| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance 180 A VIKAS NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | -20.00% | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹34.7 L (12.5%)Admitted-Finance | -10.00% | ₹3.1 Cr+₹34.7 L (12.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Unqualified |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Unqualified |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
11 Mar 2026, 5:00 pmClosed
CE KDA
KDA KANPUR
Widening of 12m, 24m road and construction of Divider from Jawaharpuram Sector-13 to Shivali Raod
2026_UPKDA_1119490_1
E-355364/EE2/KDA/2025-26
Open Tender
Civil Works
Percentage
180 days
kanpur nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,260
FC
₹6.9 L
28 Apr 2026
23 Feb 2026
12 Mar 2026
23 Feb 2026
11 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Road Work | - | - | - | - |
| 1.02 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.SOR CH-4/2.32 | 7,875 | Sqm | 3 | ₹23,625 |
| 1.03 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause-401 S/R SANCTION RATE | 94.5 | CUM | 3,225 | ₹3,04,762.5 |
| 1.04 | Providing and applying priming coat with bitumen VG 10 on prepared surface of granular base including cleaning of road surface and spraying VG-10 @ 0.75 KG per sqm. using mechanical means. MORTH 502. SANCTION RATE | 3,585.75 | Sqm | 42.3 | ₹1,51,677.22 |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. Morth 406 (Sanction Rate) | 430.29 | CUM | 3,450 | ₹14,84,500.5 |
| 1.06 | Providing and applying tack coat with bitumen (Vg-10) pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom Both wheeled Roller 8 - 10 tonne capecity, finished to required level and grades Morth 503 (Sanction Rate) | 66,045 | Sqm | 14.8 | ₹9,77,466 |
| 1.07 | Providing and laying bituminous macadam with 100-120 TPH Hot Mix Plant producing an average output of 25 cum per hour using crushed aggregate of specified grading, premixed with bituminous binder (VG-30 @ 3.4 %) transported to site , laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. (as per MORTH Specification - 504) (Sanction Rate) | 1,651.13 | CUM | 8,420 | ₹1,39,02,514.6 |
| 1.08 | Semi-Dense Bituminous Concrete (S.DBC) (Using Water Plastic) providing and laying Semi- Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderSRMB-55 @ 5 per cent mix to work at site as per MORTH & H specification clause No. 508 complete in all respects (Reducing Bituminous Quantity by 8% and replacing it by Plastic wastage as per IRC SP 98-2013) Morth 508 (Sanction Rate) | 825.57 | CUM | 10,760 | ₹88,83,133.2 |
| 1.09 | Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. (mord 803) CH 26 | 802.73 | Sqm | 618 | ₹4,96,087.14 |
| 1.1 | Divider Work | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.21 MB
Tenderdocument.pdf
Tender Documents • 0.56 MB
BOQ_2081705.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .