| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹6.6 LRejected-AOC MASTHIKUND HOUSE CHENGALA POST KASARAGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | ₹6.6 L | L2 | Rejected-AOC Agreement executed by L1 |
| 3 | L3₹7.1 LRejected-Finance | ₹7.1 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ZUBAIR KA L3 | Hassan inshaf L1 | ABDUL NAZAR M A L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix A | ||||||
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 222 | sqm | 249.75 ₹55,444.50 | 227.75 ₹50,560.50 | 170 ₹37,740 |
| 1.00 | 14.46:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 3,487.19 | sqm | 17.6 ₹61,374.56 | 16.06 ₹56,004.29 | 12 ₹41,846.29 |
| 1.00 | 14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work | 644.38 | sqm | 77.4 ₹49,875.01 | 70.58 ₹45,480.34 | 83 ₹53,483.54 |
| 1.00 | 14.66.1:Finish walls with Acryllic Smooth exterior paint of required shade:Old work ( Two or more coats applied @ 1.67 ltr/10 sqm) on existing cement paint surface | 4,973.62 | sqm | 96.71 ₹4.8 L | 86.3 ₹4.3 L | 95 ₹4.7 L |
| 1.00 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 11,200 | per Letter per cm height | 4.58 ₹51,296 | 4.08 ₹45,696 | 4 ₹44,800 |
| 1.01 | OD301624/2024-2025:Engaging man coolie for various works such as cleaning building surroundings ,light bushes and jungle cutting ,sanitary works and necessary man power works including all equipment charges... | 8 | Day | 921.91 ₹7,375.28 | 560.02 ₹4,480.16 | 770 ₹6,160 |
| 1.01 | OD306204/2024-2025:Engaging carpenter for various repair works. | 5 | Day | 838.1 ₹4,190.50 | 612.29 ₹3,061.45 | 1,000 ₹5,000 |
Tender Value
₹8.5 L
EMD Value
₹21,173
Closing Date
4 Apr 2025, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PWD BUILDINGS SUB DIVISION, KASARAGOD
GENERAL-PWD COMPLEX-PWD COMPLEX KASARGOD -OUTSIDE PAINTING-General Civil Work
2025_PWD_756589_1
PWD/BLDG/TR/4697/2025_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
KASARAGOD
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,173
Yes
4 Mar 2026
29 Mar 2025
7 Apr 2025
29 Mar 2025
4 Apr 2025
29 Mar 2025
Amount
Appendix A
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
14.46:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
14.66.1:Finish walls with Acryllic Smooth exterior paint of required shade:Old work ( Two or more coats applied @ 1.67 ltr/10 sqm) on existing cement paint surface
13.71:Lettering with black Japan pint of approved brand and manufacture
OD301624/2024-2025:Engaging man coolie for various works such as cleaning building surroundings ,light bushes and jungle cutting ,sanitary works and necessary man power works including all equipment charges...
OD306204/2024-2025:Engaging carpenter for various repair works.
ABDUL NAZAR M A (BID ID -2186459)
ZUBAIR KA (BID ID -2186083)
Bidder Name
ZUBAIR KA
ABDUL NAZAR M A
Hassan inshaf
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1228927.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid