 ₹86,061 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
19 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Repair and Restoration Work of Damaged Bridges
2026_UPIDC_1147851_6
03/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Azamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,150
₹2.4 L
Yes
Azamgarh
10 Aug 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift ,proper disposal and labour and T&P etc.complete work as directed by Engineer-in-Charge | 164.47 | M3 | - | - |
| 1.02 | Dismentaling Brick work or stone work and cement concrete in lime or cement mortar and including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 3.92 | M3 | - | - |
| 1.03 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 32.73 | M3 | - | - |
| 1.04 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge. | 644.17 | M3 | - | - |
| 1.05 | Centering and shuttering for C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 205.76 | M2 | - | - |
| 1.06 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge | 94.78 | M2 | - | - |
| 1.07 | Plain cement concrete in 1:3:6 in foundation with Coarse Sand having F.M. Not less than 2, crushed Stone aggregate of nominal size of 20 mm to 40 mm, mechanicaly mixed, placed in foundation and properly compacted including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 354.25 | M3 | - | - |
| 1.08 | Providing & Laying C.C. (1 : 2 : 4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.with all leads and lift for proper completion of work as directed by Engineer-in-Charge | 276.29 | M3 | - | - |
| 1.09 | Providing & laying First Class Brick Work 1:4 CM and coarse sand including with cost of material, T&P etc. as directed by Engineer-in-Charge | 0.2 | M3 | - | - |
| 1.1 | Struck Deep Cement Pointing 1:2 C.M. with coarse sand including with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge | 860.61 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
BOQ_2148128.xls
BOQ • 0.24 MB
Biddocument6.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].